Summary

Weapon Systems Acquisition Reform Act of 2009 - Title I: Acquisition Organization - (Sec. 101) Establishes within the Department of Defense (DOD) a Director of Cost Assessment and Program Evaluation, to act as the principal advisor to the Secretary of Defense and other senior DOD officials and provide independent analysis and advice on matters relating to DOD acquisition program cost estimation and analysis, as well as related defense acquisition matters as assigned by the Secretary. Establishes under such Director a Deputy Director for Cost Assessment and a Deputy Director for Program Evaluation. Requires the: (1) Director to ensure that DOD cost estimation and cost analysis processes provide accurate information and realistic cost estimates for DOD acquisition programs; and (2) Secretary to ensure that the Director reviews acquisition program cost estimates, cost analyses, and related records for major defense acquisition programs (MDAPs) and major automated information system programs (MAISPs) of the military departments and defense agencies. Authorizes the Director to participate in and approve MDAP and MAISP cost estimates. Requires the: (1) Director, the Secretary of the military department concerned, and the head of the defense agency concerned to disclose the confidence level used in establishing a baseline estimate for an MDAP or MAISP; and (2) Director to report annually to the Secretary, the Under Secretary of Defense for Acquisition, Technology, and Logistics (Under Secretary), the Under Secretary of Defense (Comptroller), and the congressional defense and appropriations committees on DOD cost estimation and analysis activities. Transfers to the Office of the Director the functions and personnel of the Cost Analysis Improvement Group and the Office of Program Analysis and Evaluation. Requires: (1) the Director to review, and report to the Secretary on, existing DOD systems and methods for tracking and assessing MDAP operating and support costs; and (2) such report to be transmitted to the defense and appropriations committees. (Sec. 102) Establishes: (1) a Director of Developmental Test and Evaluation to advise the Secretary and the Under Secretary on DOD developmental test and evaluation; and (2) a Director of Systems Engineering to advise the Secretary and Under Secretary on DOD systems engineering and development planning. Outlines related duties. Requires such directors to jointly: (1) report to the defense and appropriations committees on activities undertaken; and (2) issue appropriate guidance with respect to DOD developmental test and evaluation and systems engineering, respectively. Directs the service acquisition executives of each military department and defense agency with responsibility for a MDAP to: (1) develop and implement plans to ensure that the department or agency has provided appropriate resources for developmental testing and developmental planning and systems engineering; and (2) report to the directors established under this section with respect to such plans and each such director's responsibilities. (Sec. 103) Directs the Secretary to designate a senior DOD official to conduct and oversee performance assessments and root cause analyses for MDAPs. Outlines related duties. Requires such official to report annually to the defense and appropriations committees on activities undertaken. (Sec. 104) Requires the Director of Defense Research and Engineering to: (1) periodically review and assess the technological maturity and integration risk of critical technologies of MDAPs, and submit findings to the Under Secretary; (2) report annually to the Secretary and the defense and appropriations committees on the maturity and risk of such technologies; (3) report to such committees on additional resources required to implement the results of the review and assessment; and (4) develop knowledge-based standards to measure the maturity and risk of critical technologies at key stages in the acquisition process. (Sec. 105) Directs the Joint Requirements Oversight Council (JROC) to seek and consider input from commanders of combatant commands prior to identifying joint military requirements. Requires the Comptroller General (CG) to report to the defense committees on the implementation of such requirement. Title II: Acquisition Policy - (Sec. 201) Requires: (1) the Secretary to ensure that mechanisms are developed and implemented to ensure the consideration of tradeoffs among cost, schedule, and performance objectives with respect to DOD acquisition programs; (2) the JROC to ensure such consideration with respect to joint military requirements; (3) the Secretary to ensure that each new joint military requirement recommended by the JROC is reviewed to ensure compliance with the tradeoffs consideration requirement and the JROC requirement to seek and consider input from commanders of combatant commands; and (4) the Director of Cost Assessment and Program Evaluation to lead the development of study guidance for an analysis of alternatives for each joint military requirement for which the JROC Chairman is the validation authority. (Sec. 202) Directs the Secretary to ensure that the acquisition strategy for each MDAP includes: (1) measures to ensure competition at both the prime contract and subcontract level of the MDAP throughout its life-cycle as a means to improve contractor performance; and (2) adequate documentation of the rationale for selection of the subcontractor tier or tiers. Outlines measures to ensure such competition. Requires the Secretary: (1) to take specified actions to ensure fair and objective "make-buy" decisions by prime contractors on MDAPs; and (2) whenever a decision regarding the source of repair results in a plan to award a contract for performance of maintenance and sustainment of a major weapon system, to ensure that such contract is awarded on a competitive basis with full consideration of all sources. (Sec. 203) Directs the Secretary to ensure that the acquisition strategy for each MDAP provides for competitive prototypes before Milestone B approval, unless the milestone decision authority (MDA) for that MDAP waives such requirement. Allows the MDA to waive the requirement only on the basis that: (1) the cost of producing competitive prototypes exceeds the expected life-cycle benefits of producing the prototypes; or (2) but for such waiver, DOD would be unable to meet critical national security objectives. Requires: (1) the defense and appropriations committees to be notified within 30 days after such a waiver; (2) the CG to be notified of such a waiver and its rationale; and (3) the CG to review such rationale, and report review results to the defense and appropriations committees. (Sec. 204) Requires a MDA, within 30 days after receiving notification from a program manager that the MDAP is experiencing cost or schedule delays of 25% or more, to report to the defense and appropriations committees identifying: (1) the root causes of the cost or schedule growth; and (2) appropriate acquisition performance measures for the remainder of the MDAP's development. Requires such report to also include either: (1) a certification of the necessity of the MDAP; or (2) a plan for terminating MDAP development or withdrawing Milestone A or Key Decision Point A approval. (Sec. 205) Directs a MDA who waives certain program certification requirements normally necessary before Milestone B or Key Decision Point B approval to, at least annually, review that MDAP to determine the extent to which it currently meets the waived requirements. Requires the current certification status of such MDAPs to be included in annual DOD budget justification documents. Requires a MDA to have received a preliminary design review and conducted a formal post-preliminary design review assessment before the MDAP may receive Milestone B or Key Decision Point B approval. Directs the MDA, for each MDAP that has not received Milestone C or Key Decision Point C approval, to: (1) determine whether or not the program satisfies specified certification components; and (2) annually review its progress in satisfying such components. Requires the current certification status of such MDAPs to be included in annual DOD budget justification documents. Directs the official assigned oversight of performance assessment, with respect to MDAPs that are restructured after experiencing critical cost growth and certified as necessary to continue, to annually review and assess the MDAP's success in achieving adequate program performance. (Sec. 206) Directs the Secretary, if the acquisition or procurement unit cost of an MDAP or designated major subprogram increases by a percentage equal to or greater than the critical cost growth threshold for the program or subprogram, to: (1) determine the root causes for the cost growth; and (2) terminate the program, unless the Secretary notifies Congress of the decision not to terminate. Allows such a program or subprogram to be continued only under limited conditions, including a certification that the program is essential to national security and there are no alternatives which will provide acceptable military capability at less cost. Allows a program to be restructured in a manner that addresses the root causes of the critical cost growth. Provides that when a program is restructured, the next Selected Acquisition Report for the program after the restructuring shall contain a description of all funding changes made in the budget as a result of the program's cost growth. Requires the Secretary to report to Congress on terminated programs. (Sec. 207) Directs the Secretary to revise the Defense Supplement to the Federal Acquisition Regulation to provide guidance and tighten existing requirements concerning organizational conflicts of interest by contractors in MDAPs. Requires the Panel on Contracting Integrity (established under the John Warner National Defense Authorization Act for Fiscal Year 2007) to present recommendations to the Secretary on measures to eliminate or mitigate organizational conflicts of interest in MDAPs. Directs the Panel to continue to serve until at least the end of 2011. Title III: Additional Acquisition Provisions - (Sec. 301) Requires the Secretary to carry out a program to recognize excellent performance by individuals and teams of members of the Armed Forces and civilian DOD personnel in the acquisition of products and services. Authorizes cash bonuses as part of the program. (Sec. 302) Amends the Duncan Hunter National Defense Authorization Act for Fiscal Year 2009 to require additional discussions and recommendations within a required report from the Secretary to the defense committees on DOD implementation of earned value management. (Sec. 303) Includes as a national security objective of the national technology and industrial base maintaining critical design skills to ensure that the Armed Forces are provided with systems capable of ensuring technological superiority over potential adversaries. Requires periodic defense capability assessments to consider the effects of the termination of MDAPs. (Sec. 304) Requires the CG to report to the defense and appropriations committees on: (1) growth in operating and support costs for major weapon systems; and (2) the results of a review of weaknesses in operations affecting the reliability of financial information on systems and assets to be acquired under MDAPs.

Bill Text

What changed in the latest version

1515 added · 782 removed

Plain-language change summary

The bill has undergone changes in its title and structure. The new title is “Weapons Acquisition System Reform Through Enhancing Technical Knowledge and Oversight Act of 2009” and it includes additional sections, such as those focusing on independent performance of acquisition oversight and oversight of cost estimation and systems engineering. This may impact how the Department of Defense manages the acquisition of major weapon systems by emphasizing enhanced oversight and competition during the acquisition process.

→
Previous
Latest
[Congressional Bills 111th Congress] [From the U.S.
[111th Congress Public Law 23] [From the U.S.
Government Publishing Office] [S.
Government Publishing Office] [[Page 1703]] WEAPON SYSTEMS ACQUISITION REFORM ACT OF 2009 [[Page 123 STAT.
454 Engrossed Amendment House (EAH)] In the House of Representatives, U.
1704]] Public Law 111-23 111th Congress An Act To improve the organization and procedures of the Department of Defense for the acquisition of major weapon systems, and for other purposes.
S., May 13, 2009.
<<NOTE:
Resolved, That the bill from the Senate (S.
May 22, 2009 - [S.
454) entitled ``An Act to improve the organization and procedures of the Department of Defense for the acquisition of major weapon systems, and for other purposes.'', do pass with the following AMENDMENT:
454]>> Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, <<NOTE:
Strike out all after the enacting clause and insert:
Weapon Systems Acquisition Reform Act of 2009.>> SECTION 1.
SECTION 1.
<<NOTE:
SHORT TITLE;
10 USC 101 note.>> SHORT TITLE;
(a) Short Title.--This Act may be cited as the ``Weapons Acquisition System Reform Through Enhancing Technical Knowledge and Oversight Act of 2009''.
(a) Short Title.--This Act may be cited as the ``Weapon Systems Acquisition Reform Act of 2009''.
Sec.
2.
Definitions.
Independent performance of acquisition oversight functions.
Cost assessment and program evaluation.
Oversight of cost estimation.
Directors of Developmental Test and Evaluation and Systems Engineering.
Oversight of systems engineering.
Performance assessments and root cause analyses for major defense acquisition programs.
Oversight of performance assessment.
Sec.
105.
106.
105.
Acquisition strategies ensuring competition throughout the lifecycle of major defense acquisition programs.
Consideration of trade-offs among cost, schedule, and performance objectives in Department of Defense acquisition programs.
Additional requirements for certain major defense acquisition programs.
Acquisition strategies to ensure competition throughout the lifecycle of major defense acquisition programs.
Requirement for certification of major systems prior to Milestone B.
Prototyping requirements for major defense acquisition programs.
Critical cost growth in major defense acquisition programs.
Actions to identify and address systemic problems in major defense acquisition programs prior to Milestone B approval.
Organizational conflicts of interest in the acquisition of major weapon systems.
Additional requirements for certain major defense acquisition programs.
Awards for Department of Defense personnel for excellence in the acquisition of products and services.
Critical cost growth in major defense acquisition programs.
Consideration of trade-offs among cost, schedule, and performance in the acquisition of major weapon systems.
Organizational conflicts of interest in major defense acquisition programs.
TITLE III--ADDITIONAL ACQUISITION PROVISIONS Sec.
301.
Awards for Department of Defense personnel for excellence in the acquisition of products and services.
Sec.
302.
Earned value management.
Sec.
303.
Expansion of national security objectives of the national technology and industrial base.
Sec.
304.
Comptroller General of the United States reports on costs and financial information regarding major defense acquisition programs.
SEC.
Show all 500 changed rows (460 more)
Previous
Latest
2.
<<NOTE:
10 USC 2430 note.>> DEFINITIONS.
In this Act:
(1) The term ``congressional defense committees'' has the meaning given that term in section 101(a)(16) of title 10, United States Code.
[[Page 123 STAT.
1705]] (2) The term ``major defense acquisition program'' has the meaning given that term in section 2430 of title 10, United States Code.
(3) The term ``major weapon system'' has the meaning given that term in section 2379(d) of title 10, United States Code.
INDEPENDENT PERFORMANCE OF ACQUISITION OVERSIGHT FUNCTIONS.
COST ASSESSMENT AND PROGRAM EVALUATION.
(a) In General.--Chapter 4 of title 10, United States Code, is amended by adding at the end the following new section:
(a) Director of Cost Assessment and Program Evaluation.-- (1) In general.--Chapter 4 of title 10, United States Code, is amended by inserting after section 139b the following new section:
145.
139c.
Principal advisors for acquisition oversight functions ``(a) Assignment of Acquisition Oversight Functions.--The Secretary of Defense shall designate an official within the Office of the Secretary of Defense as the principal advisor to the Secretary for each acquisition oversight function specified in subsection (c).
Director of Cost Assessment and Program Evaluation ``(a) Appointment.--There <<NOTE:
An official may be designated to perform one or more of such functions.
President.>> is a Director of Cost Assessment and Program Evaluation in the Department of Defense, appointed by the President, by and with the advice and consent of the Senate.
The performance of duties pursuant to a designation under this section shall not limit or otherwise affect the performance of any other duties assigned to such official by the Secretary or by other officers of the Department responsible for the management and direction of such official except as necessary to satisfy the requirements of subsection (b).
``(b) Independent Advice to Secretary of Defense.--(1) The Director of Cost Assessment and Program Evaluation is the principal advisor to the Secretary of Defense and other senior officials of the Department of Defense, and shall provide independent analysis and advice to such officials, on the following matters:
``(b) Qualifications.--In designating an official for a function pursuant to subsection (a), the Secretary shall ensure that the official reports directly to the Secretary in the performance of such function and is-- ``(1) highly expert in matters relating to the function;
``(A) Matters assigned to the Director pursuant to this section and section 2334 of this title.
``(2) assigned the appropriate staff and resources necessary to carry out the function;
``(B) Matters assigned to the Director by the Secretary pursuant to section 113 of this title.
``(3) independent from those engaged in the execution of acquisition programs;
``(2) The Director may communicate views on matters within the responsibility of the Director directly to the Secretary of Defense and the Deputy Secretary of Defense without obtaining the approval or concurrence of any other official within the Department of Defense.
``(4) free of any undue political influence;
``(c) Deputy Directors.--There are two Deputy Directors within the Office of the Director of Cost Assessment and Program Evaluation, as follows:
and ``(5) free of any personal conflict of interest.
``(1) The Deputy Director for Cost Assessment.
``(c) Acquisition Oversight Functions.--(1) The acquisition oversight functions to be performed by officials designated pursuant to subsection (a) are as follows:
``(2) The Deputy Director for Program Evaluation.
``(A) Cost estimation.
``(d) Responsibilities.--The Director of Cost Assessment and Program Evaluation shall serve as the principal official within the senior management of the Department of Defense for the following:
``(B) Systems engineering.
``(1) Cost estimation and cost analysis for acquisition programs of the Department of Defense, and carrying out the duties assigned pursuant to section 2334 of this title.
``(C) Performance assessment.
``(2) Analysis and advice on matters relating to the planning and programming phases of the Planning, Programming, Budgeting and Execution system, and the preparation of materials and guidance for such system, as directed by the Secretary of Defense, working in coordination with the Under Secretary of Defense (Comptroller).
``(D) Such other acquisition functions as the Secretary considers appropriate.
``(3) Analysis and advice for resource discussions relating to requirements under consideration in the Joint Requirements Oversight Council pursuant to section 181 of this title.
``(2) Each acquisition oversight function specified in paragraph (1) shall cover all phases of an acquisition program, including setting of requirements, formulation and execution of budgets, and program execution.''.
[[Page 123 STAT.
(b) Clerical Amendment.--The table of sections at the beginning of such chapter is amended by adding at the end the following new item:
1706]] ``(4) Formulation of study guidance for analyses of alternatives for major defense acquisition programs and performance of such analyses, as directed by the Secretary of Defense ``(5) Review, analysis, and evaluation of programs for executing approved strategies and policies, ensuring that information on programs is presented accurately and completely, and assessing the effect of spending by the Department of Defense on the United States economy.
``145.
``(6) Assessments of special access and compartmented intelligence programs, in coordination with the Under Secretary of Defense for Acquisition, Technology, and Logistics and the Under Secretary of Defense for Intelligence and in accordance with applicable policies.
Principal advisors for acquisition oversight functions.''.
``(7) Assessments of alternative plans, programs, and policies with respect to the acquisition programs of the Department of Defense.
SEC.
``(8) Leading the development of improved analytical skills and competencies within the cost assessment and program evaluation workforce of the Department of Defense and improved tools, data, and methods to promote performance, economy, and efficiency in analyzing national security planning and the allocation of defense resources.''.
102.
(2) Clerical amendment.--The table of sections at the beginning of chapter 4 of such title is amended by inserting after the item relating to section 139b the following new item:
OVERSIGHT OF COST ESTIMATION.
``139c.
(a) In General.--Chapter 137 of title 10, United States Code, is amended by adding at the end the following new section:
Director of Cost Assessment and Program Evaluation.''.
(3) Executive schedule level iv.--Section 5315 of title 5, United States Code, is amended by inserting after the item relating to the Director of Operational Test and Evaluation, Department of Defense the following new item:
``Director of Cost Assessment and Program Evaluation, Department of Defense.''.
(b) Independent Cost Estimation and Cost Analysis.-- (1) In general.--Chapter 137 of title 10, United States Code, is amended by adding at the end the following new section:
Acquisition oversight:
Independent cost estimation and cost analysis ``(a) In General.--The Director of Cost Assessment and Program Evaluation shall ensure that the cost estimation and cost analysis processes of the Department of Defense provide accurate information and realistic estimates of cost for the acquisition programs of the Department of Defense.
oversight of cost estimation ``(a) Issuance of Policies, Procedures, Guidance, and Cost Estimates.--The official assigned oversight of cost estimation pursuant to section 145 of this title shall issue the following:
In carrying out that responsibility, the Director shall-- ``(1) <<NOTE:
``(1) Policies and procedures governing the conduct of cost estimation and cost analysis generally for the acquisition programs of the Department of Defense.
Policies.>> prescribe, by authority of the Secretary of Defense, policies and procedures for the conduct of cost estimation and cost analysis for the acquisition programs of the Department of Defense;
``(2) Guidance relating to cost estimates and cost analyses conducted in connection with major defense acquisition programs under chapter 144 of this title or major automated information system programs under chapter 144A of this title.
``(2) <<NOTE:
``(3) Guidance relating to the proper selection of confidence levels for cost estimates generally, and specifically, for the proper selection of confidence levels for cost estimates for major defense acquisition programs under chapter 144 of this title or major automated information system program under chapter 144A of this title.
Consultation.>> provide guidance to and consult with the Secretary of Defense, the Under Secretary of Defense for Acquisition, Technology, and Logistics, the Under Secretary of Defense (Comptroller), the Secretaries of the military departments, and the heads of the Defense Agencies with respect to cost estimation in the Department of Defense in general and with respect to specific cost estimates and cost analyses to be conducted in connection with a major defense acquisition program [[Page 123 STAT.
``(4) Guidance relating to full consideration of life-cycle management and sustainability costs of major defense acquisition programs under chapter 144 of this title or major automated information system programs under chapter 144A of this title.
1707]] under chapter 144 of this title or a major automated information system program under chapter 144A of this title;
``(5) Independent cost estimates and cost analyses for major defense acquisition programs and major automated information system programs for which the Under Secretary of Defense for Acquisition, Technology, and Logistics is the Milestone Decision Authority-- ``(A) in advance of-- ``(i) any certification under section 2366a or 2366b of title 10, United States Code;
``(3) issue guidance relating to the proper selection of confidence levels in cost estimates generally, and specifically, for the proper selection of confidence levels in cost estimates for major defense acquisition programs and major automated information system programs;
``(4) issue guidance relating to full consideration of life- cycle management and sustainability costs in major defense acquisition programs and major automated information system programs;
``(5) review all cost estimates and cost analyses conducted in connection with major defense acquisition programs and major automated information system programs;
``(6) conduct independent cost estimates and cost analyses for major defense acquisition programs and major automated information system programs for which the Under Secretary of Defense for Acquisition, Technology, and Logistics is the Milestone Decision Authority-- ``(A) in advance of-- ``(i) any certification under section 2366a or 2366b of this title;
``(iii) any certification under section 2433(e)(2) of this title;
``(iii) any certification under section 2433a of this title;
and ``(B) at any other time considered necessary by such official or upon the request of the Under Secretary of Defense for Acquisition, Technology, and Logistics.
and ``(B) at any other time considered appropriate by the Director or upon the request of the Under Secretary of Defense for Acquisition, Technology, and Logistics;
``(b) Review of Cost Estimates, Cost Analyses, Cost Indexes, and Records of the Military Departments.--The Secretary of Defense shall ensure that the official designated for oversight of cost estimation pursuant to section 145 of this title-- ``(1) promptly receives the results of all cost estimates and cost analyses conducted by the military departments, and all studies conducted by the military departments in connection with such cost estimates and cost analyses, for major defense acquisition programs and major automated information systems of the military departments, and is authorized to comment on such estimates, analyses, and studies;
and ``(7) <<NOTE:
and ``(2) has timely access to any records and data in the Department of Defense (including the records and data of each military department and including classified and proprietary information as appropriate) that the official considers necessary to review in order to carry out any duties under this section.
Assessments.>> periodically assess and update the cost indexes used by the Department to ensure that such indexes have a sound basis and meet the Department's needs for realistic cost estimation.
``(c) Participation, Concurrence, and Approval in Cost Estimation.--The Secretary of Defense shall ensure that the official designated for oversight of cost estimation pursuant to section 145 of this title is involved in all discussions relating to cost estimation and the estimation of resource levels required for major defense acquisition programs and major automated information systems of the Department of Defense generally at all stages of such programs and may-- ``(1) participate in the formulation of study guidance for analyses of alternatives for major defense acquisition programs;
``(b) Review of Cost Estimates, Cost Analyses, and Records of the Military Departments and Defense Agencies.--The Secretary of Defense shall ensure that the Director of Cost Assessment and Program Evaluation-- ``(1) promptly receives the results of all cost estimates and cost analyses conducted by the military departments and Defense Agencies, and all studies conducted by the military departments and Defense Agencies in connection with such cost estimates and cost analyses, for major defense acquisition programs and major automated information system programs of the military departments and Defense Agencies;
``(2) participate in discussion of resources associated with requirements;
and ``(2) has timely access to any records and data in the Department of Defense (including the records and data of each military department and Defense Agency and including classified and proprietary information) that the Director considers necessary to review in order to carry out any duties under this section.
``(3) participate in the discussion of any discrepancies between an independent cost estimate and the cost estimate of a military department for a major defense acquisition program or major automated information system of the Department of Defense;
``(c) Participation, Concurrence, and Approval in Cost Estimation.-- The Director of Cost Assessment and Program Evaluation may-- ``(1) participate in the discussion of any discrepancies between an independent cost estimate and the cost estimate [[Page 123 STAT.
``(4) approve or disapprove, at such official's sole discretion, the confidence level used in establishing a baseline description or budget estimate for a major defense acquisition program or major automated information system of the Department of Defense at any of the events specified in paragraph (5) of subsection (a) of this section;
1708]] of a military department or Defense Agency for a major defense acquisition program or major automated information system program of the Department of Defense;
``(5) concur in the choice of a baseline description or budget estimate for use at any of the events specified in paragraph (5) of subsection (a) of this section;
``(2) comment on deficiencies in the methodology or execution of any cost estimate or cost analysis developed by a military department or Defense Agency for a major defense acquisition program or major automated information system program;
and ``(6) participate in consideration of any decision to request authorization of a multiyear procurement contract for a major defense acquisition program.
``(3) concur in the choice of a cost estimate within the baseline description or any other cost estimate (including the confidence level for any such cost estimate) for use at any event specified in subsection (a)(6);
``(d) Disclosure of Confidence Levels for Baseline Estimates of Major Defense Acquisition Programs.--The official designated to perform oversight of cost estimation pursuant to section 145 of this title, in approving a confidence level for use in a major defense acquisition program pursuant to subsection (c)(4), shall-- ``(1) disclose the confidence level used in establishing a baseline estimate for the major defense acquisition program, the rationale for selecting such confidence level, and, if such confidence level is less than 80 percent, the justification for selecting a confidence level of less than 80 percent;
and ``(4) participate in the consideration of any decision to request authorization of a multiyear procurement contract for a major defense acquisition program.
and ``(2) include the disclosure required by paragraph (1) in any decision documentation approving a baseline estimate for the major defense acquisition program, in the next Selected Acquisition Report pursuant to section 2432 of this title for the major defense acquisition program, and in the next annual report submitted under subsection (f).
``(d) Disclosure of Confidence Levels for Baseline Estimates of Major Defense Acquisition Programs.--The Director of Cost Assessment and Program Evaluation, and the Secretary of the military department concerned or the head of the Defense Agency concerned (as applicable), shall each-- ``(1) disclose in accordance with paragraph (2) the confidence level used in establishing a cost estimate for a major defense acquisition program or major automated information system program, the rationale for selecting such confidence level, and, if such confidence level is less than 80 percent, the justification for selecting a confidence level of less than percent;
``(e) Relationship to Cost Analysis Improvement Group.--The official designated to perform oversight of cost estimation pursuant to section 145 of this title shall be assigned responsibility for the management and oversight of the Cost Analysis Improvement Group of the Department of Defense.
and ``(2) include the disclosure required by paragraph (1)-- ``(A) in any decision documentation approving a cost estimate within the baseline description or any other cost estimate for use at any event specified in subsection (a)(6);
``(f) Annual Report.--Not later than March 1 of each year, beginning on March 1, 2010, the official designated to perform oversight of cost estimation pursuant to section 145 of this title shall submit to the congressional defense committees a report on the activities undertaken pursuant to this section during the preceding year.
and ``(B) in the next Selected Acquisition Report pursuant to section 2432 of this title in the case of a major defense acquisition program, or the next quarterly report pursuant to section 2445c of this title in the case of a major automated information system program.
The report shall be in an unclassified form but may include a classified annex.''.
``(e) Annual Report on Cost Assessment Activities.--(1) The Director of Cost Assessment and Program Evaluation shall prepare an annual report summarizing the cost estimation and cost analysis activities of the Department of Defense during the previous year and assessing the progress of the Department in improving the accuracy of its cost estimates and analyses.
(b) Clerical Amendment.--The table of sections at the beginning of such chapter is amended by adding at the end the following new item:
Each report shall include, for the year covered by such report, an assessment of-- ``(A) the extent to which each of the military departments and Defense Agencies have complied with policies, procedures, and guidance issued by the Director with regard to the preparation of cost estimates for major defense acquisition programs and major automated information systems;
``(B) the overall quality of cost estimates prepared by each of the military departments and Defense Agencies for major defense acquisition programs and major automated information system programs;
and ``(C) any consistent differences in methodology or approach among the cost estimates prepared by the military departments, the Defense Agencies, and the Director.
[[Page 123 STAT.
1709]] ``(2) Each report under this subsection shall be submitted concurrently to the Secretary of Defense, the Under Secretary of Defense for Acquisition, Technology, and Logistics, the Under Secretary of Defense (Comptroller), and the congressional defense committees not later than 10 days after the transmittal to Congress of the budget of the President for the next fiscal year (as submitted pursuant to section of title 31).
``(3)(A) Each report submitted to the congressional defense committees under this subsection shall be submitted in unclassified form, but may include a classified annex.
``(B) The Director shall ensure that a report submitted under this subsection does not include any information, such as proprietary or source selection sensitive information, that could undermine the integrity of the acquisition process.
``(C) <<NOTE:
Internet posting.
Public information.>> The unclassified version of each report submitted to the congressional defense committees under this subsection shall be posted on an Internet website of the Department of Defense that is available to the public.
``(4) The Secretary of Defense may comment on any report of the Director to the congressional defense committees under this subsection.
``(f) Staff.--The Secretary of Defense shall ensure that the Director of Cost Assessment and Program Evaluation has sufficient professional staff of military and civilian personnel to enable the Director to carry out the duties and responsibilities of the Director under this section.''.
(2) Clerical amendment.--The table of sections at the beginning of chapter 137 of such title is amended by adding at the end the following new item:
Acquisition oversight:
Independent cost estimation and cost analysis.''.
oversight of cost estimation.''.
(c) Transfer <<NOTE:
10 USC 139c note.>> of Personnel and Functions.-- (1) Transfer of functions.--The functions of the Office of Program Analysis and Evaluation of the Department of Defense, including the functions of the Cost Analysis Improvement Group, are hereby transferred to the Office of the Director of Cost Assessment and Program Evaluation.
(2) Transfer of personnel to deputy director for independent cost assessment.--The personnel of the Cost Analysis Improvement Group are hereby transferred to the Deputy Director for Cost Assessment in the Office of the Director of Cost Assessment and Program Evaluation.
(3) Transfer of personnel to deputy director for program analysis and evaluation.--The personnel (other than the personnel transferred under paragraph (2)) of the Office of Program Analysis and Evaluation are hereby transferred to the Deputy Director for Program Evaluation in the Office of the Director of Cost Assessment and Program Evaluation.
(d) Conforming Amendments.-- (1) Section 181(d) of title 10, United States Code, is amended by striking ``Director of the Office of Program Analysis and Evaluation'' and inserting ``Director of Cost Assessment and Program Evaluation''.
(2) Section 2306b(i)(1)(B) of such title is amended by striking ``Cost Analysis Improvement Group of the Department of Defense'' and inserting ``Director of Cost Assessment and Program Analysis''.
[[Page 123 STAT.
1710]] (3) Section 2366a(a)(4) of such title is amended by inserting ``, with the concurrence of the Director of Cost Assessment and Program Evaluation,'' after ``has been submitted''.
(4) Section 2366b(a)(1)(C) of such title is amended by inserting ``, with the concurrence of the Director of Cost Assessment and Program Evaluation,'' after ``have been developed to execute''.
(5) Subparagraph (A) of section 2434(b)(1) of such title is amended to read as follows:
``(A) be prepared or approved by the Director of Cost Assessment and Program Evaluation;
and''.
(6) Section 2445c(f)(3) of such title is amended by striking ``are reasonable'' and inserting ``have been determined, with the concurrence of the Director of Cost Assessment and Program Evaluation, to be reasonable''.
(e) Report on Monitoring of Operating and Support Costs for Major Defense Acquisition Programs.-- (1) Report <<NOTE:
Review.>> to secretary of defense.--Not later than one year after the date of the enactment of this Act, the Director of Cost Assessment and Program Evaluation under section 139c of title 10 United States Code (as added by subsection (a)), shall review existing systems and methods of the Department of Defense for tracking and assessing operating and support costs on major defense acquisition programs and submit to the Secretary of Defense a report on the finding and recommendations of the Director as a result of the review, including an assessment by the Director of the feasibility and advisability of establishing baselines for operating and support costs under section 2435 of title 10, United States Code.
(2) Transmittal to congress.--Not later than 30 days after receiving the report required by paragraph (1), the Secretary shall transmit the report to the congressional defense committees, together with any comments on the report the Secretary considers appropriate.
103.
102.
OVERSIGHT OF SYSTEMS ENGINEERING.
DIRECTORS OF DEVELOPMENTAL TEST AND EVALUATION AND SYSTEMS ENGINEERING.
(a) In General.--Chapter 137 of title 10, United States Code, as amended by section 102, is further amended by adding at the end the following new section:
(a) In General.-- (1) Establishment of positions.--Chapter 4 of title 10, United States Code, as amended by section 101(a) of this Act, is further amended by inserting after section 139c the following new section:
2334a.
139d.
Acquisition oversight:
Director of Developmental Test and Evaluation;
oversight of systems engineering ``(a) Issuance of Policies, Procedures, and Guidance.--The official designated to perform oversight of systems engineering pursuant to section 145 of this title shall-- ``(1) issue policies, procedures, and guidance for all elements of the Department of Defense concerning-- ``(A) the use of systems engineering principles and best practices, generally;
Director of Systems Engineering:
``(B) the use of systems engineering approaches to enhance reliability, availability, and maintainability on major defense acquisition programs;
joint guidance ``(a) Director of Developmental Test and Evaluation.-- ``(1) Appointment.--There is a Director of Developmental Test and Evaluation, who shall be appointed by the Secretary of Defense from among individuals with an expertise in test and evaluation.
``(C) the development of systems engineering master plans for major defense acquisition programs, including systems engineering considerations in support of life- cycle management and sustainability;
``(2) Principal advisor for developmental test and evaluation.--The Director shall be the principal advisor to the Secretary of Defense and the Under Secretary of Defense for Acquisition, Technology, and Logistics on developmental test and evaluation in the Department of Defense.
``(D) the inclusion of provisions relating to systems engineering and reliability growth in requests for proposals;
``(3) Supervision.--The Director shall be subject to the supervision of the Under Secretary of Defense for Acquisition, [[Page 123 STAT.
``(E) the appropriate use of development planning to reduce the time from system development to deployment, to reduce development risk and cost growth, and to provide future benchmarks against which to trade requirements, cost, and schedule;
1711]] Technology, and Logistics and shall report to the Under Secretary.
``(F) developmental test and evaluation generally;
``(4) Coordination with director of systems engineering.-- The Director of Developmental Test and Evaluation shall closely coordinate with the Director of Systems Engineering to ensure that the developmental test and evaluation activities of the Department of Defense are fully integrated into and consistent with the systems engineering and development planning processes of the Department.
``(G) in coordination with the Director of Operational Test and Evaluation, the integration of developmental test and evaluation with operational test and evaluation;
``(5) Duties.--The Director shall-- ``(A) <<NOTE:
``(H) in coordination with the Director of Operational Test and Evaluation, the development of test and evaluation master plans for major defense acquisition programs;
Policies.>> develop policies and guidance for-- ``(i) the conduct of developmental test and evaluation in the Department of Defense (including integration and developmental testing of software);
and ``(I) the use of developmental test and evaluation as part of a coordinated systems engineering approach to system development;
``(ii) in coordination with the Director of Operational Test and Evaluation, the integration of developmental test and evaluation with operational test and evaluation;
and ``(2) provide advocacy, oversight, and direction to elements of the acquisition workforce responsible for functions relating to systems engineering, developmental test and evaluation, and life-cycle management and sustainability.
``(iii) the conduct of developmental test and evaluation conducted jointly by more than one military department or Defense Agency;
``(b) Participation in Requirements Discussions.--The official designated to perform oversight of systems engineering pursuant to section 145 of this title shall provide input on the inclusion of systems engineering requirements in the process for consideration of joint military requirements by the Joint Requirements Oversight Council pursuant to section 181 of title 10, United States Code, including specific input relating to each capabilities development document.
``(B) review and approve the developmental test and evaluation plan within the test and evaluation master plan for each major defense acquisition program of the Department of Defense;
``(c) Access to Records of the Military Departments.--The official designated to perform oversight of systems engineering pursuant to section 145 of this title shall have access to any records or data of the Department of Defense (including the records and data of each military department and including classified and proprietary information as appropriate) that the official considers necessary to review in order to carry out any duties under this section.
``(C) monitor and review the developmental test and evaluation activities of the major defense acquisition programs;
``(d) Assessment of Military Department Capabilities for Systems Engineering and Developmental Test and Evaluation.--The official designated to perform oversight of systems engineering pursuant to section 145 of this title shall-- ``(1) periodically assess the capabilities of the military departments for systems engineering (including development planning) and developmental test and evaluation;
``(D) provide advocacy, oversight, and guidance to elements of the acquisition workforce responsible for developmental test and evaluation;
``(2) provide such assessment, along with such recommendations for improvement as the official considers necessary, to the Secretary of Defense and the Under Secretary of Defense for Acquisition, Technology, and Logistics;
``(E) periodically review the organizations and capabilities of the military departments with respect to developmental test and evaluation and identify needed changes or improvements to such organizations and capabilities, and provide input regarding needed changes or improvements for the test and evaluation strategic plan developed in accordance with section 196(d) of this title;
and ``(3) include such assessment and recommendations in the annual report required by subsection (g).
and ``(F) perform such other activities relating to the developmental test and evaluation activities of the Department of Defense as the Under Secretary of Defense for Acquisition, Technology, and Logistics may prescribe.
``(e) Review and Approval of Plans for Major Defense Acquisition Programs.--The official designated to perform oversight of systems engineering pursuant to section 145 of this title shall review and approve the following plans with respect to any major defense acquisition program:
``(6) Access to records.--The Secretary of Defense shall ensure that the Director has access to all records and data of the Department of Defense (including the records and data of each military department and including classified and propriety information, as appropriate) that the Director considers necessary in order to carry out the Director's duties under this subsection.
``(1) The systems engineering master plan.
``(7) Concurrent service as director of department of defense test resources management center.--The individual serving as the Director of Developmental Test and Evaluation may also serve concurrently as the Director of the Department of Defense Test Resource Management Center under section 196 of this title.
``(2) The developmental test and evaluation plan within the test and evaluation master plan.
``(b) Director of Systems Engineering.-- [[Page 123 STAT.
``(f) Reporting Through Under Secretary.--The official designated to perform oversight of systems engineering pursuant to section 145 of this title shall report to the Secretary of Defense through the Under Secretary of Defense for Acquisition, Technology, and Logistics.
1712]] ``(1) Appointment.--There is a Director of Systems Engineering, who shall be appointed by the Secretary of Defense from among individuals with an expertise in systems engineering and development planning.
``(g) Annual Report.--Not later than March 1 of each year, beginning on March 1, 2010, the official designated to perform oversight of systems engineering pursuant to section 145 of this title shall submit to the congressional defense committees a report on the activities undertaken pursuant to this section during the preceding year.
``(2) Principal advisor for systems engineering and development planning.--The Director shall be the principal advisor to the Secretary of Defense and the Under Secretary of Defense for Acquisition, Technology, and Logistics on systems engineering and development planning in the Department of Defense.
The report shall be in unclassified form but may include a classified annex.''.
``(3) Supervision.--The Director shall be subject to the supervision of the Under Secretary of Defense for Acquisition, Technology, and Logistics and shall report to the Under Secretary.
(b) Clerical Amendment.--The table of sections at the beginning of such chapter, as amended by section 102, is further amended by adding at the end the following new item:
``(4) Coordination with director of developmental test and evaluation.--The Director of Systems Engineering shall closely coordinate with the Director of Developmental Test and Evaluation to ensure that the developmental test and evaluation activities of the Department of Defense are fully integrated into and consistent with the systems engineering and development planning processes of the Department.
``2334a.
``(5) Duties.--The Director shall-- ``(A) <<NOTE:
Acquisition oversight:
Policies.>> develop policies and guidance for-- ``(i) the use of systems engineering principles and best practices, generally;
oversight of systems engineering.''.
``(ii) the use of systems engineering approaches to enhance reliability, availability, and maintainability on major defense acquisition programs;
``(iii) the development of systems engineering master plans for major defense acquisition programs including systems engineering considerations in support of lifecycle management and sustainability;
and ``(iv) the inclusion of provisions relating to systems engineering and reliability growth in requests for proposals;
``(B) review and approve the systems engineering master plan for each major defense acquisition program;
``(C) monitor and review the systems engineering and development planning activities of the major defense acquisition programs;
``(D) provide advocacy, oversight, and guidance to elements of the acquisition workforce responsible for systems engineering, development planning, and lifecycle management and sustainability functions;
``(E) provide input on the inclusion of systems engineering requirements in the process for consideration of joint military requirements by the Joint Requirements Oversight Council pursuant to section of this title, including specific input relating to each capabilities development document;
``(F) periodically review the organizations and capabilities of the military departments with respect to systems engineering, development planning, and lifecycle management and sustainability, and identify needed changes or improvements to such organizations and capabilities;
and [[Page 123 STAT.
1713]] ``(G) perform such other activities relating to the systems engineering and development planning activities of the Department of Defense as the Under Secretary of Defense for Acquisition, Technology, and Logistics may prescribe.
``(6) Access to records.--The Director shall have access to any records or data of the Department of Defense (including the records and data of each military department and including classified and proprietary information as appropriate) that the Director considers necessary to review in order to carry out the Director's duties under this subsection.
``(c) Joint Annual Report.--Not <<NOTE:
Effective date.>> later than March 31 each year, beginning in 2010, the Director of Developmental Test and Evaluation and the Director of Systems Engineering shall jointly submit to the congressional defense committees a report on the activities undertaken pursuant to subsections (a) and (b) during the preceding year.
Each report shall include a section on activities relating to the major defense acquisition programs which shall set forth, at a minimum, the following:
``(1) A discussion of the extent to which the major defense acquisition programs are fulfilling the objectives of their systems engineering master plans and developmental test and evaluation plans.
``(2) A discussion of the waivers of and deviations from requirements in test and evaluation master plans, systems engineering master plans, and other testing requirements that occurred during the preceding year with respect to such programs, any concerns raised by such waivers or deviations, and the actions that have been taken or are planned to be taken to address such concerns.
``(3) An assessment of the organization and capabilities of the Department of Defense for systems engineering, development planning, and developmental test and evaluation with respect to such programs.
``(4) Any comments on such report that the Secretary of Defense considers appropriate.
``(d) Joint Guidance.--The Director of Developmental Test and Evaluation and the Director of Systems Engineering shall jointly, in coordination with the official designated by the Secretary of Defense under section 103 of the Weapon Systems Acquisition Reform Act of 2009, issue guidance on the following:
``(1) The development and tracking of detailed measurable performance criteria as part of the systems engineering master plans and the developmental test and evaluation plans within the test and evaluation master plans of major defense acquisition programs.
``(2) The use of developmental test and evaluation to measure the achievement of specific performance objectives within a systems engineering master plan.
``(3) A system for storing and tracking information relating to the achievement of the performance criteria and objectives specified pursuant to this subsection.
``(e) Major Defense Acquisition Program Defined.--In this section, the term `major defense acquisition program' has the meaning given that term in section 2430 of this title.''.
(2) Clerical amendment.--The table of sections at the beginning of chapter 4 of such title, as amended by section [[Page 123 STAT.
1714]] 101(a) of this Act, is further amended by inserting after the item relating to section 139c the following new item:
``139d.
Director of Developmental Test and Evaluation;
Director of Systems Engineering:
joint guidance.''.
(b) Developmental <<NOTE:
10 USC 2430 note.>> Test and Evaluation and Systems Engineering in the Military Departments and Defense Agencies.-- (1) Plans.--The service acquisition executive of each military department and each Defense Agency with responsibility for a major defense acquisition program shall develop and implement plans to ensure the military department or Defense Agency concerned has provided appropriate resources for each of the following:
(A) Developmental testing organizations with adequate numbers of trained personnel in order to-- (i) ensure that developmental testing requirements are appropriately addressed in the translation of operational requirements into contract specifications, in the source selection process, and in the preparation of requests for proposals on all major defense acquisition programs;
(ii) participate in the planning of developmental test and evaluation activities, including the preparation and approval of a developmental test and evaluation plan within the test and evaluation master plan for each major defense acquisition program;
and (iii) participate in and oversee the conduct of developmental testing, the analysis of data, and the preparation of evaluations and reports based on such testing.
(B) Development planning and systems engineering organizations with adequate numbers of trained personnel in order to-- (i) support key requirements, acquisition, and budget decisions made for each major defense acquisition program prior to Milestone A approval and Milestone B approval through a rigorous systems analysis and systems engineering process;
(ii) include a robust program for improving reliability, availability, maintainability, and sustainability as an integral part of design and development within the systems engineering master plan for each major defense acquisition program;
and (iii) identify systems engineering requirements, including reliability, availability, maintainability, and lifecycle management and sustainability requirements, during the Joint Capabilities Integration Development System process, and incorporate such systems engineering requirements into contract requirements for each major defense acquisition program.
(2) Reports by service acquisition executives.--Not later than 180 days after the date of the enactment of this Act, the service acquisition executive of each military department and each Defense Agency with responsibility for a major defense acquisition program shall submit to the Director of [[Page 123 STAT.
1715]] Developmental Test and Evaluation and the Director of Systems Engineering a report on the extent to which-- (A) such military department or Defense Agency has implemented, or is implementing, the plan required by paragraph (1);
and (B) additional authorities or resources are needed to attract, develop, retain, and reward developmental test and evaluation personnel and systems engineers with appropriate levels of hands-on experience and technical expertise to meet the needs of such military department or Defense Agency.
(3) Assessment of reports by directors of developmental test and evaluation and systems engineering.--The first annual report submitted to Congress by the Director of Developmental Test and Evaluation and the Director of Systems Engineering under section 139d(c) of title 10, United States Code (as added by subsection (a)), shall include an assessment by the Directors of the reports submitted by the service acquisition executives to the Directors under paragraph (2).
103.
<<NOTE:
10 USC 2430 note.>> PERFORMANCE ASSESSMENTS AND ROOT CAUSE ANALYSES FOR MAJOR DEFENSE ACQUISITION PROGRAMS.
(a) Designation of Senior Official Responsibility for Performance Assessments and Root Cause Analyses.-- (1) In general.--The Secretary of Defense shall designate a senior official in the Office of the Secretary of Defense as the principal official of the Department of Defense responsible for conducting and overseeing performance assessments and root cause analyses for major defense acquisition programs.
(2) No program execution responsibility.--The Secretary shall ensure that the senior official designated under paragraph (1) is not responsible for program execution.
(3) Staff and resources.--The Secretary shall assign to the senior official designated under paragraph (1) appropriate staff and resources necessary to carry out official's function under this section.
(b) Responsibilities.--The senior official designated under subsection (a) shall be responsible for the following:
(1) Carrying out performance assessments of major defense acquisition programs in accordance with the requirements of subsection (c) periodically or when requested by the Secretary of Defense, the Under Secretary of Defense for Acquisition, Technology and Logistics, the Secretary of a military department, or the head of a Defense Agency.
(2) Conducting root cause analyses for major defense acquisition programs in accordance with the requirements of subsection (d) when required by section 2433a(a)(1) of title 10, United States Code (as added by section 206(a) of this Act), or when requested by the Secretary of Defense, the Under Secretary of Defense for Acquisition, Technology and Logistics, the Secretary of a military department, or the head of a Defense Agency.
(3) Issuing policies, procedures, and guidance governing the conduct of performance assessments and root cause analyses by the military departments and the Defense Agencies.
[[Page 123 STAT.
1716]] (4) Evaluating the utility of performance metrics used to measure the cost, schedule, and performance of major defense acquisition programs, and making such recommendations to the Secretary of Defense as the official considers appropriate to improve such metrics.
(5) Advising acquisition officials on performance issues regarding a major defense acquisition program that may arise-- (A) prior to certification under section 2433a of title 10, United States Code (as so added);
(B) prior to entry into full-rate production;
or (C) in the course of consideration of any decision to request authorization of a multiyear procurement contract for the program.
(c) Performance Assessments.--For purposes of this section, a performance assessment with respect to a major defense acquisition program is an evaluation of the following:
(1) The cost, schedule, and performance of the program, relative to current metrics, including performance requirements and baseline descriptions.
(2) The extent to which the level of program cost, schedule, and performance predicted relative to such metrics is likely to result in the timely delivery of a level of capability to the warfighter that is consistent with the level of resources to be expended and provides superior value to alternative approaches that may be available to meet the same military requirement.
(d) Root Cause Analyses.--For purposes of this section and section 2433a of title 10, United States Code (as so added), a root cause analysis with respect to a major defense acquisition program is an assessment of the underlying cause or causes of shortcomings in cost, schedule, or performance of the program, including the role, if any, of-- (1) unrealistic performance expectations;
(2) unrealistic baseline estimates for cost or schedule;
(3) immature technologies or excessive manufacturing or integration risk;
(4) unanticipated design, engineering, manufacturing, or technology integration issues arising during program performance;
(5) changes in procurement quantities;
(6) inadequate program funding or funding instability;
(7) poor performance by government or contractor personnel responsible for program management;
or (8) any other matters.
(e) Support of Applicable Capabilities and Expertise.--The Secretary of Defense shall ensure that the senior official designated under subsection (a) has the support of other Department of Defense officials with relevant capabilities and expertise needed to carry out the requirements of this section.
(f) Annual Report.--Not <<NOTE:
Effective date.>> later than March 1 each year, beginning in 2010, the official responsible for conducting and overseeing performance assessments and root cause analyses for major defense acquisition programs shall submit to the congressional defense committees a report on the activities undertaken under this section during the preceding year.
[[Page 123 STAT.
1717]] SEC.
OVERSIGHT OF PERFORMANCE ASSESSMENT.
(a) In General.--Chapter 137 of title 10, United States Code, as amended by section 103, is further amended by adding at the end the following new section:
``Sec.
2334b.
Acquisition oversight:
oversight of performance assessment ``(a) Issuance of Policies, Procedures, and Guidance for Performance Assessments.--The official designated to perform oversight of performance assessment pursuant to section 145 of this title shall be responsible for the issuance of policies, procedures, and guidance governing the conduct of performance assessments for the acquisition programs of the Department of Defense, including assessment of the extent to which acquisition programs-- ``(1) deliver sufficient capability to the warfighter;
``(2) achieve timely delivery of such capability;
and ``(3) deliver a level of value consistent with resources expended.
``(b) Assessment of Baseline Quality.--The official designated to perform oversight of performance assessment pursuant to section 145 of this title shall periodically assess the suitability of the baseline descriptions required by section 2435 of title 10, United States Code, of major defense acquisition programs for providing a basis for performance assessment and make such recommendations to the Secretary of Defense and the Under Secretary of Defense for Acquisition, Technology, and Logistics as the official considers necessary to improve the suitability of baseline descriptions for such purpose.
``(c) Earned Value Management System.--The official designated to perform oversight of performance assessment pursuant to section 145 of this title shall be responsible for the management and oversight of the records of the earned value management system of the Department of Defense.
``(d) Participation in Certain Program Reviews.--The official designated to perform oversight of performance assessment pursuant to section 145 of this title is authorized to present an assessment of the performance of a major defense acquisition program during-- ``(1) any discussions prior to certification under section 2433(e)(2) of this title;
``(2) any discussions prior to entry into full-rate production;
and ``(3) consideration of any decision to request authorization of a multiyear procurement contract for a major defense acquisition program.
``(e) Annual Report.--Not later than March 1 of each year, beginning on March 1, 2010, the official designated to perform oversight of performance assessment pursuant to section 145 of this title shall submit to the congressional defense committees a report on the activities undertaken pursuant to this section during the preceding year.
The report shall be in unclassified form but may include a classified annex.''.
(b) Clerical Amendment.--The table of sections at the beginning of such chapter, as amended by section 103, is further amended by adding at the end the following new item:
``2334b.
Acquisition oversight:
oversight of performance assessment.''.
SEC.
105.
``(c)(1) The Director of Defense Research and Engineering shall periodically review and assess the technological maturity and integration risk of critical technologies of the major defense acquisition programs of the Department of Defense and report on the findings of such reviews and assessments to the Under Secretary of Defense for Acquisition, Technology, and Logistics.
``(c)(1) <<NOTE:
``(2) The Director shall submit to the Secretary of Defense and to the congressional defense committees by January 1 of each year a report on the technological maturity and integration risk of critical technologies of the major defense acquisition programs of the Department of Defense.''.
Review.
(2) First annual report.--The first annual report under subsection (c)(2) of section 139a of title 10, United States Code (as added by paragraph (1)), shall be submitted to the congressional defense committees not later than March 1, 2011, and shall address the results of reviews and assessments conducted by the Director of Defense Research and Engineering pursuant to subsection (c)(1) of such section (as so added) during the preceding calendar year.
Reports.>> The Director of Defense Research and Engineering, in consultation with the Director of Developmental Test and Evaluation, shall periodically review and assess the technological maturity and integration risk of critical technologies of the major defense acquisition programs of the Department of Defense and report on the findings of such reviews and assessments to the Under Secretary of Defense for Acquisition, Technology, and Logistics.
``(2) <<NOTE:
Deadline.
Reports.>> The Director shall submit to the Secretary of Defense and to the congressional defense committees by March 1 of each year a report on the technological maturity and integration risk of critical technologies of the major defense acquisition programs of the Department of Defense.''.
(2) First <<NOTE:
10 USC 139a note.>> annual report.--The first annual report under subsection (c)(2) of section 139a of title 10, United States Code (as added by paragraph (1)), shall be submitted to the congressional defense committees not later than March 1, 2010, and shall address the results of reviews and assessments conducted by the Director of Defense Research and Engineering pursuant to subsection (c)(1) of such section (as so added) during the preceding calendar year.
(c) Technological <<NOTE:
Deadline.
10 USC 139a note.>> Maturity Standards.--Not later than 180 days after the date of the enactment of this Act, the Director of Defense Research and Engineering, in consultation with the Director of Developmental Test and Evaluation, shall develop knowledge-based standards against which to measure the technological maturity and integration risk of critical technologies at key stages in the acquisition process for purposes of conducting the reviews and assessments of major defense acquisition programs required by subsection (c) of section 139a of title 10, United States Code (as so added).
106.
105.
(a) In General.--Section 181(d) of title 10, United States Code, is amended-- (1) by inserting ``(1)'' before ``The Under Secretary'';
(a) In General.--Section 181(d) of title 10, United States Code, as amended by section 101(d) of this Act, is further amended-- [[Page 123 STAT.
1718]] (1) by inserting ``(1)'' before ``The Under Secretary'';
``(2) The Council shall seek and consider input from the commanders of the combatant commands in carrying out its mission under paragraphs (1) and (2) of subsection (b) and in conducting periodic reviews in accordance with the requirements of subsection (e).
``(2) The Council shall seek and consider input from the commanders of the combatant commands in carrying out its mission under paragraphs (1) and (2) of subsection (b) and in conducting periodic reviews in accordance with the requirements of subsection (e).''.
(b) Input <<NOTE:
10 USC 181 note.>> From Commanders of Combatant Commands.--The Joint Requirements Oversight Council in the Department of Defense shall seek and consider input from the commanders of combatant commands, in accordance with section 181(d) of title 10, United States Code (as amended by subsection (a)).
``(A) Any current or projected missions or threats in the theater of operations of the commander of a combatant command that would inform the assessment of a new joint military requirement.
(1) Any current or projected missions or threats in the theater of operations of the commander of a combatant command that would inform the assessment of a new joint military requirement.
``(B) The necessity and sufficiency of a proposed joint military requirement in terms of current and projected missions or threats.
(2) The necessity and sufficiency of a proposed joint military requirement in terms of current and projected missions or threats.
``(C) The relative priority of a proposed joint military requirement in comparison with other joint military requirements within the theater of operations of a commander of a combatant command.
(3) The relative priority of a proposed joint military requirement in comparison with other joint military requirements within the theater of operations of the commander of a combatant command.
``(D) The ability of partner nations in the theater of operations of the commander of a combatant command to assist in meeting the joint military requirement or the benefit, if any, of a partner nation assisting in development or use of technologies developed to meet the joint military requirement.''.
(4) The ability of partner nations in the theater of operations of the commander of a combatant command to assist in meeting the joint military requirement or the benefit, if any, of a partner nation assisting in development or use of technologies developed to meet the joint military requirement.
(b) Comptroller General of the United States Review of Implementation.--Not later than two years after the date of the enactment of this Act, the Comptroller General of the United States shall submit to the Committees on Armed Services of the Senate and the House of Representatives a report on the implementation of the requirements of (1) subsection (d)(2) of section 181 of title 10, United States Code (as amended by subsection (a)), for the Joint Requirements Oversight Council to solicit and consider input from the commanders of the combatant commands, and (2) subsection (b) of section of title 10, United States Code (as amended by section 942 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181;
(c) Comptroller General of the United States Review of Implementation.-- (1) Requirement.--Not <<NOTE:
Deadline.
Reports.>> later than two years after the date of the enactment of this Act, the Comptroller General of the United States shall submit to the Committees on Armed Services of the Senate and the House of Representatives a report on the implementation of the requirements of-- (A) subsection (d)(2) of section 181 of title 10, United States Code (as amended by subsection (a)), for the Joint Requirements Oversight Council to solicit and consider input from the commanders of the combatant commands;
(B) the amendments to subsection (b) of section 181 of title 10, United States Code, made by section 942 of the National Defense Authorization Act for Fiscal Year (Public Law 110-181;
287)).
287) and by section 201(b) of this Act;
The report shall include, at a minimum, an assessment of the extent to which the Council has effectively sought, and the commanders of the combatant commands have provided, meaningful input on proposed joint military requirements.
and (C) the requirements of section 201(c) of this Act.
(2) Matters covered.--The report shall include, at a minimum, an assessment of-- (A) the extent to which the Council has effectively sought, and the commanders of the combatant commands have provided, meaningful input on proposed joint military requirements;
(B) the quality and effectiveness of efforts to estimate the level of resources needed to fulfill joint military requirements;
and [[Page 123 STAT.
1719]] (C) the extent to which the Council has considered trade-offs among cost, schedule, and performance objectives.
ACQUISITION STRATEGIES ENSURING COMPETITION THROUGHOUT THE LIFECYCLE OF MAJOR DEFENSE ACQUISITION PROGRAMS.
CONSIDERATION OF TRADE-OFFS AMONG COST, SCHEDULE, AND PERFORMANCE OBJECTIVES IN DEPARTMENT OF DEFENSE ACQUISITION PROGRAMS.
(a) Acquisition Strategy Ensuring Competition.--The Secretary of Defense shall ensure that the acquisition strategy for each major defense acquisition program includes-- (1) measures to ensure competition, or the option of competition, at both the prime contract level and the subcontract level (at such tier or tiers as are appropriate) of such program throughout the life-cycle of such program as a means to improve contractor performance;
(a) Consideration <<NOTE:
10 USC 2302 note.>> of Trade-Offs.-- (1) In general.--The Secretary of Defense shall ensure that mechanisms are developed and implemented to require consideration of trade-offs among cost, schedule, and performance objectives as part of the process for developing requirements for Department of Defense acquisition programs.
(2) Elements.--The mechanisms required under this subsection shall ensure, at a minimum, that-- (A) Department of Defense officials responsible for acquisition, budget, and cost estimating functions are provided an appropriate opportunity to develop estimates and raise cost and schedule matters before performance objectives are established for capabilities for which the Chairman of the Joint Requirements Oversight Council is the validation authority;
and (B) the process for developing requirements is structured to enable incremental, evolutionary, or spiral acquisition approaches, including the deferral of technologies that are not yet mature and capabilities that are likely to significantly increase costs or delay production until later increments or spirals.
(b) Duties of Joint Requirements Oversight Council.--Section 181(b) of title 10, United States Code, is amended-- (1) in paragraph (1)-- (A) by striking ``and'' at the end of subparagraph (A);
(B) by inserting ``and'' at the end of subparagraph (B) after the semicolon;
and (C) by adding at the end the following new subparagraph:
``(C) in ensuring the consideration of trade-offs among cost, schedule, and performance objectives for joint military requirements in consultation with the advisors specified in subsection (d);''.
(2) in paragraph (3)-- (A) by inserting ``, in consultation with the Under Secretary of Defense (Comptroller), the Under Secretary of Defense for Acquisition, Technology, and Logistics, and the Director of Cost Assessment and Performance Evaluation,'' after ``assist the Chairman'';
and (B) by striking ``and'' after the semicolon at the end;
(3) in paragraph (4), by striking the period at the end and inserting ``;
and'';
and (4) by adding at the end the following new paragraph:
``(5) assist the Chairman, in consultation with the commanders of the combatant commands and the Under Secretary of Defense for Acquisition, Technology, and Logistics, in establishing an objective for the overall period of time within which [[Page 123 STAT.
1720]] an initial operational capability should be delivered to meet each joint military requirement.''.
(c) Review <<NOTE:
10 USC 181 note.>> of Joint Military Requirements.--The Secretary of Defense shall ensure that each new joint military requirement recommended by the Joint Requirements Oversight Council is reviewed to ensure that the Joint Requirements Oversight Council has, in making such recommendation-- (1) taken appropriate action to seek and consider input from the commanders of the combatant commands, in accordance with the requirements of section 181(d) of title 10, United States Code (as amended by section 105(a) of this Act);
(2) engaged in consideration of trade-offs among cost, schedule, and performance objectives in accordance with the requirements of section 181(b)(1)(C) of title 10, United States Code (as added by subsection (b));
and (3) engaged in consideration of issues of joint portfolio management, including alternative material and non-material solutions, as provided in Department of Defense instructions for the development of joint military requirements.
(d) Study <<NOTE:
10 USC 181 note.>> Guidance for Analyses of Alternatives.--The Director of Cost Assessment and Program Evaluation shall take the lead in the development of study guidance for an analysis of alternatives for each joint military requirement for which the Chairman of the Joint Requirements Oversight Council is the validation authority.
In developing the guidance, the Director shall solicit the advice of appropriate officials within the Department of Defense and ensure that the guidance requires, at a minimum-- (1) full consideration of possible trade-offs among cost, schedule, and performance objectives for each alternative considered;
and (2) an assessment of whether or not the joint military requirement can be met in a manner that is consistent with the cost and schedule objectives recommended by the Joint Requirements Oversight Council.
(e) Analysis of Alternatives in Certification for Milestone A.-- Section 2366a(a) of title 10, United States Code, as amended by section 101(d)(3) of this Act, is further amended-- (1) by striking ``and'' at the end of paragraph (3);
(2) by redesignating paragraph (4) as paragraph (5);
and (3) by inserting after paragraph (3) the following new paragraph (4):
``(4) that an analysis of alternatives has been performed consistent with study guidance developed by the Director of Cost Assessment and Program Evaluation;
and''.
(f) Duties of Milestone Decision Authority.--Section 2366b(a)(1)(B) of such title is amended by inserting ``appropriate trade-offs among cost, schedule, and performance objectives have been made to ensure that'' before ``the program is affordable''.
SEC.
202.
<<NOTE:
10 USC 2430 note.>> ACQUISITION STRATEGIES TO ENSURE COMPETITION THROUGHOUT THE LIFECYCLE OF MAJOR DEFENSE ACQUISITION PROGRAMS.
(a) Acquisition Strategies To Ensure Competition.--The Secretary of Defense shall ensure that the acquisition strategy for each major defense acquisition program includes-- (1) measures to ensure competition, or the option of competition, at both the prime contract level and the subcontract [[Page 123 STAT.
1721]] level (at such tier or tiers as are appropriate) of such program throughout the life-cycle of such program as a means to improve contractor performance;
(b) Measures To Ensure Competition.--The measures to ensure competition, or the option of competition, for purposes of subsection (a) may include measures to achieve the following, in appropriate cases if such measures are cost-effective:
(b) Measures To Ensure Competition.--The measures to ensure competition, or the option of competition, for purposes of subsection (a)(1) may include measures to achieve the following, in appropriate cases if such measures are cost-effective:
(4) Funding of a second source for interchangeable, next- generation prototype systems or subsystems.
(4) Funding of next-generation prototype systems or subsystems.
(10) Periodic system or program reviews to address long- term competitive effects of program decisions.
(10) Periodic system or program reviews to address long-term competitive effects of program decisions.
(c) Consideration of Competition Throughout Operation and Sustainment of Major Defense Acquisition Programs.--In carrying out this section, the Secretary of Defense shall ensure that, with respect to maintenance of a major defense acquisition program, consideration is given to capabilities within the Department of Defense to perform maintenance functions.
(c) Additional Measures To Ensure Competition at Subcontract Level.--The Secretary shall take actions to ensure fair and objective ``make-buy'' decisions by prime contractors on major defense acquisition programs by-- (1) requiring prime contractors to give full and fair consideration to qualified sources other than the prime contractor for the development or construction of major subsystems and components of major weapon systems;
(2) providing for government surveillance of the process by which prime contractors consider such sources and determine whether to conduct such development or construction in-house or through a subcontract;
and (3) providing for the assessment of the extent to which a contractor has given full and fair consideration to qualified sources other than the contractor in sourcing decisions as a part of past performance evaluations.
(d) Consideration of Competition Throughout Operation and Sustainment of Major Weapon Systems.--Whenever a decision regarding source of repair results in a plan to award a contract for performance of maintenance and sustainment of a major weapon system, the Secretary shall take actions to ensure that, to the maximum extent practicable and consistent with statutory requirements, contracts for such maintenance and sustainment are awarded on a competitive basis and give full consideration to all sources (including sources that partner or subcontract with public or private sector repair activities).
(e) Applicability.-- (1) Strategy and measures to ensure competition.--The requirements of subsections (a) and (b) shall apply to any acquisition plan for a major defense acquisition program that is developed or revised on or after the date that is 60 days after the date of the enactment of this Act.
[[Page 123 STAT.
1722]] (2) Additional <<NOTE:
Deadline.>> actions.--The actions required by subsections (c) and (d) shall be taken within 180 days after the date of the enactment of this Act.
202.
203.
<<NOTE:
Deadlines.
10 USC 2430 note.>> PROTOTYPING REQUIREMENTS FOR MAJOR DEFENSE ACQUISITION PROGRAMS.
(a) Competitive Prototyping.--Not later than 90 days after the date of the enactment of this Act, the Secretary of Defense shall modify the guidance of the Department of Defense relating to the operation of the acquisition system with respect to competitive prototyping for major defense acquisition programs to ensure the following:
(1) That the acquisition strategy for each major defense acquisition program provides for competitive prototypes before Milestone B approval (or Key Decision Point B approval in the case of a space program) unless the Milestone Decision Authority for such program waives the requirement pursuant to paragraph (2).
(2) <<NOTE:
Waiver authority.>> That the Milestone Decision Authority may waive the requirement in paragraph (1) only-- (A) on the basis that the cost of producing competitive prototypes exceeds the expected life-cycle benefits (in constant dollars) of producing such prototypes, including the benefits of improved performance and increased technological and design maturity that may be achieved through competitive prototyping;
or (B) on the basis that, but for such waiver, the Department would be unable to meet critical national security objectives.
(3) That whenever a Milestone Decision Authority authorizes a waiver pursuant to paragraph (2), the Milestone Decision Authority-- (A) shall require that the program produce a prototype before Milestone B approval (or Key Decision Point B approval in the case of a space program) if the expected life-cycle benefits (in constant dollars) of producing such prototype exceed its cost and its production is consistent with achieving critical national security objectives;
and (B) <<NOTE:
Notification.>> shall notify the congressional defense committees in writing not later than 30 days after the waiver is authorized and include in such notification the rationale for the waiver and the plan, if any, for producing a prototype.
(4) That prototypes may be required under paragraph (1) or (3) for the system to be acquired or, if prototyping of the system is not feasible, for critical subsystems of the system.
(b) Comptroller General Review of Certain Waivers.-- (1) Notice to comptroller general.--Whenever a Milestone Decision Authority authorizes a waiver of the requirement for prototypes pursuant to paragraph (2) of subsection (a) on the basis of excessive cost, the Milestone Decision Authority shall submit the notification of the waiver, together with the rationale, to the Comptroller General of the United States at the same time it is submitted to the congressional defense committees.
(2) Comptroller general review.--Not later than 60 days after receipt of a notification of a waiver under paragraph (1), the Comptroller General shall-- [[Page 123 STAT.
1723]] (A) review the rationale for the waiver;
and (B) submit to the congressional defense committees a written assessment of the rationale for the waiver.
SEC.
204.
ACTIONS TO IDENTIFY AND ADDRESS SYSTEMIC PROBLEMS IN MAJOR DEFENSE ACQUISITION PROGRAMS PRIOR TO MILESTONE B APPROVAL.
(a) Modification to Certification Requirement.--Subsection (a) of section 2366a of title 10, United States Code, is amended by striking ``may not receive Milestone A approval, or Key Decision Point A approval in the case of a space program,'' and inserting ``may not receive Milestone A approval, or Key Decision Point A approval in the case of a space program, or otherwise be initiated prior to Milestone B approval, or Key Decision Point B approval in the case of a space program,''.
(b) Modification to Notification Requirement.--Subsection (b) of such section is amended-- (1) by inserting ``(1)'' before ``With respect to'';
(2) in paragraph (1), as so designated, by striking ``by at least 25 percent,'' and inserting ``by at least 25 percent, or the program manager determines that the period of time required for the delivery of an initial operational capability is likely to exceed the schedule objective established pursuant to section 181(b)(5) of this title by more than 25 percent,'';
and (3) by adding at the end the following new paragraph:
``(2) Not <<NOTE:
Deadline.
Reports.>> later than 30 days after a program manager submits a notification to the Milestone Decision Authority pursuant to paragraph (1) with respect to a major defense acquisition program, the Milestone Decision Authority shall submit to the congressional defense committees a report that-- ``(A) identifies the root causes of the cost or schedule growth in accordance with applicable policies, procedures, and guidance;
``(B) identifies appropriate acquisition performance measures for the remainder of the development of the program;
and ``(C) includes one of the following:
``(i) <<NOTE:
Certification.>> A written certification (with a supporting explanation) stating that-- ``(I) the program is essential to national security;
``(II) there are no alternatives to the program that will provide acceptable military capability at less cost;
``(III) new estimates of the development cost or schedule, as appropriate, are reasonable;
and ``(IV) the management structure for the program is adequate to manage and control program development cost and schedule.
``(ii) <<NOTE:
Plan.>> A plan for terminating the development of the program or withdrawal of Milestone A approval, or Key Decision Point A approval in the case of a space program, if the Milestone Decision Authority determines that such action is in the interest of national defense.''.
(c) Application <<NOTE:
10 USC 2366a note.>> to Ongoing Programs.-- (1) In <<NOTE:
Certification.
Deadline.>> general.--Each major defense acquisition program described in paragraph (2) shall be certified in accordance with the requirements of section 2366a of title 10, United States [[Page 123 STAT.
1724]] Code (as amended by this section), within one year after the date of the enactment of this Act.
(2) Covered programs.--The requirement in paragraph (1) shall apply to any major defense acquisition program that-- (A) was initiated before the date of the enactment of this Act;
and (B) as of the date of certification under paragraph (1) has not otherwise been certified pursuant to either section 2366a (as so amended) or 2366b of title 10, United States Code.
SEC.
205.
``(2) Whenever the milestone decision authority makes such a determination and authorizes such a waiver-- ``(A) the waiver, the determination, and the reasons for the determination shall be submitted in writing to the congressional defense committees within 30 days after the waiver is authorized;
``(2) <<NOTE:
Determination.
Waiver authority.
Deadline.>> Whenever the milestone decision authority makes such a determination and authorizes such a waiver-- ``(A) the waiver, the determination, and the reasons for the determination shall be submitted in writing to the congressional defense committees within 30 days after the waiver is authorized;
``(e) Designation of Certification Status in Budget Documentation.--Any budget request, budget justification material, budget display, reprogramming request, Selected Acquisition Report, or other budget documentation or performance report submitted by the Secretary of Defense to the President regarding a major defense acquisition program receiving a waiver pursuant to subsection (d) shall prominently and clearly indicate that such program has not fully satisfied the certification requirements of this section until such time as the milestone decision authority makes the determination that such program has satisfied all certification components pursuant to subsection (d)(2)(B).'';
``(e) Designation of Certification Status in Budget Documentation.-- Any budget request, budget justification material, budget display, reprogramming request, Selected Acquisition Report, or other budget documentation or performance report submitted by the Secretary of Defense to the President regarding a major defense acquisition program receiving a waiver pursuant to subsection (d) shall prominently and clearly indicate that such program has not fully satisfied the certification requirements of this section until such time as the milestone decision authority makes the determination that such program has satisfied all such certification components.'';
(3) in subsection (a)-- (A) in paragraph (1), by striking ``and'' at the end;
and (3) in subsection (a)-- (A) in paragraph (1), by striking ``and'' at the end;
``(2) has received a preliminary design review and conducted a formal post-preliminary design review assessment, and certifies on the basis of such assessment that the program demonstrates a high likelihood of accomplishing its intended mission or that no preliminary design review is necessary for such program to demonstrate a high likelihood of accomplishing its intended mission;
[[Page 123 STAT.
1725]] ``(2) has received a preliminary design review and conducted a formal post-preliminary design review assessment, and certifies on the basis of such assessment that the program demonstrates a high likelihood of accomplishing its intended mission;
(b) Certification and Review of Programs Entering Development Prior to Enactment of Section 2366b of Title 10.-- (1) Determination.--(A) Except as provided in subparagraph (B), beginning not later than 270 days after the date of the enactment of this Act, for each major defense acquisition program that has not received a Milestone C approval, or Key Decision Point C approval in the case of a space program, the Milestone Decision Authority shall determine whether or not the program satisfies the certification components specified in paragraphs (1) and (2) of subsection (a) of section 2366b of title 10, United States Code.
(b) Certification <<NOTE:
(B) Subparagraph (A) shall not apply to a major defense acquisition program that has been reviewed pursuant to section 2366b of title 10, United States Code, prior to the date that is 270 days after the date of the enactment of this Act, or a major defense acquisition program that has not yet received Milestone B approval.
10 USC 2366b note.>> and Review of Programs Entering Development Prior to Enactment of Section 2366b of Title 10.-- (1) Determination.--Not <<NOTE:
(2) Annual review.--The Milestone Decision Authority shall review any program determined pursuant to paragraph (1) not to satisfy the certification components of subsection (a) of section 2366b of title 10, United States Code, not less often than annually thereafter to determine the extent to which such program currently satisfies the certification components specified in paragraphs (1) and (2) of subsection (a) of such section until such time as the Milestone Decision Authority determines that the program satisfies all such certification components.
Deadline.>> later than 270 days after the date of the enactment of this Act, for each major defense acquisition program that received Milestone B approval before January 6, 2006, and has not received Milestone C approval, and for each space program that received Key Decision Point B approval before January 6, 2006, and has not received Key Decision Point C approval, the Milestone Decision Authority shall determine whether or not such program satisfies all of the certification components specified in paragraphs (1) and (2) of subsection (a) of section 2366b of title 10, United States Code (as amended by subsection (a) of this section).
(3) Designation of certification status in budget documentation.--Any budget request, budget justification material, budget display, reprogramming request, Selected Acquisition Report, or other budget documentation or performance report submitted by the Secretary of Defense to the President regarding a major defense acquisition program which the Milestone Decision Authority determines under paragraph (1) does not satisfy the certification components specified in paragraphs (1) and (2) of subsection (a) of section 2366b of title 10, United States Code, shall prominently and clearly indicate that such program has not fully satisfied such certification components until such time as the Milestone Decision Authority makes the determination that such program has satisfied all certification components pursuant to paragraph (2).
(2) Annual review.--The Milestone Decision Authority shall review any program determined pursuant to paragraph (1) not to satisfy any of the certification components of subsection (a) of section 2366b of title 10, United States Code (as so amended), not less often than annually thereafter to determine the extent to which such program currently satisfies such certification components until such time as the Milestone Decision Authority determines that such program satisfies all such certification components.
(c) Reviews of Programs Restructured After Experiencing Critical Cost Growth.--The official designated to perform oversight of performance assessment pursuant to section 145 of title 10, United States Code, as added by this Act, shall annually review each major defense acquisition program that has been considered pursuant to paragraph (2) of section 2433(e) of title 10, United States Code, and which has been certified as necessary to continue pursuant to such paragraph, to assess the success of the program in achieving adequate program performance after the completion of such consideration.
(3) Designation of certification status in budget documentation.--Any budget request, budget justification material, budget display, reprogramming request, Selected Acquisition Report, or other budget documentation or performance report submitted by the Secretary of Defense to the President regarding a major defense acquisition program which the Milestone Decision Authority determines under paragraph (1) does not satisfy all of the certification components of subsection (a) of section 2366b of title 10, United States Code, (as so amended) shall prominently and clearly indicate that such program has not fully satisfied such certification components until such time as the Milestone Decision Authority makes the determination that such program has satisfied all such certification components.
The results of reviews performed pursuant to this subsection shall be included in the next annual report of such official.
(c) Reviews <<NOTE:
10 USC 2433a note.>> of Programs Restructured After Experiencing Critical Cost Growth.-- The <<NOTE:
Assessment.>> official designated to perform oversight of performance assessment pursuant to section 103 of this Act, shall assess the performance of each major defense acquisition [[Page 123 STAT.
1726]] program that has exceeded critical cost growth thresholds established pursuant to section 2433(e) of title 10, United States Code, but has not been terminated in accordance with section 2433a of such title (as added by section 206(a) of this Act) not less often than semi-annually until one year after the date on which such program receives a new milestone approval, in accordance with section 2433a(c)(3) of such title (as so added).
The results of reviews performed under this subsection shall be reported to the Under Secretary of Defense for Acquisition, Technology, and Logistics and summarized in the next annual report of such designated official.
203.
206.
REQUIREMENT FOR CERTIFICATION OF MAJOR SYSTEMS PRIOR TO MILESTONE B.
(a) Certification.--Except as provided in subsection (b), beginning not later than 270 days after the date of the enactment of this Act, for each major defense acquisition program that has not received Milestone B approval, or Key Decision Point B approval in the case of a space program, the Milestone Decision Authority shall certify, after consultation with the Joint Requirements Oversight Council on matters relating to program requirements and military needs-- (1) that the program fulfills an approved initial capabilities document;
(2) that the program is being executed by an entity with a relevant core competency as identified by the Secretary of Defense under section 118b of title 10, United States Code;
(3) if the program duplicates a capability already provided by an existing program, the duplication provided by such program is necessary and appropriate;
(4) that a cost estimate for such program has been submitted to the Milestone Decision Authority and that the concurrence of the official designated to perform oversight of cost estimation pursuant to section 145 of title 10, United States Code, has been obtained regarding the choice of a cost estimate;
and (5) that a schedule identifying the time and major activities required to reach Milestone B approval, or Key Decision Point B approval in the case of a space program, has been submitted to the Milestone Decision Authority.
(b) Exception.--Subsection (a) shall not apply to a major defense acquisition program that has received a certification as required by section 2366a, title 10, United States Code.
(c) Reports.-- (1) Relating to cost growth or schedule delay of programs certified under subsection (a).--With respect to a major defense acquisition program certified by the Milestone Decision Authority under subsection (a), the Milestone Decision Authority shall submit to the congressional defense committees a report in accordance with this subsection if, prior to Milestone B approval-- (A) the projected cost of the program exceeds the cost estimate for the program submitted to the Milestone Decision Authority in accordance with subsection (a)(4) by more than 25 percent;
or (B) the schedule submitted to the Milestone Decision Authority in accordance with subsection (a)(5) is delayed by more than 25 percent.
(2) Relating to cost growth of programs certified under section 2366a.--With respect to a major defense acquisition program certified by the Milestone Decision Authority under section 2366a of title 10, United States Code, the Milestone Decision Authority shall submit to the congressional defense committees a report in accordance with this subsection if the program manager submits a notification to the Milestone Decision Authority pursuant to section 2366a(b).
(3) Matters covered.--Any report submitted pursuant to paragraph (1) or (2) shall-- (A) identify the root causes of the cost or schedule growth;
(B) identify appropriate acquisition performance measures for the remainder of the program;
and (C) include one of the following:
(i) A written certification (with a supporting explanation) stating that-- (I) such program is essential to national security;
(II) there are no alternatives to such program that will provide acceptable military capability at less cost;
(III) new estimates of the cost or schedule, as appropriate, are reasonable;
and (IV) the management structure for the program is adequate to manage and control program cost and schedule.
(ii) A plan for terminating the development of the program or withdrawal of Milestone A approval (or Key Decision Point A approval in the case of a space program) if the Milestone Decision Authority determines that such action is in the interest of national defense.
(4) Time of submission.--A report required by this subsection shall be submitted-- (A) in the case of a report required by paragraph (1), not later than 30 days after the Milestone Decision Authority determines the cost growth or schedule delay described in that paragraph;
and (B) in the case of a report required by paragraph (2), not later than 30 days after the Milestone Decision Authority receives the notification from the program manager described in that paragraph.
(d) Definitions.--In this section:
(1) Major defense acquisition program.--The term ``major defense acquisition program'' means the following:
(A) A major defense acquisition program as that term is defined in section 2430 of title 10, United States Code.
(B) An acquisition program of the Department of Defense that the Secretary of Defense expects to become a major defense acquisition program (as defined in such section 2430) upon Milestone B approval, on the basis of the cost estimate submitted in accordance with subsection (a)(4) of this section or subsection (a)(4) of section 2366a of title 10, United States Code.
(2) Initial capabilities document.--The term ``initial capabilities document'' has the meaning provided by section 2366a (c)(2) of such title.
(3) Entity.--The term ``entity'' has the meaning provided by section 2366a(c)(4) of such title.
(4) Milestone b approval.--The term ``Milestone B approval'' has the meaning provided by section 2366(e)(7) of such title.
SEC.
204.
(a) Authorized Actions in Event of Critical Cost Growth.--Paragraph (2) of section 2433(e) of title 10, United States Code, is amended to read as follows:
(a) Actions Following Critical Cost Growth.-- (1) In general.--Chapter 144 of title 10, United States Code, is amended by inserting after section 2433 the following new section:
``(2)(A) If the program acquisition unit cost or procurement unit cost of a major defense acquisition program or designated major subprogram (as determined by the Secretary under subsection (d)) increases by a percentage equal to or greater than the critical cost growth threshold for the program or subprogram, the Secretary of Defense, after consultation with the Joint Requirements Oversight Council regarding program requirements, shall-- ``(i) determine the root cause or causes of the critical cost growth including the role, if any, of-- ``(I) changes or growth in requirements;
``Sec.
``(II) unrealistic baseline estimates;
2433a.
``(III) any design, engineering, manufacturing, or technology integration issues;
Critical cost growth in major defense acquisition programs ``(a) Reassessment <<NOTE:
``(IV) changes in procurement quantities;
Consultations.>> of Program.--If the program acquisition unit cost or procurement unit cost of a major defense acquisition program or designated subprogram (as determined by the Secretary under section 2433(d) of this title) increases by a percentage equal to or greater than the critical cost growth threshold for the program or subprogram, the Secretary of Defense, after consultation with the Joint Requirements Oversight Council regarding program requirements, shall-- ``(1) <<NOTE:
``(V) inadequate program funding or funding instability;
Determination.>> determine the root cause or causes of the critical cost growth in accordance with applicable statutory requirements and Department of Defense policies, procedures, and guidance;
``(VI) poor performance by government or contractor personnel responsible for program management;
and ``(2) in consultation with the Director of Cost Assessment and Program Evaluation, carry out an assessment of-- ``(A) the projected cost of completing the program if current requirements are not modified;
or ``(VII) other causes as identified by the Secretary;
``(B) the projected cost of completing the program based on reasonable modification of such requirements;
``(ii) subject to subparagraph (B), determine whether to terminate such program or to restructure such program after assessing-- ``(I) the root causes of cost growth identified pursuant to subparagraph (A);
``(C) the rough order of magnitude of the costs of any reasonable alternative system or capability;
``(II) the validity and urgency of the joint military requirement;
and ``(D) the need to reduce funding for other programs due to the growth in cost of the program.
``(III) the viability of the acquisition strategy;
``(b) Presumption <<NOTE:
``(IV) the quality of program management;
Deadline.
``(V) a broad range of potential material and non- material alternatives to such program;
Certification.>> of Termination.--(1) After conducting the reassessment required by subsection (a) with respect to a major defense acquisition program, the Secretary shall terminate the program unless the Secretary submits to Congress, before the end of the 60-day period beginning on the day the Selected Acquisition Report containing the information described in section 2433(g) of this title is required to be submitted under section 2432(f) of this title, a written certification in accordance with paragraph (2).
and ``(VI) the need to reduce funding for other programs due to the cost growth on such program;
``(2) A certification described by this paragraph with respect to a major defense acquisition program is a written certification that-- ``(A) the continuation of the program is essential to the national security;
``(iii) submit the determination made under clause (ii) to Congress, before the end of the 60-day period beginning on the day the Selected Acquisition Report containing the information described in subsection (g) is required to be submitted under section 2432(f) of this title;
[[Page 123 STAT.
and ``(iv) if a report under paragraph (1) has been previously submitted to Congress with respect to such program or subprogram for the current fiscal year but was based upon a different unit cost report from the program manager to the service acquisition executive designated by the Secretary concerned, submit a further report containing the information described in subsection (g), determined from the time of the previous report to the time of the current report.
1727]] ``(B) there are no alternatives to the program which will provide acceptable capability to meet the joint military requirement (as defined in section 181(g)((1) of this title) at less cost;
``(B) A program may be restructured pursuant to a determination under subparagraph (A)(ii) only if-- ``(i) a written certification (with a supporting explanation) is submitted along with the determination stating that-- ``(I) such program is essential to national security;
``(C) the new estimates of the program acquisition unit cost or procurement unit cost have been determined by the Director of Cost Assessment and Program Evaluation to be reasonable;
``(II) there are no alternatives to such program which will provide acceptable military capability at less cost;
``(D) the program is a higher priority than programs whose funding must be reduced to accommodate the growth in cost of the program;
``(III) new estimates of the program acquisition unit cost or procurement unit cost are reasonable;
and ``(E) the management structure for the program is adequate to manage and control program acquisition unit cost or procurement unit cost.
``(IV) the program is a higher priority than programs whose funding must be reduced to accommodate cost growth on such program;
``(3) <<NOTE:
and ``(V) the management structure for the program is adequate to manage and control program acquisition unit cost or procurement unit cost;
Reports.>> A written certification under paragraph (2) shall be accompanied by a report presenting the root cause analysis and assessment carried out pursuant to subsection (a) and the basis for each determination made in accordance with subparagraphs (A) through (E) of paragraph (2), together with supporting documentation.
and ``(ii) the most recent milestone decision is revisited and results in the approval of such restructured program.''.
``(c) Actions if Program Not Terminated.--(1) If the Secretary elects not to terminate a major defense acquisition program pursuant to subsection (b), the Secretary shall-- ``(A) restructure the program in a manner that addresses the root cause or causes of the critical cost growth, as identified pursuant to subsection (a), and ensures that the program has an appropriate management structure as set forth in the certification submitted pursuant to subsection (b)(2)(E);
(b) Total Expenditure for Procurement Resulting in Treatment as Major Defense Acquisition Program.--Section 2430(a)(2) of such title is amended by inserting ``, including all planned increments or spirals,'' after ``an eventual total expenditure for procurement''.
``(B) rescind the most recent Milestone approval, or Key Decision Point approval in the case of a space program, for the program and withdraw any associated certification under section 2366a or 2366b of this title;
(c) Requirement To Include Cost Growth Funding Changes in Report.-- When a program is restructured under paragraph (2) of section 2433(e) of title 10, United States Code, the next Selected Acquisition Report for such program submitted pursuant to section 2432 of such title occurring after the submission of the budget for the fiscal year following the fiscal year in which the program was restructured shall contain a description of all funding changes included in the budget for that fiscal year as a result of the cost growth on such program, including reductions made in the budgets of other programs to accommodate such cost growth.
``(C) require a new Milestone approval, or Key Decision Point approval in the case of a space program, for the program before taking any contract action to enter a new contract, exercise an option under an existing contract, or otherwise extend the scope of an existing contract under the program, except to the extent determined necessary by the Milestone Decision Authority, on a non-delegable basis, to ensure that the program can be restructured as intended by the Secretary without unnecessarily wasting resources;
(d) Conforming Amendments.--Section 2433(e)(3) of such title is amended-- (1) in subparagraph (A), by striking ``or (2)(B)'' and inserting ``or (2)(A)(iii)'';
``(D) include in the report specified in paragraph (2) a description of all funding changes made as a result of the growth in cost of the program, including reductions made in funding for other programs to accommodate such cost growth;
and (2) in subparagraph (B)-- (A) by striking ``or (2)(B)'' and inserting ``or (2)(A)(iii)'';
and ``(E) conduct regular reviews of the program in accordance with the requirements of section 205 of the Weapon Systems Acquisition Reform Act of 2009.
and (B) by striking ``paragraph (2)(A)'' and inserting ``paragraph (2)(B)''.
``(2) <<NOTE:
Reports.>> For purposes of paragraph (1)(D), the report specified in this paragraph is the first Selected Acquisition Report for the program submitted pursuant to section 2432 of this title after the President submits a budget pursuant to section 1105 of title 31, in the calendar year following the year in which the program was restructured.
[[Page 123 STAT.
1728]] ``(d) Actions <<NOTE:
Reports.>> if Program Terminated.--If a major defense acquisition program is terminated pursuant to subsection (b), the Secretary shall submit to Congress a written report setting forth-- ``(1) an explanation of the reasons for terminating the program;
``(2) the alternatives considered to address any problems in the program;
and ``(3) the course the Department plans to pursue to meet any continuing joint military requirements otherwise intended to be met by the program.''.
(2) Clerical amendment.--The table of sections at the beginning of chapter 144 of such title is amended by inserting after the item relating to section 2433 the following new item:
``2433a.
Critical cost growth in major defense acquisition programs.''.
(3) Conforming amendment.--Paragraph (2) of section 2433(e) of such title 10 is amended to read as follows:
``(2) If the program acquisition unit cost or procurement unit cost of a major defense acquisition program or designated major subprogram (as determined by the Secretary under subsection (d)) increases by a percentage equal to or greater than the critical cost growth threshold for the program or subprogram, the Secretary of Defense shall take actions consistent with the requirements of section 2433a of this title.''.
(b) Treatment as MDAP.--Section 2430 of such title is amended-- (1) in subsection (a)(2), by inserting ``, including all planned increments or spirals,'' after ``an eventual total expenditure for procurement'';
and (2) by adding at the end the following new subsection:
``(c) For purposes of subsection (a)(2), the Secretary shall consider, as applicable, the following:
``(1) The estimated level of resources required to fulfill the relevant joint military requirement, as determined by the Joint Requirements Oversight Council pursuant to section 181 of this title.
``(2) The cost estimate referred to in section 2366a(a)(4) of this title.
``(3) The cost estimate referred to in section 2366b(a)(1)(C) of this title.
``(4) The cost estimate within a baseline description as required by section 2435 of this title.''.
205.
207.
ORGANIZATIONAL CONFLICTS OF INTEREST IN THE ACQUISITION OF MAJOR WEAPON SYSTEMS.
ORGANIZATIONAL CONFLICTS OF INTEREST IN MAJOR DEFENSE ACQUISITION PROGRAMS.
(a) Requirement for Panel To Present Recommendations.--Not later than one year after the date of the enactment of this Act, the Panel on Contracting Integrity established pursuant to section 813 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364;
(a) Revised <<NOTE:
Deadline.
10 USC 2430 note.>> Regulations Required.--Not later than 270 days after the date of the enactment of this Act, the Secretary of Defense shall revise the Defense Supplement to the Federal Acquisition Regulation to provide uniform guidance and tighten existing requirements for organizational conflicts of interest by contractors in major defense acquisition programs.
(b) Elements.--The revised regulations required by subsection (a) shall, at a minimum-- (1) address organizational conflicts of interest that could arise as a result of-- (A) lead system integrator contracts on major defense acquisition programs and contracts that follow lead system [[Page 123 STAT.
1729]] integrator contracts on such programs, particularly contracts for production;
(B) the ownership of business units performing systems engineering and technical assistance functions, professional services, or management support services in relation to major defense acquisition programs by contractors who simultaneously own business units competing to perform as either the prime contractor or the supplier of a major subsystem or component for such programs;
(C) the award of major subsystem contracts by a prime contractor for a major defense acquisition program to business units or other affiliates of the same parent corporate entity, and particularly the award of subcontracts for software integration or the development of a proprietary software system architecture;
or (D) the performance by, or assistance of, contractors in technical evaluations on major defense acquisition programs;
(2) ensure that the Department of Defense receives advice on systems architecture and systems engineering matters with respect to major defense acquisition programs from federally funded research and development centers or other sources independent of the prime contractor;
(3) require that a contract for the performance of systems engineering and technical assistance functions for a major defense acquisition program contains a provision prohibiting the contractor or any affiliate of the contractor from participating as a prime contractor or a major subcontractor in the development or construction of a weapon system under the program;
and (4) establish such limited exceptions to the requirement in paragraphs (2) and (3) as may be necessary to ensure that the Department of Defense has continued access to advice on systems architecture and systems engineering matters from highly- qualified contractors with domain experience and expertise, while ensuring that such advice comes from sources that are objective and unbiased.
(c) Consultation in Revision of Regulations.-- (1) Recommendations of panel on contracting integrity.--Not later <<NOTE:
Deadline.>> than 90 days after the date of the enactment of this Act, the Panel on Contracting Integrity established pursuant to section 813 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109- 364;
2320) shall present recommendations to the Secretary of Defense on measures to eliminate or mitigate organizational conflicts of interest in the acquisition of major weapons systems.
2320) shall present recommendations to the Secretary of Defense on measures to eliminate or mitigate organizational conflicts of interest in major defense acquisition programs.
(b) Revised Regulations Required.--Not later than 180 days after receiving recommendations pursuant to subsection (a), the Secretary of Defense shall revise the Defense Supplement to the Federal Acquisition Regulation to address organizational conflicts of interest by contractors in the acquisition of major weapon systems.
(2) Consideration of recommendations.--In developing the revised regulations required by subsection (a), the Secretary shall consider the following:
(c) Potential Organizational Conflicts of Interest.--The organizational conflicts of interest considered during the preparation of the recommendations required pursuant to subsection (a) shall include conflicts that could arise as a result of any of the following:
(A) The recommendations presented by the Panel on Contracting Integrity pursuant to paragraph (1).
(1) Lead system integrator contracts on major defense acquisition programs and contracts that follow lead system integrator contracts on such programs, particularly contracts for production.
(B) Any findings and recommendations of the Administrator for Federal Procurement Policy and the Director of the Office of Government Ethics pursuant to section 841(b) of the Duncan Hunter National Defense Authorization Act for Fiscal Year 2009 (Public Law 110- 417;
(2) The ownership of business units performing systems engineering and technical assistance functions, professional services, or management support services in relation to major defense acquisition programs by contractors who simultaneously own business units competing to perform as either the prime contractor or the supplier of a major subsystem or component for such programs.
122 Stat.
(3) The award of major subsystem contracts by a prime contractor for a major defense acquisition program to business units or other affiliates of the same parent corporate entity, and particularly the award of subcontracts for software integration or the development of a proprietary software system architecture.
4539).
(4) The performance by, or assistance of, contractors in technical evaluations on major defense acquisition programs.
[[Page 123 STAT.
(d) Extension of Panel on Contracting Integrity.--Subsection (e) of section 813 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364;
1730]] (d) Extension <<NOTE:
120 Stat.
10 USC 2304 note.>> of Panel on Contracting Integrity.--Subsection (e) of section 813 of the John Warner National Defense Authorization Act for Fiscal Year 2007 is amended to read as follows:
2321) is amended to read as follows:
``(e) Termination.-- ``(1) In <<NOTE:
``(e) Termination.--(1) Subject to the restriction in paragraph (2), the panel shall continue to serve until the date that is 18 months after the date on which the Secretary of Defense notifies the congressional defense committees of an intention to terminate the panel based on a determination that the activities of the panel no longer justify its continuation and that concerns about contracting integrity have been fully mitigated.
Notification.>> general.--Subject to paragraph (2), the panel shall continue to serve until the date that is 18 months after the date on which the Secretary of Defense notifies the congressional defense committees of an intention to terminate the panel based on a determination that the activities of the panel no longer justify its continuation and that concerns about contracting integrity have been mitigated.
``(2) The panel shall continue to serve at least until December 31, 2011.''.
``(2) Minimum continuing service.--The panel shall continue to serve at least until December 31, 2011.''.
SEC.
TITLE III--ADDITIONAL ACQUISITION PROVISIONS SEC.
206.
301.
AWARDS FOR DEPARTMENT OF DEFENSE PERSONNEL FOR EXCELLENCE IN THE ACQUISITION OF PRODUCTS AND SERVICES.
<<NOTE:
(a) In General.--Not later than 180 days after the date of the enactment of this Act, the Secretary of Defense shall commence carrying out a program to recognize excellent performance by individuals and teams of members of the Armed Forces and civilian personnel of the Department of Defense in the acquisition of products and services for the Department of Defense.
10 USC 2302 note.>> AWARDS FOR DEPARTMENT OF DEFENSE PERSONNEL FOR EXCELLENCE IN THE ACQUISITION OF PRODUCTS AND SERVICES.
(b) Elements.--The program required by subsection (a) shall include the following:
(a) In <<NOTE:
View plain text versions (6)

Sections of law this bill changes

9 sections in 6 laws

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Pay rates and systems · 5 U.S.C. ch. 53 1 section
  • § 5315 Positions at level IV Amends

    5 U.S.C. § 5315

    The law today

    Level IV of the Executive Schedule applies to the following positions, for which the annual rate of basic pay shall be the rate determined with respect to such level under chapter 11 of title 2, as adjusted by section 5318 of this title: Deputy Administrator of General Services. Associate Administrator of the National Aeronautics and Space Administration. Assistant Administrators, Agency for International Development (6). Regional Assistant Administrators, Agency for International Development (4). Assistant Secretaries of Agriculture (3). Assistant Secretaries of Commerce (11). Assistant Secretaries of Defense (20). Assistant Secretaries of the Air Force (5). Assistant Secretaries of the Army (5). Assistant Secretaries of the Navy (4). Assistant Secretaries of Health and Human Services (6). Assistant Secretaries of the Interior (6). Assistant Attorneys General (11). Assistant Secretaries of Labor (10), one of whom shall be the Assistant Secretary of Labor for Veterans’ Employment and Training. Administrator, Wage and Hour Division, Department of Labor. Assistant Secretaries of State (24) and 4 other State Department officials to be appointed by the President, by and with the advice and consent of the Senate. Assistant Secretaries of the Treasury (10). Members, United States International Trade Commission (5). Assistant Secretaries of Education (10). General Counsel, Department of Education. Director of Civil Defense, Department of the Army. Deputy Director of the Office of Emergency Planning. Deputy Director of the Office of Science and Technology. Deputy Director of the Peace Corps. Assistant Directors of the Office of Management and Budget (3). General Counsel of the Department of Agriculture. General Counsel of the Department of Commerce. General Counsel of the Department of Defense. General Counsel of the Department of Health and Human Services. Solicitor of the Department of the Interior. Solicitor of the Department of Labor. General Counsel of the National Labor Relations Board. General Counsel of the Department of the Treasury. First Vice President of the Export-Import Bank of Washington. Members, Council of Economic Advisers. Members, Board of Directors of the Export-Import Bank of Washington. Members, Federal Communications Commission. Member, Board of Directors of the Federal Deposit Insurance Corporation. Directors, Federal Housing Finance Board. Members, Federal Energy Regulatory Commission. Members, Federal Trade Commission. Members, Surface Transportation Board. Members, National Labor Relations Board. Members, Securities and Exchange Commission. Members, Merit Systems Protection Board. Members, Federal Maritime Commission. Members, National Mediation Board. Members, Railroad Retirement Board. Director of Selective Service. Associate Director of the Federal Bureau of Investigation, Department of Justice. Members, Equal Employment Opportunity Commission (4). Director, Community Relations Service. Members, National Transportation Safety Board. General Counsel, Department of Transportation. Deputy Administrator, Federal Aviation Administration. Assistant Secretaries of Transportation (5). Deputy Federal Highway Administrator. Administrator of the Great Lakes St. Lawrence Seaway Development Corporation. Assistant Secretary for Science, Smithsonian Institution. Assistant Secretary for History and Art, Smithsonian Institution. Deputy Administrator of the Small Business Administration. Assistant Secretaries of Housing and Urban Development (8). General Counsel of the Department of Housing and Urban Development. Commissioner of Interama. Federal Insurance Administrator, Federal Emergency Management Agency. Members, National Credit Union Administration Board (2). Members, Postal Regulatory Commission (4). Members, Occupational Safety and Health Review Commission. Deputy Under Secretaries of the Treasury (or Assistant Secretaries of the Treasury) (2). Members, Consumer Product Safety Commission (4). Members, Commodity F...

    168 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Office of the secretary of defense · 10 U.S.C. ch. 4 1 section
  • § 139a Director of Cost Assessment and Program Evaluation Amends

    10 U.S.C. § 139a

    The law today

    (a) Appointment.— There is a Director of Cost Assessment and Program Evaluation in the Department of Defense, appointed by the President, by and with the advice and consent of the Senate. (b) Independent Advice to Secretary of Defense.— (1) The Director of Cost Assessment and Program Evaluation is the principal advisor to the Secretary of Defense and other senior officials of the Department of Defense, and shall provide independent analysis and advice to such officials, on the following matters: (A) Matters assigned to the Director pursuant to this section and section 3221 of this title. (B) Matters assigned to the Director by the Secretary pursuant to section 113 of this title. (2) The Director may communicate views on matters within the responsibility of the Director directly to the Secretary of Defense and the Deputy Secretary of Defense without obtaining the approval or concurrence of any other official within the Department of Defense. (c) Deputy Directors.— There are two Deputy Directors within the Office of the Director of Cost Assessment and Program Evaluation, as follows: (1) The Deputy Director for Cost Assessment. (2) The Deputy Director for Program Evaluation. (d) Responsibilities.— The Director of Cost Assessment and Program Evaluation shall carry out the requirements of this section in accordance with the objectives established pursuant to section 3102 of this title and shall serve as the principal official within the senior management of the Department of Defense for the following: (1) Cost estimation and cost analysis for acquisition programs of the Department of Defense, and carrying out the duties assigned pursuant to section section 3221 of this title. (2) Analysis and advice on matters relating to the planning and programming phases of the Planning, Programming, Budgeting and Execution system, and the preparation of materials and guidance for such system, as directed by the Secretary of Defense, working in coordination with the Under Secretary of Defense (Comptroller). (3) Analysis and advice for resource discussions relating to requirements under consideration in the Joint Requirements Oversight Council pursuant to section 181 of this title. (4) Formulation of study guidance for analyses of alternatives for major defense acquisition programs and performance of such analyses, as directed by the Secretary of Defense. (5) Review, analysis, and evaluation of programs for executing approved strategies and policies and ensuring that information on programs is presented accurately and completely. (6) Assessments of special access and compartmented intelligence programs, in coordination with the Under Secretary of Defense for Acquisition and Sustainment, the Under Secretary of Defense for Research and Engineering, and the Under Secretary of Defense for Intelligence and Security and in accordance with applicable policies. (7) Assessments of alternative plans, programs, and policies with respect to the acquisition programs of the Department of Defense. (8) Leading the development of improved analytical skills and competencies within the cost assessment and program evaluation workforce of the Department of Defense and improved tools, data, and methods to promote performance, economy, and efficiency in analyzing national security planning and the allocation of defense resources, including the standardization of analytical methodologies and the establishment and maintenance of a centralized knowledge repository of physical attributes or other data for modeling and simulation purposes. (9) Performing the duties assigned to the Director in section 2222 of this title. (e) Program Evaluation Competitive Analysis Cell.— (1) Not later than June 1, 2024, the Secretary of Defense shall establish a team, to be known as the “Program Evaluation Competitive Analysis Cell” (referred to in this subsection as the “Cell”), to critically assess the analytical methodologies, assumptions, and data used in key strategic and operational...

    11 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Boards, councils, and committees · 10 U.S.C. ch. 7 1 section
  • § 181 Joint Requirements Oversight Council Amends

    10 U.S.C. § 181 — at 181(d) and 181(b)

    The law today

    (a) In General.— There is a Joint Requirements Oversight Council in the Department of Defense. (b) Mission.— In addition to other matters assigned to it by the President or Secretary of Defense, the Joint Requirements Oversight Council shall assist the Chairman of the Joint Chiefs of Staff in— (1) evaluating global trends, emerging threats, and adversary capabilities to inform understanding of joint operational problems and to shape joint force design; (2) coordinating with commanders of combatant commands to compile, refine, and prioritize joint operational problems; (3) continuously reviewing and assessing joint military capabilities of elements of the Department of Defense listed in section 111(b) of this title in a manner that meets applicable requirements in the national defense strategy under section 113(g) of this title; (4) identifying and prioritizing gaps and opportunities in joint military capabilities, including making recommendations for changes to address such capability and capacity gaps; (5) identifying advances in technology, innovative commercial solutions, and concepts of operation that could improve the military advantage of the joint force; (6) recommending joint capability requirements that— (A) describe the joint operational problem to provide necessary context for the joint capability requirement; (B) proposes nonprescriptive solutions to joint operational problems; and (C) ensures system interoperability, where appropriate, between and among joint military capabilities; (7) designing the joint force in a manner that— (A) addresses joint operational problems; and (B) evaluates force design initiatives of the Armed Forces to recommend acceptance, mitigation, or alternative force designs for the joint force; (8) maintaining a repository of joint operational problems and identification of capabilities to address those problems; and (9) evaluating effect of joint military capability requirements for the purposes of section 4376(a) of this title. (c) Composition.— (1) In general.— The Joint Requirements Oversight Council is composed of the following: (A) The Vice Chairman of the Joint Chiefs of Staff, who is the Chair of the Council and is the principal adviser to the Chairman of the Joint Chiefs of Staff for making recommendations about joint military capabilities. (B) An Army officer in the grade of general. (C) A Navy officer in the grade of admiral. (D) An Air Force officer in the grade of general. (E) A Marine Corps officer in the grade of general. (F) A Space Force officer in the grade of general. (2) Selection of members.— Members of the Council under subparagraphs (B), (C), (D), and (E) of paragraph (1) shall be selected by the Chairman of the Joint Chiefs of Staff, after consultation with the Secretary of Defense, from officers in the grade of general or admiral, as the case may be, who are recommended for selection by the Secretary of the military department concerned. (3) Recommendations.— In making any recommendation to the Chairman of the Joint Chiefs of Staff as described in paragraph (1)(A), the Vice Chairman of the Joint Chiefs of Staff shall provide the Chairman any dissenting view of members of the Council under paragraph (1) with respect to such recommendation. (d) Advisors.— (1) In general.— The following officials of the Department of Defense shall serve as advisors to the Joint Requirements Oversight Council on matters within their authority and expertise: (A) The Under Secretary of Defense for Policy. (B) The Under Secretary of Defense for Intelligence and Security. (C) The Under Secretary of Defense for Acquisition and Sustainment. (D) The Under Secretary of Defense for Research and Engineering who shall serve as the Chief Technical Advisor to the Council and— (i) shall provide assistance in evaluating the technical feasibility of requirements under development; and (ii) shall identify options for expanding or generating new requirements based on opportunities provided by new or em...

    29 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Repealed] · 10 U.S.C. ch. 139 2 sections
Repealed] · 10 U.S.C. ch. 144 2 sections
Repealed] · 10 U.S.C. ch. 148 2 sections

Also cites: 10 U.S.C. § 101, 10 U.S.C. § 139c, 10 U.S.C. § 2379, 10 U.S.C. § 2433, 10 U.S.C. § 2433a, 10 U.S.C. § 2435

Action History

  1. Became Public Law No: 111-23.

  2. Signed by President.

  3. Presented to President.

  4. Cleared for White House.

  5. Motions to reconsider laid on the table Agreed to without objection.

  6. On agreeing to the conference report Agreed to by the Yeas and Nays: 411 - 0 (Roll no. 286). (consideration: CR H5912)

  7. The previous question was ordered pursuant to the rule. (consideration: CR H5912)

  8. DEBATE - The House proceeded with 1 hour of debate on the conference report to accompany S. 454.

  9. Mr. Skelton brought up conference report H. Rept. 111-124 for consideration under the provisions of H. Res. 463. (consideration: CR H5907-5912)

  10. Message on Senate action sent to the House.

  11. Senate agreed to conference report by Yea-Nay Vote. 95 - 0. Record Vote Number: 197.

  12. Conference report considered in Senate. (consideration: CR S5683-5685)

  13. Conference papers: Senate report and manager's statement and official papers held at the desk in Senate.

  14. Conference report H. Rept. 111-124 filed. (text of conference report: CR H5795-5805)

  15. Conferees agreed to file conference report.

  16. Message on Senate action sent to the House.

  17. Senate disagreed to House amendment, agreed to request for conference, and appointed conferees. Levin; Kennedy; Byrd; Lieberman; Reed; Akaka; Nelson FL; Nelson NE; Bayh; Webb; McCaskill; Udall CO; Hagan; Begich; Burris; McCain; Inhofe; Sessions; Chambliss; Graham; Thune; Martinez; Wicker; Burr; Vitter; Collins. (consideration: CR S5495-5496)

  18. Message on House action received in Senate and at desk: House amendment to Senate bill and House requests a conference.

  19. Motion to reconsider laid on the table Agreed to without objection.

  20. On motion to authorize conferees to close meetings Agreed to by the Yeas and Nays: 409 - 11 (Roll no. 254).

  21. Mr. Skelton moved that the House authorize conferees to close meetings. (consideration: CR H5550)

  22. The Speaker appointed conferees: Skelton, Spratt, Ortiz, Taylor, Abercrombie, Reyes, Snyder, Smith (WA), Sanchez, Loretta, McIntyre, Tauscher, Brady (PA), Andrews, Davis (CA), Langevin, Cooper, Ellsworth, Sestak, McHugh, Bartlett, McKeon, Thornberry, Jones, Akin, Forbes, Miller (FL), Wilson (SC), Conaway, Hunter, and Coffman (CO).

  23. On motion that the House insist upon its amendment, and request a conference Agreed to without objection.

  24. Pursuant to H. Res. 432, the House insisted on its amendment and requested a conference. (consideration: CR H5549-5550)

  25. On passage Passed pursuant to H. Res. 432.

  26. The House struck all after the enacting clause and inserted in lieu thereof the provisions of a similar measure H.R. 2101 pursuant to H. Res. 432.

  27. Considered pursuant to H.Res. 432. (consideration: CR H5539-5549, H5549-5550; text of measure as received in House: CR H5539-5549)

  28. Consideration initiated pursuant to H.Res. 432.

  29. Held at the desk.

  30. Message on Senate action sent to the House.

  31. Received in the House.

  32. Passed Senate with an amendment by Yea-Nay Vote. 93 - 0. Record Vote Number: 186. (text: CR S5260-5266)

  33. The committee substitute as amended agreed to by Unanimous Consent.

  34. S.AMDT.1057 Amendment SA 1057 agreed to in Senate by Voice Vote.

  35. S.AMDT.1057 Amendment SA 1057 proposed by Senator McCain for Senator Coburn. (consideration: CR S5256; text: CR S5256)To require a plan for the elimination of weaknesses in operations that hinder the capacity to assemble and assess reliable cost information on assets acquired under major defense acquisition programs.

  36. S.AMDT.1052 Amendment SA 1052 as modified agreed to in Senate by Voice Vote. (text as modified: CR S5256)

  37. S.AMDT.1052 Amendment SA 1052 proposed by Senator Levin for Senator Murray. (consideration: CR S5256)To expand the national security objectives of the national technology and industrial base and clarify the role of major defense acquisition programs toward such objectives.

  38. Considered by Senate. (consideration: CR S5256-5267)

  39. S.AMDT.1055 Amendment SA 1055 agreed to in Senate by Unanimous Consent.

  40. S.AMDT.1055 Amendment SA 1055 proposed by Senator Levin for Senator Bingaman. (consideration: CR S5224-5225)To clarify the submittal of certifications of the adequacy of budgets by the Director of the Department of Defense Test Resource Management Center.

  41. S.AMDT.1048 Amendment SA 1048 agreed to in Senate by Unanimous Consent.

  42. S.AMDT.1047 Amendment SA 1047 agreed to in Senate by Unanimous Consent.

  43. S.AMDT.1050 Amendment SA 1050 agreed to in Senate by Unanimous Consent.

  44. S.AMDT.1049 Amendment SA 1049 agreed to in Senate by Unanimous Consent.

  45. S.AMDT.1051 Amendment SA 1051 agreed to in Senate by Unanimous Consent.

  46. S.AMDT.1046 Amendment SA 1046 agreed to in Senate by Unanimous Consent.

  47. S.AMDT.1053 Amendment SA 1053 agreed to in Senate by Unanimous Consent.

  48. S.AMDT.1044 Amendment SA 1044 agreed to in Senate by Unanimous Consent.

  49. S.AMDT.1048 Amendment SA 1048 proposed by Senator Levin for Senator Carper. (consideration: CR S5219-5224; text: CR S5220)To require consultation between the Director of Defense Research and Engineering and the Director of Developmental Test and Evaluation in assessments of technological maturity of critical technologies of major defense acquisition programs.

  50. S.AMDT.1047 Amendment SA 1047 proposed by Senator Levin for Senator Whitehouse. (consideration: CR S5219-5224; text: CR S5220)To further improve the cost assessment procedures and processes of the Department of Defense.

  51. S.AMDT.1050 Amendment SA 1050 proposed by Senator Levin for Senator McCaskill. (consideration: CR S5219-5224; text: CR S5220)To provide for a review by the Comptroller General of the United States of waivers of the requirement for competitive prototypes based on excessive cost.

  52. S.AMDT.1049 Amendment SA 1049 proposed by Senator Levin for Senator McCaskill. (consideration: CR S5219-5224; text: CR S5220)To specify certain inputs to the Joint Requirements Oversight Council from the commanders of the combatant commands on joint military requirements.

  53. S.AMDT.1051 Amendment SA 1051 proposed by Senator Levin for Senator McCaskill. (consideration: CR S5219-5224; text: CR S5220)To enhance the review of joint military requirements.

  54. S.AMDT.1046 Amendment SA 1046 proposed by Senator Levin for Senator Coburn. (consideration: CR S5219-5224; text: CR S5219-5220)To require reports on the operation and support costs of major defense acquisition programs and major weapons systems.

  55. S.AMDT.1053 Amendment SA 1053 proposed by Senator Levin for Senator Chambliss. (consideration: CR S5219-5224; text: CR S5219)To clarify an exception to conflict of interest requirements applicable to contracts for systems engineering and technical assistance functions.

  56. S.AMDT.1044 Amendment SA 1044 proposed by Senator Levin for Senator Inhofe. (consideration: CR S5219-5224; text: CR S5219)To require a report on certain cost growth matters following the termination of a major defense acquisition program for critical cost growth.

  57. S.AMDT.1045 Amendment SA 1045 agreed to in Senate by Unanimous Consent.

  58. S.AMDT.1045 Amendment SA 1045 proposed by Senator Collins. (consideration: CR S5215-5219; text: CR S5216)To require the Secretary of Defense to apply uniform earned value management standards to reliably and consistently measure contract performance, and to ensure that contractors establish and use approved earned value management systems.

  59. Measure laid before Senate by unanimous consent. (consideration: CR S5205-5225; text of measure as reported in Senate: CR S5205-5209)

  60. Placed on Senate Legislative Calendar under General Orders. Calendar No. 45.

  61. Committee on Armed Services. Reported by Senator Levin with an amendment in the nature of a substitute. Without written report.

  62. Committee on Armed Services. Ordered to be reported with an amendment favorably.

  63. Committee on Armed Services. Hearings held. Hearings printed: S.Hrg. 111-149.

  64. Read twice and referred to the Committee on Armed Services.

  65. Sponsor introductory remarks on measure. (CR S2366-2368)

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 0 co-sponsors · 303 not signed on

Sponsors (0)

None.

Co-sponsors (0)

None.

Not signed on (303)

303 members have not signed on to this bill.

Show all 303 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 454 do?
Weapon Systems Acquisition Reform Act of 2009 - Title I: Acquisition Organization - (Sec. 101) Establishes within the Department of Defense (DOD) a Director of Cost Assessment and Program Evaluation, to act as the principal advisor to the Secretary of Defense and other senior DOD officials and provide independent analysis and advice on matters relating to DOD acquisition program cost estimation and analysis, as well as related defense acquisition matters as assigned by the Secretary. Establishes under such Director a Deputy Director for Cost Assessment and a Deputy Director for Program Evaluation. Requires the: (1) Director to ensure that DOD cost estimation and cost analysis processes provide accurate information and realistic cost estimates for DOD acquisition programs; and (2) Secretary to ensure that the Director reviews acquisition program cost estimates, cost analyses, and related records for major defense acquisition programs (MDAPs) and major automated information system programs (MAISPs) of the military departments and defense agencies. Authorizes the Director to participate in and approve MDAP and MAISP cost estimates. Requires the: (1) Director, the Secretary of the military department concerned, and the head of the defense agency concerned to disclose the confidence level used in establishing a baseline estimate for an MDAP or MAISP; and (2) Director to report annually to the Secretary, the Under Secretary of Defense for Acquisition, Technology, and Logistics (Under Secretary), the Under Secretary of Defense (Comptroller), and the congressional defense and appropriations committees on DOD cost estimation and analysis activities. Transfers to the Office of the Director the functions and personnel of the Cost Analysis Improvement Group and the Office of Program Analysis and Evaluation. Requires: (1) the Director to review, and report to the Secretary on, existing DOD systems and methods for tracking and assessing MDAP operating and support costs; and (2) such report to be transmitted to the defense and appropriations committees. (Sec. 102) Establishes: (1) a Director of Developmental Test and Evaluation to advise the Secretary and the Under Secretary on DOD developmental test and evaluation; and (2) a Director of Systems Engineering to advise the Secretary and Under Secretary on DOD systems engineering and development planning. Outlines related duties. Requires such directors to jointly: (1) report to the defense and appropriations committees on activities undertaken; and (2) issue appropriate guidance with respect to DOD developmental test and evaluation and systems engineering, respectively. Directs the service acquisition executives of each military department and defense agency with responsibility for a MDAP to: (1) develop and implement plans to ensure that the department or agency has provided appropriate resources for developmental testing and developmental planning and systems engineering; and (2) report to the directors established under this section with respect to such plans and each such director's responsibilities. (Sec. 103) Directs the Secretary to designate a senior DOD official to conduct and oversee performance assessments and root cause analyses for MDAPs. Outlines related duties. Requires such official to report annually to the defense and appropriations committees on activities undertaken. (Sec. 104) Requires the Director of Defense Research and Engineering to: (1) periodically review and assess the technological maturity and integration risk of critical technologies of MDAPs, and submit findings to the Under Secretary; (2) report annually to the Secretary and the defense and appropriations committees on the maturity and risk of such technologies; (3) report to such committees on additional resources required to implement the results of the review and assessment; and (4) develop knowledge-based standards to measure the maturity and risk of critical technologies at key stages in the acquisition process. (Sec. 105) Directs the Joint Requirements Oversight Council (JROC) to seek and consider input from commanders of combatant commands prior to identifying joint military requirements. Requires the Comptroller General (CG) to report to the defense committees on the implementation of such requirement. Title II: Acquisition Policy - (Sec. 201) Requires: (1) the Secretary to ensure that mechanisms are developed and implemented to ensure the consideration of tradeoffs among cost, schedule, and performance objectives with respect to DOD acquisition programs; (2) the JROC to ensure such consideration with respect to joint military requirements; (3) the Secretary to ensure that each new joint military requirement recommended by the JROC is reviewed to ensure compliance with the tradeoffs consideration requirement and the JROC requirement to seek and consider input from commanders of combatant commands; and (4) the Director of Cost Assessment and Program Evaluation to lead the development of study guidance for an analysis of alternatives for each joint military requirement for which the JROC Chairman is the validation authority. (Sec. 202) Directs the Secretary to ensure that the acquisition strategy for each MDAP includes: (1) measures to ensure competition at both the prime contract and subcontract level of the MDAP throughout its life-cycle as a means to improve contractor performance; and (2) adequate documentation of the rationale for selection of the subcontractor tier or tiers. Outlines measures to ensure such competition. Requires the Secretary: (1) to take specified actions to ensure fair and objective "make-buy" decisions by prime contractors on MDAPs; and (2) whenever a decision regarding the source of repair results in a plan to award a contract for performance of maintenance and sustainment of a major weapon system, to ensure that such contract is awarded on a competitive basis with full consideration of all sources. (Sec. 203) Directs the Secretary to ensure that the acquisition strategy for each MDAP provides for competitive prototypes before Milestone B approval, unless the milestone decision authority (MDA) for that MDAP waives such requirement. Allows the MDA to waive the requirement only on the basis that: (1) the cost of producing competitive prototypes exceeds the expected life-cycle benefits of producing the prototypes; or (2) but for such waiver, DOD would be unable to meet critical national security objectives. Requires: (1) the defense and appropriations committees to be notified within 30 days after such a waiver; (2) the CG to be notified of such a waiver and its rationale; and (3) the CG to review such rationale, and report review results to the defense and appropriations committees. (Sec. 204) Requires a MDA, within 30 days after receiving notification from a program manager that the MDAP is experiencing cost or schedule delays of 25% or more, to report to the defense and appropriations committees identifying: (1) the root causes of the cost or schedule growth; and (2) appropriate acquisition performance measures for the remainder of the MDAP's development. Requires such report to also include either: (1) a certification of the necessity of the MDAP; or (2) a plan for terminating MDAP development or withdrawing Milestone A or Key Decision Point A approval. (Sec. 205) Directs a MDA who waives certain program certification requirements normally necessary before Milestone B or Key Decision Point B approval to, at least annually, review that MDAP to determine the extent to which it currently meets the waived requirements. Requires the current certification status of such MDAPs to be included in annual DOD budget justification documents. Requires a MDA to have received a preliminary design review and conducted a formal post-preliminary design review assessment before the MDAP may receive Milestone B or Key Decision Point B approval. Directs the MDA, for each MDAP that has not received Milestone C or Key Decision Point C approval, to: (1) determine whether or not the program satisfies specified certification components; and (2) annually review its progress in satisfying such components. Requires the current certification status of such MDAPs to be included in annual DOD budget justification documents. Directs the official assigned oversight of performance assessment, with respect to MDAPs that are restructured after experiencing critical cost growth and certified as necessary to continue, to annually review and assess the MDAP's success in achieving adequate program performance. (Sec. 206) Directs the Secretary, if the acquisition or procurement unit cost of an MDAP or designated major subprogram increases by a percentage equal to or greater than the critical cost growth threshold for the program or subprogram, to: (1) determine the root causes for the cost growth; and (2) terminate the program, unless the Secretary notifies Congress of the decision not to terminate. Allows such a program or subprogram to be continued only under limited conditions, including a certification that the program is essential to national security and there are no alternatives which will provide acceptable military capability at less cost. Allows a program to be restructured in a manner that addresses the root causes of the critical cost growth. Provides that when a program is restructured, the next Selected Acquisition Report for the program after the restructuring shall contain a description of all funding changes made in the budget as a result of the program's cost growth. Requires the Secretary to report to Congress on terminated programs. (Sec. 207) Directs the Secretary to revise the Defense Supplement to the Federal Acquisition Regulation to provide guidance and tighten existing requirements concerning organizational conflicts of interest by contractors in MDAPs. Requires the Panel on Contracting Integrity (established under the John Warner National Defense Authorization Act for Fiscal Year 2007) to present recommendations to the Secretary on measures to eliminate or mitigate organizational conflicts of interest in MDAPs. Directs the Panel to continue to serve until at least the end of 2011. Title III: Additional Acquisition Provisions - (Sec. 301) Requires the Secretary to carry out a program to recognize excellent performance by individuals and teams of members of the Armed Forces and civilian DOD personnel in the acquisition of products and services. Authorizes cash bonuses as part of the program. (Sec. 302) Amends the Duncan Hunter National Defense Authorization Act for Fiscal Year 2009 to require additional discussions and recommendations within a required report from the Secretary to the defense committees on DOD implementation of earned value management. (Sec. 303) Includes as a national security objective of the national technology and industrial base maintaining critical design skills to ensure that the Armed Forces are provided with systems capable of ensuring technological superiority over potential adversaries. Requires periodic defense capability assessments to consider the effects of the termination of MDAPs. (Sec. 304) Requires the CG to report to the defense and appropriations committees on: (1) growth in operating and support costs for major weapon systems; and (2) the results of a review of weaknesses in operations affecting the reliability of financial information on systems and assets to be acquired under MDAPs.
What is the current status of S 454?
This bill has been enacted into law. Introduced February 23, 2009. Enacted.
Where can I track S 454?
Track S 454 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 454

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 454

Last checked for changes 20 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →