SB 1757 — Relating to the operation of rock crushing facilities.
Last action — No action taken in committee
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill has passed both chambers. Introduced February 28, 2025. It now goes to the executive.
Next likely step: transmittal to the executive for signature or veto.
Summary
Relating to the operation of rock crushing facilities.
In the bill's own words, from its opening clause.
Bill Text
What changed in the latest version
210 added · 219 removedPlain-language change summary
The amendment to SB 1757 includes the addition of specific types of permits that are not required for facilities with air contaminants below a set de minimis level. This means the commission can create rules to determine what constitutes a de minimis level, allowing for the operation of certain facilities without needing permits under specified sections of the Health and Safety Code. The practical effect is that it may reduce regulatory burdens for facilities that fall below these thresholds, potentially making it easier for them to operate.
1-1 By:AABirdwell, JohnsonAlvarado S.B.ANo.A1757 1-2AAAAAJohnson (InA BILL TO BE ENTITLED AN ACT relating to the SenateA-AFiledoperation FebruaryA28,A2025;of rock crushing facilities.
MarchA13,A2025,BE 1-3IT readENACTED firstBY timeTHE andLEGISLATURE referredOF toTHE CommitteeSTATE onOF NaturalTEXAS: Resources;
1-4SECTION AprilA14,A2025,A1.AASection reported382.05101, adversely,Health withand favorableSafety CommitteeCode, 1-5is Substituteamended byto theread followingas vote:follows:
YeasSec. 7, Nays 2;
AprilA14,A2025,A382.05101.AADE 1-6MINIMIS sentAIR toCONTAMINANTS. printer.) 1-7 COMMITTEE VOTE 1-8 AAAAAAAAAAAAAA Yea Nay AbsentA PNV 1-9 BirdwellAAAAAA AXA AAA AAAAAAA AAA 1-10 ZaffiriniAAAAA AXA AAA AAAAAAA AAA 1-11 AlvaradoAAAAAA AXA AAA AAAAAAA AAA 1-12 BlancoAAAAAAAA AXA AAA AAAAAAA AAA 1-13 FloresAAAAAAAA AAA AXA AAAAAAA AAA 1-14 HancockAAAAAAA AAA AXA AAAAAAA AAA 1-15 HughesAAAAAAAA AXA AAA AAAAAAA AAA 1-16 ParkerAAAAAAAA AXA AAA AAAAAAA AAA 1-17 SparksAAAAAAAA AXA AAA AAAAAAA AAA 1-18 COMMITTEE SUBSTITUTE FOR S.B.ANo.A1757 By:AABirdwell 1-19 A BILL TO BE ENTITLED 1-20 AN ACT 1-21 relating to the operation of rock crushing facilities.
1-22The BEcommission ITmay ENACTEDdevelop BYby THErule LEGISLATUREthe OFcriteria THEto STATEestablish OFa TEXAS:de minimis level of air contaminants for facilities or groups of facilities below which the following types of permits are not required:
1-23(1)AAa SECTIONA1.AASectionpermit 382.05101,under HealthSection and382.0518 Safetyor Code,382.0519; is 1-24 amended to read as follows:
1-25(2)AAa Sec.A382.05101.AADEstandard MINIMISpermit AIRunder CONTAMINANTS.Section 382.05195, 382.05198, [or] 382.051985, or 382.0651;
Theor 1-26(3)AAa commissionpermit may develop by rule theunder criteriaSection to382.05196. establish a de 1-27 minimis level of air contaminants for facilities or groups of 1-28 facilities below which the following types of permits are not 1-29 required:
1-30SECTION (1)AAaA2.AASection permit382.0511(c), underHealth Sectionand 382.0518Safety orCode, 382.0519;is amended to read as follows:
1-31(c)AAThe (2)AAacommission standardmay permitauthorize underchanges Sectionin 382.05195,a 1-32federal 382.05198,source [or]to 382.051985,proceed before the owner or 382.0651;operator obtains a federal operating permit or revisions to a federal operating permit if:
or(1)AAthe 1-33changes (3)AAaare permitde byminimis rule under Section 382.05196.382.05101;
1-34or SECTIONA2.AASection(2)AAthe 382.0511(c),owner Healthor andoperator: Safety Code, is 1-35 amended to read as follows:
1-36(A)AAhas (c)AATheobtained commission may authorize changes in a federalpreconstruction sourcepermit 1-37 to proceed before the owner or operator obtains a federal operating 1-38 permit oramendment revisionsrequired toby aSection federal382.0518; operating permit if:
1-39or (1)AAtheS.B.ANo.A1757 changes(B)AAis areoperating deunder: minimis under Section 1-40 382.05101;
or(i)AAa 1-41standard (2)AAthepermit ownerunder Section 382.05195, 382.05198, [or] 382.051985, or operator:382.0651;
1-42(ii)AAa (A) AAhas obtained a preconstruction permit orby 1-43rule permitunder amendment required by Section 382.0518;382.05196;
or 1-44(iii)AAan (B)AAisexemption operatingallowed under:under Section 382.057.
1-45SECTIONA3.AASubchapter (i)AAaC, standardChapter permit382, underHealth Sectionand 1-46Safety 382.05195,Code, 382.05198,is [or]amended 382.051985,by oradding 382.0651;Sections 382.0651 and 382.0652 to read as follows:
1-47Sec. (ii)AAa permit by rule under Section 1-48 382.05196;
orA382.0651.AASTANDARD 1-49PERMIT (iii)AAanFOR exemptionCERTAIN allowedROCK underCRUSHING SectionFACILITIES. 1-50 382.057.
1-51(a) SECTIONA3.AASubchapterThe C,commission Chaptershall 382,issue Healtha andstandard Safetypermit 1-52for Code,a isrock amendedcrushing byfacility addingthat: Sections 382.0651 and 382.0652 to read as 1-53 follows:
1-54(1)AAis Sec.A382.0651.AASTANDARDlocated PERMITat FORan CERTAINaggregate ROCKproduction CRUSHINGoperation 1-55required FACILITIES.to be registered under Section 28A.051, Water Code;
(a)(2)AAprocesses Thenot commissionmore shallthan issue1,500 atons standardof permit for a 1-56 rock crushingper facilityhour; that:
1-57and (1)AAis(3)AAmeets locatedthe atrequirements anof aggregatethis productionsection. operation 1-58 required to be registered under Section 28A.051, Water Code;
1-59(b)AAThe (2)AAprocessesstandard notpermit moreissued thanunder 1,500this tonssection must require that an owner or operator of rocka perfacility 1-60authorized hour;to use the permit, in addition to any other applicable requirements of this chapter:
(1)AAinstall and C.S.S.B.ANo.A1757operate 2-1for (3)AAmeets the requirementsfirst 12 consecutive months of thisoperation section.under the standard permit equipment to monitor:
2-2(A)AAwater (b)AAThequality standardin permitsedimentation issuedponds underat thisthe sectionaggregate mustproduction 2-3operation requirefor thatthe anpresence ownerof orcontaminants operatorregulated ofby athe facilitycommission’s authorizedmulti-sector togeneral usepermit 2-4for theS.B.ANo.A1757 permit,mineral inmining additionand toprocessing anyfacilities otherissued applicableunder requirementsChapter of26, 2-5Water thisCode; chapter:
2-6(B)AAthe (1)AAinstallseismicity and operate for the first 12 consecutive 2-7 months of operationextraction underactivities, theincluding standardblasting permitalong equipmentactive toextraction monitor:areas;
2-8and (A)AAwater(C)AAemissions qualityof inair sedimentationcontaminants, pondsif at the 2-9facility aggregateis productionlocated operationwithin for440 theyards presence of contaminantstwo 2-10or regulatedmore byother theaggregate commission’sproduction multi-sectoroperations; general permit for 2-11 mineral mining and processing facilities issued under Chapter 26, 2-12 Water Code;
2-13(2)AAmaintain (B)AAtherecords seismicity of extractionmonitoring activities,data 2-14from includingthe blastingmonitoring alongequipment activerequired extractionby areas;Subdivision (1) until the first anniversary of the date on which the data was collected;
and(3)AAestablish 2-15a (C)plan AAemissionsfor ofproviding airnotice contaminants,of ifemergencies theto 2-16owners facilityand istenants located within 440 yards of twoadjacent orreal moreproperty; other aggregate 2-17 production operations;
2-18(4)AAimplement (2)AAmaintainbest recordsmanagement ofpractices monitoringfor: data from the 2-19 monitoring equipment required by Subdivision (1) until the first 2-20 anniversary of the date on which the data was collected;
2-21(A)AAconserving (3)AAestablishwater; a plan for providing notice of 2-22 emergencies to owners and tenants of adjacent real property;
2-23and (4)AAimplement(B)AAminimizing bestvisible managementdust practicesfrom for:active extraction areas at the aggregate production operation;
2-24and (A)AAconserving(5)AAexcept water;as provided by Subsection (d), submit to the commission a post-extraction land use plan that includes, if applicable:
and(A)AAprovisions 2-25for (B)permanent AAminimizingremoval visibleof dust from active 2-26 extraction areasequipment; at the aggregate production operation;
and(B)AAprovisions 2-27for (5)AAexceptrevegetation, asincluding providedthe byuse Subsectionof (d),appropriate submitlocal tovegetation 2-28types thethat commissionare aadequate for post-extraction landuses useof planland, thatas includes,determined ifby 2-29the applicable:owner or operator;
2-30(C)AAproposed (A)AAprovisionsland forreuse permanentoptions, removalsuch as agricultural, natural, open space, or redevelopment uses or the S.B.ANo.A1757 creation of 2-31a extractionpond equipment;or lake;
2-32and (B)(D)AAif AAprovisionsthe forextraction revegetation,area includingcontains thea 2-33pit usethat ofis appropriatedeeper localthan vegetation10 typesfeet, thatprovisions are adequate for 2-34benching post-extractionat uses10-foot ofintervals land,or as determinedconsistent bywith the ownergeology orof 2-35the operator;pit and face wall.
Show all 83 changed lines (43 more)
2-36(c)AAThe (C)AAproposedcommission landby reuserule options,shall suchadopt asbest 2-37management agricultural,practices natural,for open space, or redevelopment uses or the 2-38purposes creation of aSubsection pond(b)(4). or lake;
and(d)AAIf 2-39the (D)AAifland on which the extractionfacility areato containsbe apermitted pitis thatlocated is 2-40owned deeperby a person other than 10the feet,owner provisionsor foroperator benchingof atthe 10-footfacility, intervalsthe 2-41owner or asoperator consistentof withthe facility may submit to the geologycommission ofan agreement made between the pitlandowner and facethe wall.facility owner or operator for post-extraction land uses instead of the post-extraction land use plan required under Subsection (b)(5).
2-42(e)AAThe (c)AAThe commission byshall ruleinspect shalla adoptfacility bestfor managementcompliance 2-43with practicesthis forsection theduring purposesregular ofinspections Subsectionunder (b)(4).this chapter and Chapter 28A, Water Code.
2-44Sec.A382.0652.AASTANDARD (d)AAIfPERMIT theFOR landCERTAIN onROCK whichCRUSHING theFACILITIES: facility to be permitted is 2-45 located is owned by a person other than the owner or operator of the 2-46 facility, the owner or operator of the facility may submit to the 2-47 commission an agreement made between the landowner and the facility 2-48 owner or operator for post-extraction land uses instead of the 2-49 post-extraction land use plan required under Subsection (b)(5).
2-50 (e)AAThe commission shall inspect a facility for compliance 2-51 with this section during regular inspections under this chapter and 2-52 Chapter 28A, Water Code.
2-53 Sec.A382.0652.AASTANDARD PERMIT FOR CERTAIN ROCK CRUSHING 2-54 FACILITIES:
(a) A person may not begin 2-55 construction of a new or modification of an existing rock crushing 2-56 facility under a standard permit issued under Section 382.0651 2-57 unless the commission authorizes the person to use the permit as 2-58 provided by this section.
The notice and meeting requirements of 2-59 this section apply only to an application for authorization to use a 2-60 standard permit issued under Section 382.0651.
2-61 (b)AAAn applicant for an authorization to use a standard 2-62 permit issued under Section 382.0651 must publish notice under this 2-63 section not later than the earlier of:
2-64 (1)AAthe 30th day after the date the applicant receives 2-65S.B.ANo.A1757 written notice from the executive director that the application is 2-66 technically complete;
or 2-67 (2)AAthe 75th day after the date the executive director 2-68 receives the application.
2-69 (c)AAThe applicant must publish notice at least once in a C.S.S.B.ANo.A1757 3-1 newspaper of general circulation in the municipality in which the 3-2 facility is located or proposed to be located or in the municipality 3-3 nearest to the location or proposed location of the facility.
If 3-4 the elementary or middle school nearest to the location or proposed 3-5 location of the facility provides a bilingual education program as 3-6 required by Subchapter B, Chapter 29, Education Code, the applicant 3-7 must also publish the notice at least once in an additional 3-8 publication of general circulation in each municipality or county 3-9 in which the facility is located or proposed to be located that is 3-10 published in the language taught in the bilingual education 3-11 program.
This requirement is waived if such a publication does not 3-12 exist or if the publisher refuses to publish the notice.
3-13 (d)AAThe notice must include:
3-14 (1)AAa brief description of the location or proposed 3-15 location and nature of the facility;
3-16 (2)AAa description, including a telephone number, of 3-17 the manner in which the executive director may be contacted for 3-18 further information;
3-19 (3)AAa description, including a telephone number, of 3-20 the manner in which the applicant may be contacted for further 3-21 information;
3-22 (4)AAthe location and hours of operation of the 3-23S.B.ANo.A1757 commission ’ss regional office at which a copy of the application is 3-24 available for review and copying;
and 3-25 (5)AAa brief description of the public comment process, 3-26 including the time and location of the public meeting to be held 3-27 under Subsection (e) and the mailing address and deadline for 3-28 filing written comments.
3-29 (e)AAThe applicant, in cooperation with the executive 3-30 director, must hold a public meeting in the county in which the 3-31 facility is located or proposed to be located not less than 30 days 3-32 and not more than 45 days after the first date notice is published 3-33 under Subsection (b).
3-34 (f)AAAt the site of the facility or proposed facility, the 3-35 applicant shall place a sign declaring the filing of an application 3-36 for an authorization to use a standard permit issued under Section 3-37 382.0651 for a rock crushing facility at the site and stating the 3-38 manner in which the commission may be contacted for further 3-39 information.
The commission shall adopt any rule necessary to 3-40 carry out this subsection.
3-41 (g)AAThe public comment period for written comments begins on 3-42 the first date notice is published under Subsection (b) and must 3-43 remain open for 36 hours after the close of the public meeting.
3-44 (h)AANot later than the 30th day before the date of the public 3-45 meeting, the commission shall notify the following entities of the 3-46 date, time, and place of the meeting:
3-47 (1)AAeach municipality and county in which the facility 3-48 is located or proposed to be located;
3-49 (2)AAthe Texas Department of Transportation;
3-50S.B.ANo.A1757 (3)AAeach groundwater conservation district with 3-51 jurisdiction over the area in which the facility is located or 3-52 proposed to be located;
and 3-53 (4)AAeach state representative and state senator 3-54 representing the area in which the facility is located or proposed 3-55 to be located.
3-56 (i)AASection 382.056 of this code and Chapter 2001, 3-57 Government Code, do not apply to a public meeting held under this 3-58 section.
A public meeting held under this section is not an 3-59 evidentiary proceeding.
Any person may submit an oral or written 3-60 statement concerning the application at the public meeting.
The 3-61 commission may set reasonable limits on the time allowed for oral 3-62 statements at the public meeting.
3-63 (j)AANot later than the 35th day after the date the public 3-64 meeting is held, the executive director shall approve or deny the 3-65 application for authorization to use the standard permit.
The 3-66 executive director shall base the decision on whether the 3-67 application meets the requirements of Section 382.0651.
The 3-68 executive director shall consider all relevant and material 3-69 comments received during the public comment period and at the C.S.S.B.ANo.A1757 4-1 public meeting in determining whether to approve the application.
4-2 If the executive director denies the application, the executive 4-3 director shall state the reasons for the denial and any 4-4 modifications to the application that are necessary for the 4-5 facility to qualify for the authorization.
4-6(k) (k)AATheAAThe executive director shall issue a written response to 4-7 any relevant and material public comments received related to the 4-8S.B.ANo.A1757 issuance of an authorization to use the standard permit at the same 4-9 time as or as soon as practicable after the executive director 4-10 grants or denies the application.
Issuance of the response after 4-11 the granting or denial of the application does not affect the 4-12 validity of the executive director’ s decision to grant or deny the 4-13 application.
4-14 (1)AAmail the response to each person who filed a 4-15 comment;
and 4-16 (2)AAmake the response available to the public.
4-17SECTION SECTIONA4.AAThisA4.AAThis Act takes effect September 1, 2025.
4-18 * * * * * 4
Show all 83 changed rows (43 more)
Compared against the Texas statutes as published AI-generated reading aid — verify against the official bill.
This bill amends 2 section(s) of the Texas statutes: Section 382.05101, Health and Safety Code, Section 382.0511(c), Health and Safety Code.
-
Section 382.05101, Health and Safety Code
or→ , or 382.0651amended
-
Section 382.0511(c), Health and Safety Code
or→ , or 382.0651amended
-
Sec. 382.0651. STANDARD PERMIT FOR CERTAIN ROCK CRUSHING FACILITIES. (a) The commission shall issue a standard permit for a rock crushing facility that: (1) is located at an aggregate production operation required to be registered under Section 28A.051, Water Code; (2) processes not more than 1,500 tons of rock per hour; and (3) meets the requirements of this section. (b) The standard permit issued under this section must require that an owner or operator of a facility authorized to use the permit, in addition to any other applicable requirements of this chapter: (1) install and operate for the first 12 consecutive months of operation under the standard permit equipment to monitor: (A) water quality in mining pits and sedimentation ponds at the aggregate production operation for the presence of contaminants related to aggregate extraction; (B) the seismicity of extraction activities, including blasting along active extraction areas; and (C) emissions of air contaminants, if the facility is located within 440 yards of two or more other aggregate production operations; (2) maintain records of monitoring data from the monitoring equipment required by Subdivision (1) until the second anniversary of the date on which the data was collected; (3) establish a plan for providing notice of emergencies to: (A) owners and tenants of adjacent real property and the property owners' association of each adjacent residential subdivision, as applicable; and (B) each member of the board of trustees of a school district that serves the geographic area in which the facility is located; (4) implement best management practices for: (A) conserving water; (B) minimizing visible dust from active extraction areas at the aggregate production operation, including those areas not immediately revegetated; (C) removing, selling, or otherwise disposing of noncommercial material and old and unused extraction equipment located at the facility site; and (D) cleaning and mowing of on-site equipment yards; and (5) submit to the commission, and implement, a post-extraction land use plan that includes: (A) provisions for permanent removal of extraction equipment; (B) provisions for revegetation, including the use of appropriate local vegetation types that are adequate for post-extraction uses of land, as determined by the owner or operator; (C) slope and grading standards to allow for traversing of livestock; (D) proposed land reuse options, such as agricultural, natural, open space, or redevelopment uses or the creation of a pond or lake; and (E) if the extraction area contains a pit that is deeper than 10 feet, provisions for benching at 10-foot intervals or as consistent with the geology of the pit and face wall. (c) The commission by rule shall adopt best management practices for the purposes of Subsection (b)(4). (d) The commission may provide an exception from a provision of a post-extraction land use plan for the owner or operator of the facility implementing the plan under Subsection (b)(5) for good cause. (e) If the land on which the facility to be permitted is located is owned by a person other than the owner or operator of the facility, the owner or operator of the facility may submit to the commission, and implement, an agreement made between the landowner and the facility owner or operator for post-extraction land uses instead of the post-extraction land use plan required under Subsection (b)(5). (f) The commission shall inspect a facility for compliance with this section during regular inspections under this chapter and Chapter 28A, Water Code. Sec. 382.0652. STANDARD PERMIT FOR CERTAIN ROCK CRUSHING FACILITIES: NOTICE AND HEARING. (a) A person may not begin construction of a new or modification of an existing rock crushing facility under a standard permit issued under Section 382.0651 unless the commission authorizes the person to use the permit as provided by this section. The notice and hearing requirements of this section apply only to an applicati
amended
Action History
-
No action taken in committee
-
Referred to Environmental Regulation
-
Read first time
-
Received from the Senate
-
Reported engrossed
-
Record vote
-
Passed
-
Read 3rd time
-
Record vote
-
Three day rule suspended
-
Record vote
-
Read 2nd time & passed to engrossment
-
Record vote
-
Rules suspended-Regular order of business
-
Co-author authorized
-
Placed on intent calendar
-
Committee report printed and distributed
-
Reported favorably as substituted
-
Vote taken in committee
-
Considered in public hearing
-
Posting rule suspended
-
Left pending in committee
-
Testimony taken in committee
-
Considered in public hearing
-
Scheduled for public hearing on . . .
-
Referred to Natural Resources
-
Read first time
-
Filed
-
Received by the Secretary of the Senate
Sponsors
- Nathan Johnson · Primary
- Brian Birdwell · Primary
- Carol Alvarado · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →2 sponsors · 1 co-sponsors · 181 not signed on
Sponsors (2)
- Nathan Johnson Democratic
- Brian Birdwell Republican
Co-sponsors (1)
- Carol Alvarado Democratic
Not signed on (181)
181 members have not signed on to this bill.
Show all 181 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
- Senate Natural Resources Referred March 13, 2025
- House Environmental Regulation Referred May 02, 2025
Subjects
Frequently asked questions
- What does SB 1757 do?
- Relating to the operation of rock crushing facilities.
- Who sponsors SB 1757?
- SB 1757 is sponsored by Nathan Johnson (Democratic), Brian Birdwell (Republican), and Carol Alvarado (Democratic).
- What is the current status of SB 1757?
- This bill has passed both chambers. Introduced February 28, 2025. It now goes to the executive.
- Where can I track SB 1757?
- Track SB 1757 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 1757
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 1757
Last checked for changes 18 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →