United States 111th Congress Status: Died

S 1573 — A bill to amend the Reclamation Wastewater and Groundwater Study and Facilities Act to authorize the Secretary of the Interior to participate in the city of Hermiston, Oregon, water recycling and reuse project, and for other purposes.

Last action — Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. With printed Hearing: S.Hrg. 111-619.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Amends the Reclamation Wastewater and Groundwater Study and Facilities Act to authorize the Secretary of the Interior to participate in design, planning, and construction of permanent facilities to reclaim and reuse water in the City of Hermiston, Oregon. Limits the federal share of project costs to 25% of the total. Prohibits the Secretary from providing funds for project operation and maintenance.

Bill Text

Sections of law this bill changes

1 section in 1 law

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Reclamation and irrigation of lands by federal government · 43 U.S.C. ch. 12 Amends the act as a whole

Action History

  1. Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. With printed Hearing: S.Hrg. 111-619.

  2. Read twice and referred to the Committee on Energy and Natural Resources.

  3. Sponsor introductory remarks on measure. (CR S8769)

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 0 co-sponsors · 303 not signed on

Sponsors (0)

None.

Co-sponsors (0)

None.

Not signed on (303)

303 members have not signed on to this bill.

Show all 303 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 1573 do?
Amends the Reclamation Wastewater and Groundwater Study and Facilities Act to authorize the Secretary of the Interior to participate in design, planning, and construction of permanent facilities to reclaim and reuse water in the City of Hermiston, Oregon. Limits the federal share of project costs to 25% of the total. Prohibits the Secretary from providing funds for project operation and maintenance.
What is the current status of S 1573?
This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 1573?
Track S 1573 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 1573

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 1573

Last checked for changes 20 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →