S 672 — Natural Gas and Electricity Review and Enforcement Act
Last action — Read twice and referred to the Committee on Energy and Natural Resources.
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Natural Gas and Electricity Review and Enforcement Act - Amends the Natural Gas Act, the Natural Gas Policy Act of 1978, and the Federal Power Act to authorize the Federal Energy Regulatory Commission (FERC) to issue a temporary cease and desist order if it: (1) determines that any entity may be violating, may have violated, or may be about to violate any provision of such Acts or a FERC directive; and (2) finds that an alleged, threatened, or continued violation is likely to result in significant harm to either natural gas consumers or to the public interest. Amends the Federal Power Act to grant FERC emergency authority to change or suspend temporarily the rates, terms, or conditions of service on file with it before providing public notice and an opportunity for comment. Limits such temporary change or suspension to a period of not more than 30 days unless certain conditions are met.
Bill Text
- Introduced Introduced in Senate Current html March 24, 2009
Sections of law this bill changes
5 sections in 3 lawsFrom the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).
Natural gas · 15 U.S.C. ch. 15B 2 sections
-
§ 717d Fixing rates and charges; determination of cost of production or transportation Amends
15 U.S.C. § 717d — at 717d(a)
The law today
(a) Decreases in rates Whenever the Commission, after a hearing had upon its own motion or upon complaint of any State, municipality, State commission, or gas distributing company, shall find that any rate, charge, or classification demanded, observed, charged, or collected by any natural-gas company in connection with any transportation or sale of natural gas, subject to the jurisdiction of the Commission, or that any rule, regulation, practice, or contract affecting such rate, charge, or classification is unjust, unreasonable, unduly discriminatory, or preferential, the Commission shall determine the just and reasonable rate, charge, classification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall fix the same by order: Provided, however, That the Commission shall have no power to order any increase in any rate contained in the currently effective schedule of such natural gas company on file with the Commission, unless such increase is in accordance with a new schedule filed by such natural gas company; but the Commission may order a decrease where existing rates are unjust, unduly discriminatory, preferential, otherwise unlawful, or are not the lowest reasonable rates. (b) Costs of production and transportation The Commission upon its own motion, or upon the request of any State commission, whenever it can do so without prejudice to the efficient and proper conduct of its affairs, may investigate and determine the cost of the production or transportation of natural gas by a natural-gas company in cases where the Commission has no authority to establish a rate governing the transportation or sale of such natural gas.6 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 717s Enforcement of chapter Amends
15 U.S.C. § 717s
The law today
(a) Action in district court for injunction Whenever it shall appear to the Commission that any person is engaged or about to engage in any acts or practices which constitute or will constitute a violation of the provisions of this chapter, or of any rule, regulation, or order thereunder, it may in its discretion bring an action in the proper district court of the United States, or the United States courts of any Territory or other place subject to the jurisdiction of the United States, to enjoin such acts or practices and to enforce compliance with this chapter or any rule, regulation, or order thereunder, and upon a proper showing a permanent or temporary injunction or decree or restraining order shall be granted without bond. The Commission may transmit such evidence as may be available concerning such acts or practices or concerning apparent violations of the Federal antitrust laws to the Attorney General, who, in his discretion, may institute the necessary criminal proceedings. (b) Mandamus Upon application of the Commission the district courts of the United States and the United States courts of any Territory or other place subject to the jurisdiction of the United States shall have jurisdiction to issue writs of mandamus commanding any person to comply with the provisions of this chapter or any rule, regulation, or order of the Commission thereunder. (c) Employment of attorneys by Commission The Commission may employ such attorneys as it finds necessary for proper legal aid and service of the Commission or its members in the conduct of their work, or for proper representation of the public interest in investigations made by it, or cases or proceedings pending before it, whether at the Commission’s own instance or upon complaint, or to appear for or represent the Commission in any case in court; and the expenses of such employment shall be paid out of the appropriation for the Commission. (d) Violation of market manipulation provisions In any proceedings under subsection (a), the court may prohibit, conditionally or unconditionally, and permanently or for such period of time as the court determines, any individual who is engaged or has engaged in practices constituting a violation of section 717c–1 of this title (including related rules and regulations) from— (1) acting as an officer or director of a natural gas company; or (2) engaging in the business of— (A) the purchasing or selling of natural gas; or (B) the purchasing or selling of transmission services subject to the jurisdiction of the Commission.10 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Natural gas policy · 15 U.S.C. ch. 60 1 section
-
§ 3414 Enforcement Amends
15 U.S.C. § 3414
The law today
(a) General rule It shall be unlawful for any person to violate any provision of this chapter or any rule or order under this chapter. (b) Civil enforcement (1) In general Except as provided in paragraph (2), whenever it appears to the Commission that any person is engaged or about to engage in any act or practice which constitutes or will constitute a violation of any provision of this chapter, or of any rule or order thereunder, the Commission may bring an action in the District Court of the United States for the District of Columbia or any other appropriate district court of the United States to enjoin such act or practice and to enforce compliance with this chapter, or any rule or order thereunder. (2) Enforcement of emergency orders Whenever it appears to the President that any person has engaged, is engaged, or is about to engage in acts or practices constituting a violation of any order under section 3362 of this title or any order or supplemental order issued under section 3363 of this title, the President may bring a civil action in any appropriate district court of the United States to enjoin such acts or practices. (3) Repealed. Pub. L. 101–60, § 3(a)(4)(B), July 26, 1989, 103 Stat. 158 (4) Relief available In any action under paragraph (1) or (2), the court shall, upon a proper showing, issue a temporary restraining order or preliminary or permanent injunction without bond. In any such action, the court may also issue a mandatory injunction commanding any person to comply with any applicable provision of law, rule, or order, or ordering such other legal or equitable relief as the court determines appropriate, including refund or restitution. (5) Criminal referral The Commission may transmit such evidence as may be available concerning any acts or practices constituting any possible violations of the Federal antitrust laws to the Attorney General who may institute appropriate criminal proceedings. (6) Civil penalties (A) In general Any person who knowingly violates any provision of this chapter, or any provision of any rule or order under this chapter, shall be subject to— (i) except as provided in clause (ii) a civil penalty, which the Commission may assess, of not more than $1,000,000 for any one violation; and (ii) a civil penalty, which the President may assess, of not more than $1,000,000, in the case of any violation of an order under section 3362 of this title or an order or supplemental order under section 3363 of this title. (B) “Knowing” defined For purposes of subparagraph (A) the term “knowing” means the having of— (i) actual knowledge; or (ii) the constructive knowledge deemed to be possessed by a reasonable individual who acts under similar circumstances. (C) Each day separate violation For purposes of this paragraph, in the case of a continuing violation, each day of violation shall constitute a separate violation. (D) Statute of limitations No person shall be subject to any civil penalty under this paragraph with respect to any violation occurring more than 3 years before the date on which such person is provided notice of the proposed penalty under subparagraph (E). The preceding sentence shall not apply in any case in which an untrue statement of material fact was made to the Commission or a State or Federal agency by, or acquiesced to by, the violator with respect to the acts or omissions constituting such violation, or if there was omitted a material fact necessary in order to make any statement made by, or acquiesced to by, the violator with respect to such acts or omissions not misleading in light of circumstances under such statement was made. (E) Assessed by Commission Before assessing any civil penalty under this paragraph, the Commission shall provide to such person notice of the proposed penalty. Following receipt of notice of the proposed penalty by such person, the Commission shall, by order, asssess 1 such penalty. (F) Judicial review If the civil penalty has not been paid within 60 ...3 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Federal regulation and development of power · 16 U.S.C. ch. 12 2 sections
-
§ 824a Interconnection and coordination of facilities; emergencies; transmission to foreign countries Amends
16 U.S.C. § 824a
The law today
(a) Regional districts; establishment; notice to State commissions For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations. (b) Sale or exchange of energy; establishing physical connections Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commission finds that no undue burden will be placed upon such public utility thereby) to establish physical connection of its transmission facilities with the facilities of one or more other persons engaged in the transmission or sale of electric energy, to sell energy to or exchange energy with such persons: Provided, That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel such public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers. The Commission may prescribe the terms and conditions of the arrangement to be made between the persons affected by any such order, including the apportionment of cost between them and the compensation or reimbursement reasonably due to any of them. (c) Temporary connection and exchange of facilities during emergency (1) During the continuance of any war in which the United States is engaged, or whenever the Commission determines that an emergency exists by reason of a sudden increase in the demand for electric energy, or a shortage of electric energy or of facilities for the generation or transmission of electric energy, or of fuel or water for generating facilities, or other causes, the Commission shall have authority, either upon its own motion or upon complaint, with or without notice, hearing, or report, to require by order such temporary connections of facilities and such generation, delivery, interchange, or transmission of electric energy as in its judgment will best meet the emergency and serve the public interest. If the parties affected by such order fail to agree upon the terms of any arrangement between them in carrying out such order, the Commission, after hearing held either before or after such order takes effect, may prescribe by supplemental order such terms as it finds to be just and reasonable, including the compensation or reimbursement which should be paid to or by any such party. (2) With respect to an order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation, the Commission shall ensure that suc...37 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 825m Enforcement provisions Amends
16 U.S.C. § 825m
The law today
(a) Enjoining and restraining violations Whenever it shall appear to the Commission that any person is engaged or about to engage in any acts or practices which constitute or will constitute a violation of the provisions of this chapter, or of any rule, regulation, or order thereunder, it may in its discretion bring an action in the proper District Court of the United States or the United States courts of any Territory or other place subject to the jurisdiction of the United States, to enjoin such acts or practices and to enforce compliance with this chapter or any rule, regulation, or order thereunder, and upon a proper showing a permanent or temporary injunction or decree or restraining order shall be granted without bond. The Commission may transmit such evidence as may be available concerning such acts or practices to the Attorney General, who, in his discretion, may institute the necessary criminal proceedings under this chapter. (b) Writs of mandamus Upon application of the Commission the district courts of the United States and the United States courts of any Territory or other place subject to the jurisdiction of the United States shall have jurisdiction to issue writs of mandamus commanding any person to comply with the provisions of this chapter or any rule, regulation, or order of the Commission thereunder. (c) Employment of attorneys The Commission may employ such attorneys as it finds necessary for proper legal aid and service of the Commission or its members in the conduct of their work, or for proper representation of the public interests in investigations made by it or cases or proceedings pending before it, whether at the Commission’s own instance or upon complaint, or to appear for or represent the Commission in any case in court; and the expenses of such employment shall be paid out of the appropriation for the Commission. (d) Prohibitions on violators In any proceedings under subsection (a), the court may prohibit, conditionally or unconditionally, and permanently or for such period of time as the court determines, any individual who is engaged or has engaged in practices constituting a violation of section 824u of this title (and related rules and regulations) from— (1) acting as an officer or director of an electric utility; or (2) engaging in the business of purchasing or selling— (A) electric energy; or (B) transmission services subject to the jurisdiction of the Commission.8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Also cites: 15 U.S.C. § 717c
Compared against current U.S. Code AI-generated reading aid — verify against the official bill.
The bill introduces new cease-and-desist proceedings and modifies existing procedures for proposing changes in natural gas rates and enforcement actions.
-
15 U.S.C. 717s
(e) Cease-and-Desist Proceedings.-- ...(h) Regulations and Orders.--The Commission may promulgate such regulations and issue such orders as the Commission determines to be necessary to carry out this section.
New regulations allow the Commission to issue cease-and-desist orders when violations could cause significant harm.
-
15 U.S.C. 717d(a)
Whenever→ (1) In general.--IfAlters the opening of the rate-decrease provision to clarify that it applies only when specific findings are made.
-
15 U.S.C. 717d(a)
had→ heldClarifies the terminology related to hearings on rates.
-
15 U.S.C. 717d(a)
: Provided, however, That the→ (2) Limitation.--Notwithstanding paragraph (1), theChanges the structure of the rules regarding the Commission's powers over rate increases.
-
15 U.S.C. 3414
(d) Cease-and-Desist Proceedings.-- ...
Establishes cease-and-desist procedures for violations under the Natural Gas Policy Act, expanding enforcement capabilities.
Action History
-
Read twice and referred to the Committee on Energy and Natural Resources.
Sponsorship breakdown
Export CSV (upgrade) →0 sponsors · 0 co-sponsors · 303 not signed on
Sponsors (0)
None.
Co-sponsors (0)
None.
Not signed on (303)
303 members have not signed on to this bill.
Show all 303 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Frequently asked questions
- What does S 672 do?
- Natural Gas and Electricity Review and Enforcement Act - Amends the Natural Gas Act, the Natural Gas Policy Act of 1978, and the Federal Power Act to authorize the Federal Energy Regulatory Commission (FERC) to issue a temporary cease and desist order if it: (1) determines that any entity may be violating, may have violated, or may be about to violate any provision of such Acts or a FERC directive; and (2) finds that an alleged, threatened, or continued violation is likely to result in significant harm to either natural gas consumers or to the public interest. Amends the Federal Power Act to grant FERC emergency authority to change or suspend temporarily the rates, terms, or conditions of service on file with it before providing public notice and an opportunity for comment. Limits such temporary change or suspension to a period of not more than 30 days unless certain conditions are met.
- What is the current status of S 672?
- This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track S 672?
- Track S 672 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 672
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 672
Last checked for changes 21 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →