SB 2919 — Relating to power duration requirements in emergency contingency plans adopted by end stage renal disease facilities.

Last action — Placed on intent calendar

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the Senate. Introduced March 14, 2025. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the Senate.

Summary

Relating to power duration requirements in emergency contingency plans adopted by end stage renal disease facilities.

In the bill's own words, from its opening clause.

Bill Text

What changed in the latest version

70 added · 44 removed

Plain-language change summary

The amendments made to SB 2919 include changes to Section 251.017 of the Health and Safety Code, specifically the removal of certain requirements related to emergency contingency plans for end stage renal disease facilities. The amended text alters the language about facility obligations concerning on-site emergency generators and fuel sources. These changes could impact how facilities prepare for power outages and ensure continued operation during emergencies.

→
Previous
Latest
By:AAMiles, Hancock S.B.ANo.A2919 A BILL TO BE ENTITLED AN ACT relating to power duration requirements in emergency contingency plans adopted by end stage renal disease facilities.
1-1 By:AAMiles, Hancock S.B.ANo.A2919 1-2 (In the SenateA-AFiled MarchA14,A2025;
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
AprilA7,A2025, read 1-3 first time and referred to Committee on Health & Human Services;
SECTION A1.AASection 251.017(b), Health and Safety Code, is amended to read as follows:
1-4 MayA12,A2025, reported adversely, with favorable Committee 1-5 Substitute by the following vote:
(b) AAUnless the facility adopts a plan described by Subsection (d) or (e), an end stage renal disease facility must adopt an emergency contingency plan as required by Subsection (a) under which the facility is required:
Yeas 7, Nays 1;
(1)AAto have an on-site emergency generator that:
MayA12,A2025, 1-6 sent to printer.) 1-7 COMMITTEE VOTE 1-8 AAAAAAAAAAAAAAAA Yea Nay AbsentA PNV 1-9 KolkhorstAAAAAAA AXA AAA AAAAAAA AAA 1-10 PerryAAAAAAAAAAA AXA AAA AAAAAAA AAA 1-11 BlancoAAAAAAAAAA AXA AAA AAAAAAA AAA 1-12 CookAAAAAAAAAAAA AXA AAA AAAAAAA AAA 1-13 HallAAAAAAAAAAAA AAA AXA AAAAAAA AAA 1-14 HancockAAAAAAAAA AXA AAA AAAAAAA AAA 1-15 HughesAAAAAAAAAA AAA AAA AAAXAAA AAA 1-16 MilesAAAAAAAAAAA AXA AAA AAAAAAA AAA 1-17 SparksAAAAAAAAAA AXA AAA AAAAAAA AAA 1-18 COMMITTEE SUBSTITUTE FOR S.B.ANo.A2919 By:AAMiles 1-19 A BILL TO BE ENTITLED 1-20 AN ACT 1-21 relating to power duration requirements in emergency contingency 1-22 plans adopted by end stage renal disease facilities.
(A)AAhas a type 2 essential electrical distribution system in accordance with the National Fire Protection Association 99, Section 4.5, and the National Fire Protection Association 110;
1-23 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
(B)AAis installed, tested, and maintained in accordance with the National Fire Protection Association 99, Section 4.5.4, and the National Fire Protection Association 110;
1-24 SECTIONA1.AASection 251.017, Health and Safety Code, is 1-25 amended by amending Subsection (b) and adding Subsection (f) to 1-26 read as follows:
and (C)AAis kept at all times not less than 10 feet from the electrical transformer;
1-27 (b)AAUnless the facility adopts a plan described by 1-28 Subsection (d) or (e), an end stage renal disease facility must 1-29 adopt an emergency contingency plan as required by Subsection (a) 1-30 under which the facility is required:
(2)AAexcept as provided by Subsection (c), to maintain:
1-31 (1)AAto have an on-site emergency generator that:
(A)AAan on-site fuel source with sufficient [that contains enough] fuel capacity to power the on-site generator for 89R7856 LRM-D 1 S.B.ANo.A2919 not less than 72 [24] hours, as determined by the electrical load demand on the emergency generator for that period;
1-32 (A) AAhas a type 2 essential electrical 1-33 distribution system in accordance with the National Fire Protection 1-34 Association 99, Section 4.5, and the National Fire Protection 1-35 Association 110;
or (B)AAan on-site battery-powered generator with sufficient electrical capacity to power the facility for not less than 72 hours;
1-36 (B)AAis installed, tested, and maintained in 1-37 accordance with the National Fire Protection Association 99, 1-38 Section 4.5.4, and the National Fire Protection Association 110;
(3)AAto maintain a sufficient quantity of potable water on-site to operate the facility’ s water treatment system for not less than 24 hours;
1-39 and 1-40 (C) AAis kept at all times not less than 10 feet 1-41 from the electrical transformer;
and (4)AAto maintain a water valve connection that allows an outside vendor to provide potable water to operate the facility’s water treatment system.
1-42 (2)AAexcept as provided by Subsection (c), to maintain:
SECTION A2.AANot later than December 1, 2025, each end stage renal disease facility shall modify the facility s emergency contingency plan as necessary to comply with Section 251.017(b), Health and Safety Code, as amended by this Act.
1-43 (A)AAan on-site fuel source with sufficient [that 1-44 contains enough] fuel capacity to power the on-site generator for 1-45 not less than 72 [24] hours, as determined by the electrical load 1-46 demand on the emergency generator for that period;
SECTIONA3.AAThis Act takes effect September 1, 2025.
or 1-47 (B)AAan on-site battery-powered generator with 1-48 sufficient electrical capacity to power the facility for not less 1-49 than 72 hours;
1-50 (3)AAto maintain a sufficient quantity of potable water 1-51 on-site to operate the facility ’s water treatment system for not 1-52 less than 24 hours;
and 1-53 (4)AAto maintain a water valve connection that allows 1-54 an outside vendor to provide potable water to operate the 1-55 facility s water treatment system.
1-56 (f)AAIf an end stage renal disease facility determines it is 1-57 not feasible for the facility to install or maintain an on-site fuel 1-58 storage tank with capacity sufficient to store the fuel required 1-59 under Subsection (b)(2)(A), the facility must enter into an 1-60 agreement with a third party for the party to provide during a power C.S.S.B.ANo.A2919 2-1 outage the fuel required for the facility to comply with that 2-2 subsection.
2-3 SECTION A2.AANot later than December 1, 2025, each end stage 2-4 renal disease facility shall modify the facility s emergency 2-5 contingency plan as necessary to comply with Section 251.017(b), 2-6 Health and Safety Code, as amended by this Act.
2-7 SECTION A3.AAThis Act takes effect September 1, 2025.
2-8 * * * * * 2
View plain text versions (2)

Action History

  1. Placed on intent calendar

  2. Not again placed on intent calendar

  3. Placed on intent calendar

  4. Committee report printed and distributed

  5. Reported favorably as substituted

  6. Vote taken in committee

  7. Considered in public hearing

  8. Left pending in committee

  9. Considered in public hearing

  10. Scheduled for public hearing on . . .

  11. Referred to Health & Human Services

  12. Read first time

  13. Filed

  14. Received by the Secretary of the Senate

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

2 sponsors · 0 co-sponsors · 182 not signed on

Sponsors (2)

Co-sponsors (0)

None.

Not signed on (182)

182 members have not signed on to this bill.

Show all 182 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 2919 do?
Relating to power duration requirements in emergency contingency plans adopted by end stage renal disease facilities.
Who sponsors SB 2919?
SB 2919 is sponsored by Kelly Hancock (Republican) and Borris Miles (Democratic).
What is the current status of SB 2919?
This bill is in committee in the Senate. Introduced March 14, 2025. It must pass committee before a floor vote.
Where can I track SB 2919?
Track SB 2919 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 2919

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 2919

Last checked for changes 21 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →