United States 111th Congress Status: Died

S 828 — Renewable Fuels Pipelines Act of 2009

Last action — Read twice and referred to the Committee on Energy and Natural Resources.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Renewable Fuels Pipelines Act of 2009 - Amends the Energy Policy Act of 2005 to allow federally-guaranteed loans for renewable fuel pipeline construction without regard to whether an appropriation for the cost has been made. Includes ethanol and biodiesel as renewable fuel. Allows a maximum guarantee by the Secretary of Energy of 90% of the pipeline project cost and more than one guarantee for a project (as long as the total guaranteed amount does not exceed 90%). Sets forth factors to be considered in guarantee determinations, including volume and quality of fuel, size of markets served, experience of the entity working with renewable fuel, and associated storage, production, and terminal facilities. Authorizes the Secretary to evaluate a project to assemble a renewable fuel pipeline as a complete project and, as a result of the size and nature of the project, to make a guarantee for an initial loan at a preliminary stage in the loan approval process for the complete project.

Bill Text

Sections of law this bill changes

5 sections in 1 law

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

National energy policy and programs · 42 U.S.C. ch. 149 5 sections
  • § 16511 Definitions Amends

    42 U.S.C. § 16511

    The law today

    In this subchapter: (1) Commercial technology (A) In general The term “commercial technology” means a technology in general use in the commercial marketplace. (B) Inclusions The term “commercial technology” does not include a technology solely by use of the technology in a demonstration project funded by the Department. (2) Cost The term “cost” has the meaning given the term “cost of a loan guarantee” within the meaning of section 661a(5)(C) of title 2. (3) Eligible project The term “eligible project” means a project described in section 16513 of this title. (4) Guarantee (A) In general The term “guarantee” has the meaning given the term “loan guarantee” in section 661a of title 2, except that a loan guarantee may guarantee any debt obligation of a non-Federal borrower to any Eligible Lender (as defined in section 609.2 of title 10, Code of Federal Regulations). (B) Inclusion The term “guarantee” includes a loan guarantee commitment (as defined in section 661a of title 2). (5) Obligation The term “obligation” means the loan or other debt obligation that is guaranteed under this section. (6) State The term “State” has the meaning given the term in section 6802 of this title. (7) State energy financing institution (A) In general The term “State energy financing institution” means a quasi-independent entity or an entity within a State agency or financing authority established by a State— (i) to provide financing support or credit enhancements, including loan guarantees and loan loss reserves, for eligible projects; and (ii) to create liquid markets for eligible projects, including warehousing and securitization, or take other steps to reduce financial barriers to the deployment of existing and new eligible projects. (B) Inclusion The term “State energy financing institution” includes an entity or organization established to achieve the purposes described in clauses (i) and (ii) of subparagraph (A) by an Indian Tribal entity or an Alaska Native Corporation.

    44 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 16512 Terms and conditions Amends

    42 U.S.C. § 16512 — at 16512(b) and 16512(c)

    The law today

    (a) In general Except for division C of Public Law 108–324 [15 U.S.C. 720 et seq.], the Secretary shall make guarantees under this or any other Act for projects, including projects receiving financial support or credit enhancements from a State energy financing institution, on such terms and conditions as the Secretary determines, after consultation with the Secretary of the Treasury, only in accordance with this section. (b) Specific appropriation or contribution (1) In general Except as provided in paragraph (2), the cost of a guarantee shall be paid by the Secretary using an appropriation made for the cost of the guarantee, subject to the availability of such an appropriation. (2) Insufficient appropriations If sufficient appropriated funds to pay the cost of a guarantee are not available, then the guarantee shall not be made unless— (A) the Secretary has received from the borrower a payment in full for the cost of the guarantee and deposited the payment into the Treasury; or (B) a combination of one or more appropriations and one or more payments from the borrower under this subsection has been made that is sufficient to cover the cost of the guarantee. (3) Source of payments The source of a payment received from a borrower under subparagraph (A) or (B) of paragraph (2) may not be a loan or other debt obligation that is made or guaranteed by the Federal Government. (c) Amount Unless otherwise provided by law, a guarantee by the Secretary shall not exceed an amount equal to 80 percent of the project cost of the facility that is the subject of the guarantee, as estimated at the time at which the guarantee is issued. (d) Repayment (1) Requirement (A) In general No guarantee, including a guarantee for a project receiving financial support or credit enhancements from a State energy financing institution, shall be made unless the Secretary determines that there is reasonable prospect of repayment of the principal and interest on the obligation by the borrower. (B) Reasonable prospect of repayment The Secretary shall base a determination of whether there is reasonable prospect of repayment under subparagraph (A) on a comprehensive evaluation of whether the borrower has a reasonable prospect of repaying the guaranteed obligation for the eligible project, including, as applicable, an evaluation of— (i) the strength of the contractual terms of the eligible project (if commercially reasonably available); (ii) the forecast of noncontractual cash flows supported by market projections from reputable sources, as determined by the Secretary; (iii) cash sweeps and other structure enhancements; (iv) the projected financial strength of the borrower— (I) at the time of loan close; and (II) throughout the loan term after the project is completed; (v) the financial strength of the investors and strategic partners of the borrower, if applicable; and (vi) other financial metrics and analyses that are relied on by the private lending community and nationally recognized credit rating agencies, as determined appropriate by the Secretary. (2) Amount No guarantee shall be made unless the Secretary determines that the amount of the obligation (when combined with amounts available to the borrower from other sources) will be sufficient to carry out the project. (3) Subordination The obligation shall be subject to the condition that the obligation, including any reorganization, restructuring, or termination thereof, shall not at any time be subordinate to other financing. (e) Interest rate An obligation shall bear interest at a rate that does not exceed a level that the Secretary determines appropriate, taking into account the prevailing rate of interest in the private sector for similar loans and risks. (f) Term The term of an obligation shall require full repayment over a period not to exceed the lesser of— (1) 30 years; or (2) 90 percent of the projected useful life of the physical asset to be financed by the obligation (as determined by the Secreta...

    50 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 16513 Eligible projects Amends

    42 U.S.C. § 16513

    The law today

    (a) In general The Secretary may make guarantees under this section only for projects that— (1) avoid, reduce, utilize, or sequester air pollutants or anthropogenic emissions of greenhouse gases; and (2) employ new or significantly improved technologies as compared to commercial technologies in service in the United States at the time the guarantee is issued, including projects that employ elements of commercial technologies in combination with new or significantly improved technologies. (b) Categories Projects from the following categories shall be eligible for a guarantee under this section: (1) Renewable energy systems. (2) Advanced fossil energy technology (including coal gasification meeting the criteria in subsection (d)). (3) Hydrogen fuel cell technology for residential, industrial, or transportation applications. (4) Advanced nuclear energy facilities, including manufacturing of nuclear supply components for advanced nuclear reactors. (5) Carbon capture, utilization, and sequestration practices and technologies, including— (A) agricultural and forestry practices that store and sequester carbon; and (B) synthetic technologies to remove carbon from the air and oceans. (6) Efficient electrical generation, transmission, and distribution technologies. (7) Efficient end-use energy technologies. (8) Production facilities for the manufacture of fuel efficient vehicles or parts of those vehicles, including electric drive vehicles and advanced diesel vehicles. (9) Pollution control equipment. (10) Refineries, meaning facilities at which crude oil is refined into gasoline. (11) Energy storage technologies for residential, industrial, transportation, and power generation applications. (12) Technologies or processes for reducing greenhouse gas emissions from industrial applications, including iron, steel, cement, and ammonia production, hydrogen production, and the generation of high-temperature heat. (13) Projects that increase the domestically produced supply of critical minerals (as defined in section 1606(a) of title 30), including through the production, processing, manufacturing, recycling, or fabrication of mineral alternatives. (c) Gasification projects The Secretary may make guarantees for the following gasification projects: (1) Integrated gasification combined cycle projects Integrated gasification combined cycle plants meeting the emission levels under subsection (d), including— (A) projects for the generation of electricity— (i) for which, during the term of the guarantee— (I) coal, biomass, petroleum coke, or a combination of coal, biomass, and petroleum coke will account for at least 65 percent of annual heat input; and (II) electricity will account for at least 65 percent of net useful annual energy output; (ii) that have a design that is determined by the Secretary to be capable of accommodating the equipment likely to be necessary to capture the carbon dioxide that would otherwise be emitted in flue gas from the plant; (iii) that have an assured revenue stream that covers project capital and operating costs (including servicing all debt obligations covered by the guarantee) that is approved by the Secretary and the relevant State public utility commission; and (iv) on which construction commences not later than the date that is 3 years after the date of the issuance of the guarantee; (B) a project to produce energy from coal (of not more than 13,000 Btu/lb and mined in the western United States) using appropriate advanced integrated gasification combined cycle technology that minimizes and offers the potential to sequester carbon dioxide emissions and that— (i) may include repowering of existing facilities; (ii) may be built in stages; (iii) shall have a combined output of at least 100 megawatts; (iv) shall be located in a western State at an altitude greater than 4,000 feet; and (v) shall demonstrate the ability to use coal with an energy content of not more than 9,000 Btu/lb; (C) a project located in a tacon...

    83 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 16514 Authorization of appropriations Amends

    42 U.S.C. § 16514

    The law today

    (a) In general There are authorized to be appropriated such sums as are necessary to provide the cost of guarantees under this subchapter. (b) Use of other appropriated funds The Department may use amounts awarded under the Clean Coal Power Initiative to carry out the project described in section 16513(c)(1)(C) of this title, on the request of the recipient of such award, for a loan guarantee, to the extent that the amounts have not yet been disbursed to, or have been repaid by, the recipient. (c) Administrative and other expenses There are authorized to be appropriated— (1) $32,000,000 for each of fiscal years 2021 through 2025 to carry out this subchapter; and (2) for fiscal year 2021, in addition to amounts authorized under paragraph (1), $25,000,000, to remain available until expended, for administrative expenses described in section 16512(h)(1) of this title that are not covered by fees collected pursuant to section 16512(h) of this title.

    26 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 16516 Omitted Amends

    42 U.S.C. § 16516 — at 16516(a)

    This section is omitted in the current Code.

    25 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Also cites: 15 U.S.C. § 717f, 42 U.S.C. § 7545

Action History

  1. Read twice and referred to the Committee on Energy and Natural Resources.

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 0 co-sponsors · 303 not signed on

Sponsors (0)

None.

Co-sponsors (0)

None.

Not signed on (303)

303 members have not signed on to this bill.

Show all 303 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 828 do?
Renewable Fuels Pipelines Act of 2009 - Amends the Energy Policy Act of 2005 to allow federally-guaranteed loans for renewable fuel pipeline construction without regard to whether an appropriation for the cost has been made. Includes ethanol and biodiesel as renewable fuel. Allows a maximum guarantee by the Secretary of Energy of 90% of the pipeline project cost and more than one guarantee for a project (as long as the total guaranteed amount does not exceed 90%). Sets forth factors to be considered in guarantee determinations, including volume and quality of fuel, size of markets served, experience of the entity working with renewable fuel, and associated storage, production, and terminal facilities. Authorizes the Secretary to evaluate a project to assemble a renewable fuel pipeline as a complete project and, as a result of the size and nature of the project, to make a guarantee for an initial loan at a preliminary stage in the loan approval process for the complete project.
What is the current status of S 828?
This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 828?
Track S 828 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 828

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 828

Last checked for changes 20 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →