Texas 89th Legislature, Regular Session Status: Passed House Bipartisan · sponsors 2 D · 1 R

SB 1757 — Relating to the operation of rock crushing facilities.

Last action — No action taken in committee

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill has passed both chambers. Introduced February 28, 2025. It now goes to the executive.

Next likely step: transmittal to the executive for signature or veto.

Summary

Relating to the operation of rock crushing facilities.

In the bill's own words, from its opening clause.

Bill Text

What changed in the latest version

210 added · 219 removed

Plain-language change summary

The amendment to SB 1757 includes the addition of specific types of permits that are not required for facilities with air contaminants below a set de minimis level. This means the commission can create rules to determine what constitutes a de minimis level, allowing for the operation of certain facilities without needing permits under specified sections of the Health and Safety Code. The practical effect is that it may reduce regulatory burdens for facilities that fall below these thresholds, potentially making it easier for them to operate.

→
Previous
Latest
1-1 By:AABirdwell, Johnson S.B.ANo.A1757 1-2 (In the SenateA-AFiled FebruaryA28,A2025;
By:AABirdwell, Alvarado S.B.ANo.A1757 AAAAAJohnson A BILL TO BE ENTITLED AN ACT relating to the operation of rock crushing facilities.
MarchA13,A2025, 1-3 read first time and referred to Committee on Natural Resources;
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
1-4 AprilA14,A2025, reported adversely, with favorable Committee 1-5 Substitute by the following vote:
SECTION A1.AASection 382.05101, Health and Safety Code, is amended to read as follows:
Yeas 7, Nays 2;
Sec.
AprilA14,A2025, 1-6 sent to printer.) 1-7 COMMITTEE VOTE 1-8 AAAAAAAAAAAAAA Yea Nay AbsentA PNV 1-9 BirdwellAAAAAA AXA AAA AAAAAAA AAA 1-10 ZaffiriniAAAAA AXA AAA AAAAAAA AAA 1-11 AlvaradoAAAAAA AXA AAA AAAAAAA AAA 1-12 BlancoAAAAAAAA AXA AAA AAAAAAA AAA 1-13 FloresAAAAAAAA AAA AXA AAAAAAA AAA 1-14 HancockAAAAAAA AAA AXA AAAAAAA AAA 1-15 HughesAAAAAAAA AXA AAA AAAAAAA AAA 1-16 ParkerAAAAAAAA AXA AAA AAAAAAA AAA 1-17 SparksAAAAAAAA AXA AAA AAAAAAA AAA 1-18 COMMITTEE SUBSTITUTE FOR S.B.ANo.A1757 By:AABirdwell 1-19 A BILL TO BE ENTITLED 1-20 AN ACT 1-21 relating to the operation of rock crushing facilities.
A382.05101.AADE MINIMIS AIR CONTAMINANTS.
1-22 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
The commission may develop by rule the criteria to establish a de minimis level of air contaminants for facilities or groups of facilities below which the following types of permits are not required:
1-23 SECTIONA1.AASection 382.05101, Health and Safety Code, is 1-24 amended to read as follows:
(1)AAa permit under Section 382.0518 or 382.0519;
1-25 Sec.A382.05101.AADE MINIMIS AIR CONTAMINANTS.
(2)AAa standard permit under Section 382.05195, 382.05198, [or] 382.051985, or 382.0651;
The 1-26 commission may develop by rule the criteria to establish a de 1-27 minimis level of air contaminants for facilities or groups of 1-28 facilities below which the following types of permits are not 1-29 required:
or (3)AAa permit by rule under Section 382.05196.
1-30 (1)AAa permit under Section 382.0518 or 382.0519;
SECTION A2.AASection 382.0511(c), Health and Safety Code, is amended to read as follows:
1-31 (2)AAa standard permit under Section 382.05195, 1-32 382.05198, [or] 382.051985, or 382.0651;
(c)AAThe commission may authorize changes in a federal source to proceed before the owner or operator obtains a federal operating permit or revisions to a federal operating permit if:
or 1-33 (3)AAa permit by rule under Section 382.05196.
(1)AAthe changes are de minimis under Section 382.05101;
1-34 SECTIONA2.AASection 382.0511(c), Health and Safety Code, is 1-35 amended to read as follows:
or (2)AAthe owner or operator:
1-36 (c)AAThe commission may authorize changes in a federal source 1-37 to proceed before the owner or operator obtains a federal operating 1-38 permit or revisions to a federal operating permit if:
(A)AAhas obtained a preconstruction permit or permit amendment required by Section 382.0518;
1-39 (1)AAthe changes are de minimis under Section 1-40 382.05101;
or S.B.ANo.A1757 (B)AAis operating under:
or 1-41 (2)AAthe owner or operator:
(i)AAa standard permit under Section 382.05195, 382.05198, [or] 382.051985, or 382.0651;
1-42 (A) AAhas obtained a preconstruction permit or 1-43 permit amendment required by Section 382.0518;
(ii)AAa permit by rule under Section 382.05196;
or 1-44 (B)AAis operating under:
or (iii)AAan exemption allowed under Section 382.057.
1-45 (i)AAa standard permit under Section 1-46 382.05195, 382.05198, [or] 382.051985, or 382.0651;
SECTIONA3.AASubchapter C, Chapter 382, Health and Safety Code, is amended by adding Sections 382.0651 and 382.0652 to read as follows:
1-47 (ii)AAa permit by rule under Section 1-48 382.05196;
Sec.
or 1-49 (iii)AAan exemption allowed under Section 1-50 382.057.
A382.0651.AASTANDARD PERMIT FOR CERTAIN ROCK CRUSHING FACILITIES.
1-51 SECTIONA3.AASubchapter C, Chapter 382, Health and Safety 1-52 Code, is amended by adding Sections 382.0651 and 382.0652 to read as 1-53 follows:
(a) The commission shall issue a standard permit for a rock crushing facility that:
1-54 Sec.A382.0651.AASTANDARD PERMIT FOR CERTAIN ROCK CRUSHING 1-55 FACILITIES.
(1)AAis located at an aggregate production operation required to be registered under Section 28A.051, Water Code;
(a) The commission shall issue a standard permit for a 1-56 rock crushing facility that:
(2)AAprocesses not more than 1,500 tons of rock per hour;
1-57 (1)AAis located at an aggregate production operation 1-58 required to be registered under Section 28A.051, Water Code;
and (3)AAmeets the requirements of this section.
1-59 (2)AAprocesses not more than 1,500 tons of rock per 1-60 hour;
(b)AAThe standard permit issued under this section must require that an owner or operator of a facility authorized to use the permit, in addition to any other applicable requirements of this chapter:
and C.S.S.B.ANo.A1757 2-1 (3)AAmeets the requirements of this section.
(1)AAinstall and operate for the first 12 consecutive months of operation under the standard permit equipment to monitor:
2-2 (b)AAThe standard permit issued under this section must 2-3 require that an owner or operator of a facility authorized to use 2-4 the permit, in addition to any other applicable requirements of 2-5 this chapter:
(A)AAwater quality in sedimentation ponds at the aggregate production operation for the presence of contaminants regulated by the commission’s multi-sector general permit for S.B.ANo.A1757 mineral mining and processing facilities issued under Chapter 26, Water Code;
2-6 (1)AAinstall and operate for the first 12 consecutive 2-7 months of operation under the standard permit equipment to monitor:
(B)AAthe seismicity of extraction activities, including blasting along active extraction areas;
2-8 (A)AAwater quality in sedimentation ponds at the 2-9 aggregate production operation for the presence of contaminants 2-10 regulated by the commission’s multi-sector general permit for 2-11 mineral mining and processing facilities issued under Chapter 26, 2-12 Water Code;
and (C)AAemissions of air contaminants, if the facility is located within 440 yards of two or more other aggregate production operations;
2-13 (B)AAthe seismicity of extraction activities, 2-14 including blasting along active extraction areas;
(2)AAmaintain records of monitoring data from the monitoring equipment required by Subdivision (1) until the first anniversary of the date on which the data was collected;
and 2-15 (C) AAemissions of air contaminants, if the 2-16 facility is located within 440 yards of two or more other aggregate 2-17 production operations;
(3)AAestablish a plan for providing notice of emergencies to owners and tenants of adjacent real property;
2-18 (2)AAmaintain records of monitoring data from the 2-19 monitoring equipment required by Subdivision (1) until the first 2-20 anniversary of the date on which the data was collected;
(4)AAimplement best management practices for:
2-21 (3)AAestablish a plan for providing notice of 2-22 emergencies to owners and tenants of adjacent real property;
(A)AAconserving water;
2-23 (4)AAimplement best management practices for:
and (B)AAminimizing visible dust from active extraction areas at the aggregate production operation;
2-24 (A)AAconserving water;
and (5)AAexcept as provided by Subsection (d), submit to the commission a post-extraction land use plan that includes, if applicable:
and 2-25 (B) AAminimizing visible dust from active 2-26 extraction areas at the aggregate production operation;
(A)AAprovisions for permanent removal of extraction equipment;
and 2-27 (5)AAexcept as provided by Subsection (d), submit to 2-28 the commission a post-extraction land use plan that includes, if 2-29 applicable:
(B)AAprovisions for revegetation, including the use of appropriate local vegetation types that are adequate for post-extraction uses of land, as determined by the owner or operator;
2-30 (A)AAprovisions for permanent removal of 2-31 extraction equipment;
(C)AAproposed land reuse options, such as agricultural, natural, open space, or redevelopment uses or the S.B.ANo.A1757 creation of a pond or lake;
2-32 (B) AAprovisions for revegetation, including the 2-33 use of appropriate local vegetation types that are adequate for 2-34 post-extraction uses of land, as determined by the owner or 2-35 operator;
and (D)AAif the extraction area contains a pit that is deeper than 10 feet, provisions for benching at 10-foot intervals or as consistent with the geology of the pit and face wall.
Show all 83 changed rows (43 more)
Previous
Latest
2-36 (C)AAproposed land reuse options, such as 2-37 agricultural, natural, open space, or redevelopment uses or the 2-38 creation of a pond or lake;
(c)AAThe commission by rule shall adopt best management practices for the purposes of Subsection (b)(4).
and 2-39 (D)AAif the extraction area contains a pit that is 2-40 deeper than 10 feet, provisions for benching at 10-foot intervals 2-41 or as consistent with the geology of the pit and face wall.
(d)AAIf the land on which the facility to be permitted is located is owned by a person other than the owner or operator of the facility, the owner or operator of the facility may submit to the commission an agreement made between the landowner and the facility owner or operator for post-extraction land uses instead of the post-extraction land use plan required under Subsection (b)(5).
2-42 (c)AAThe commission by rule shall adopt best management 2-43 practices for the purposes of Subsection (b)(4).
(e)AAThe commission shall inspect a facility for compliance with this section during regular inspections under this chapter and Chapter 28A, Water Code.
2-44 (d)AAIf the land on which the facility to be permitted is 2-45 located is owned by a person other than the owner or operator of the 2-46 facility, the owner or operator of the facility may submit to the 2-47 commission an agreement made between the landowner and the facility 2-48 owner or operator for post-extraction land uses instead of the 2-49 post-extraction land use plan required under Subsection (b)(5).
Sec.A382.0652.AASTANDARD PERMIT FOR CERTAIN ROCK CRUSHING FACILITIES:
2-50 (e)AAThe commission shall inspect a facility for compliance 2-51 with this section during regular inspections under this chapter and 2-52 Chapter 28A, Water Code.
2-53 Sec.A382.0652.AASTANDARD PERMIT FOR CERTAIN ROCK CRUSHING 2-54 FACILITIES:
(a) A person may not begin 2-55 construction of a new or modification of an existing rock crushing 2-56 facility under a standard permit issued under Section 382.0651 2-57 unless the commission authorizes the person to use the permit as 2-58 provided by this section.
(a) A person may not begin construction of a new or modification of an existing rock crushing facility under a standard permit issued under Section 382.0651 unless the commission authorizes the person to use the permit as provided by this section.
The notice and meeting requirements of 2-59 this section apply only to an application for authorization to use a 2-60 standard permit issued under Section 382.0651.
The notice and meeting requirements of this section apply only to an application for authorization to use a standard permit issued under Section 382.0651.
2-61 (b)AAAn applicant for an authorization to use a standard 2-62 permit issued under Section 382.0651 must publish notice under this 2-63 section not later than the earlier of:
(b)AAAn applicant for an authorization to use a standard permit issued under Section 382.0651 must publish notice under this section not later than the earlier of:
2-64 (1)AAthe 30th day after the date the applicant receives 2-65 written notice from the executive director that the application is 2-66 technically complete;
(1)AAthe 30th day after the date the applicant receives S.B.ANo.A1757 written notice from the executive director that the application is technically complete;
or 2-67 (2)AAthe 75th day after the date the executive director 2-68 receives the application.
or (2)AAthe 75th day after the date the executive director receives the application.
2-69 (c)AAThe applicant must publish notice at least once in a C.S.S.B.ANo.A1757 3-1 newspaper of general circulation in the municipality in which the 3-2 facility is located or proposed to be located or in the municipality 3-3 nearest to the location or proposed location of the facility.
(c)AAThe applicant must publish notice at least once in a newspaper of general circulation in the municipality in which the facility is located or proposed to be located or in the municipality nearest to the location or proposed location of the facility.
If 3-4 the elementary or middle school nearest to the location or proposed 3-5 location of the facility provides a bilingual education program as 3-6 required by Subchapter B, Chapter 29, Education Code, the applicant 3-7 must also publish the notice at least once in an additional 3-8 publication of general circulation in each municipality or county 3-9 in which the facility is located or proposed to be located that is 3-10 published in the language taught in the bilingual education 3-11 program.
If the elementary or middle school nearest to the location or proposed location of the facility provides a bilingual education program as required by Subchapter B, Chapter 29, Education Code, the applicant must also publish the notice at least once in an additional publication of general circulation in each municipality or county in which the facility is located or proposed to be located that is published in the language taught in the bilingual education program.
This requirement is waived if such a publication does not 3-12 exist or if the publisher refuses to publish the notice.
This requirement is waived if such a publication does not exist or if the publisher refuses to publish the notice.
3-13 (d)AAThe notice must include:
(d)AAThe notice must include:
3-14 (1)AAa brief description of the location or proposed 3-15 location and nature of the facility;
(1)AAa brief description of the location or proposed location and nature of the facility;
3-16 (2)AAa description, including a telephone number, of 3-17 the manner in which the executive director may be contacted for 3-18 further information;
(2)AAa description, including a telephone number, of the manner in which the executive director may be contacted for further information;
3-19 (3)AAa description, including a telephone number, of 3-20 the manner in which the applicant may be contacted for further 3-21 information;
(3)AAa description, including a telephone number, of the manner in which the applicant may be contacted for further information;
3-22 (4)AAthe location and hours of operation of the 3-23 commission ’s regional office at which a copy of the application is 3-24 available for review and copying;
(4)AAthe location and hours of operation of the S.B.ANo.A1757 commission s regional office at which a copy of the application is available for review and copying;
and 3-25 (5)AAa brief description of the public comment process, 3-26 including the time and location of the public meeting to be held 3-27 under Subsection (e) and the mailing address and deadline for 3-28 filing written comments.
and (5)AAa brief description of the public comment process, including the time and location of the public meeting to be held under Subsection (e) and the mailing address and deadline for filing written comments.
3-29 (e)AAThe applicant, in cooperation with the executive 3-30 director, must hold a public meeting in the county in which the 3-31 facility is located or proposed to be located not less than 30 days 3-32 and not more than 45 days after the first date notice is published 3-33 under Subsection (b).
(e)AAThe applicant, in cooperation with the executive director, must hold a public meeting in the county in which the facility is located or proposed to be located not less than 30 days and not more than 45 days after the first date notice is published under Subsection (b).
3-34 (f)AAAt the site of the facility or proposed facility, the 3-35 applicant shall place a sign declaring the filing of an application 3-36 for an authorization to use a standard permit issued under Section 3-37 382.0651 for a rock crushing facility at the site and stating the 3-38 manner in which the commission may be contacted for further 3-39 information.
(f)AAAt the site of the facility or proposed facility, the applicant shall place a sign declaring the filing of an application for an authorization to use a standard permit issued under Section 382.0651 for a rock crushing facility at the site and stating the manner in which the commission may be contacted for further information.
The commission shall adopt any rule necessary to 3-40 carry out this subsection.
The commission shall adopt any rule necessary to carry out this subsection.
3-41 (g)AAThe public comment period for written comments begins on 3-42 the first date notice is published under Subsection (b) and must 3-43 remain open for 36 hours after the close of the public meeting.
(g)AAThe public comment period for written comments begins on the first date notice is published under Subsection (b) and must remain open for 36 hours after the close of the public meeting.
3-44 (h)AANot later than the 30th day before the date of the public 3-45 meeting, the commission shall notify the following entities of the 3-46 date, time, and place of the meeting:
(h)AANot later than the 30th day before the date of the public meeting, the commission shall notify the following entities of the date, time, and place of the meeting:
3-47 (1)AAeach municipality and county in which the facility 3-48 is located or proposed to be located;
(1)AAeach municipality and county in which the facility is located or proposed to be located;
3-49 (2)AAthe Texas Department of Transportation;
(2)AAthe Texas Department of Transportation;
3-50 (3)AAeach groundwater conservation district with 3-51 jurisdiction over the area in which the facility is located or 3-52 proposed to be located;
S.B.ANo.A1757 (3)AAeach groundwater conservation district with jurisdiction over the area in which the facility is located or proposed to be located;
and 3-53 (4)AAeach state representative and state senator 3-54 representing the area in which the facility is located or proposed 3-55 to be located.
and (4)AAeach state representative and state senator representing the area in which the facility is located or proposed to be located.
3-56 (i)AASection 382.056 of this code and Chapter 2001, 3-57 Government Code, do not apply to a public meeting held under this 3-58 section.
(i)AASection 382.056 of this code and Chapter 2001, Government Code, do not apply to a public meeting held under this section.
A public meeting held under this section is not an 3-59 evidentiary proceeding.
A public meeting held under this section is not an evidentiary proceeding.
Any person may submit an oral or written 3-60 statement concerning the application at the public meeting.
Any person may submit an oral or written statement concerning the application at the public meeting.
The 3-61 commission may set reasonable limits on the time allowed for oral 3-62 statements at the public meeting.
The commission may set reasonable limits on the time allowed for oral statements at the public meeting.
3-63 (j)AANot later than the 35th day after the date the public 3-64 meeting is held, the executive director shall approve or deny the 3-65 application for authorization to use the standard permit.
(j)AANot later than the 35th day after the date the public meeting is held, the executive director shall approve or deny the application for authorization to use the standard permit.
The 3-66 executive director shall base the decision on whether the 3-67 application meets the requirements of Section 382.0651.
The executive director shall base the decision on whether the application meets the requirements of Section 382.0651.
The 3-68 executive director shall consider all relevant and material 3-69 comments received during the public comment period and at the C.S.S.B.ANo.A1757 4-1 public meeting in determining whether to approve the application.
The executive director shall consider all relevant and material comments received during the public comment period and at the public meeting in determining whether to approve the application.
4-2 If the executive director denies the application, the executive 4-3 director shall state the reasons for the denial and any 4-4 modifications to the application that are necessary for the 4-5 facility to qualify for the authorization.
If the executive director denies the application, the executive director shall state the reasons for the denial and any modifications to the application that are necessary for the facility to qualify for the authorization.
4-6 (k)AAThe executive director shall issue a written response to 4-7 any relevant and material public comments received related to the 4-8 issuance of an authorization to use the standard permit at the same 4-9 time as or as soon as practicable after the executive director 4-10 grants or denies the application.
(k) AAThe executive director shall issue a written response to any relevant and material public comments received related to the S.B.ANo.A1757 issuance of an authorization to use the standard permit at the same time as or as soon as practicable after the executive director grants or denies the application.
Issuance of the response after 4-11 the granting or denial of the application does not affect the 4-12 validity of the executive director’ s decision to grant or deny the 4-13 application.
Issuance of the response after the granting or denial of the application does not affect the validity of the executive director’ s decision to grant or deny the application.
4-14 (1)AAmail the response to each person who filed a 4-15 comment;
(1)AAmail the response to each person who filed a comment;
and 4-16 (2)AAmake the response available to the public.
and (2)AAmake the response available to the public.
4-17 SECTIONA4.AAThis Act takes effect September 1, 2025.
SECTION A4.AAThis Act takes effect September 1, 2025.
4-18 * * * * * 4
View plain text versions (3)

How this bill changes current law

3 changes Share ↗

Compared against the Texas statutes as published AI-generated reading aid — verify against the official bill.

This bill amends 2 section(s) of the Texas statutes: Section 382.05101, Health and Safety Code, Section 382.0511(c), Health and Safety Code.

  • Section 382.05101, Health and Safety Code

    or → , or 382.0651

    amended

  • Section 382.0511(c), Health and Safety Code

    or → , or 382.0651

    amended

  • Sec. 382.0651. STANDARD PERMIT FOR CERTAIN ROCK CRUSHING FACILITIES. (a) The commission shall issue a standard permit for a rock crushing facility that: (1) is located at an aggregate production operation required to be registered under Section 28A.051, Water Code; (2) processes not more than 1,500 tons of rock per hour; and (3) meets the requirements of this section. (b) The standard permit issued under this section must require that an owner or operator of a facility authorized to use the permit, in addition to any other applicable requirements of this chapter: (1) install and operate for the first 12 consecutive months of operation under the standard permit equipment to monitor: (A) water quality in mining pits and sedimentation ponds at the aggregate production operation for the presence of contaminants related to aggregate extraction; (B) the seismicity of extraction activities, including blasting along active extraction areas; and (C) emissions of air contaminants, if the facility is located within 440 yards of two or more other aggregate production operations; (2) maintain records of monitoring data from the monitoring equipment required by Subdivision (1) until the second anniversary of the date on which the data was collected; (3) establish a plan for providing notice of emergencies to: (A) owners and tenants of adjacent real property and the property owners' association of each adjacent residential subdivision, as applicable; and (B) each member of the board of trustees of a school district that serves the geographic area in which the facility is located; (4) implement best management practices for: (A) conserving water; (B) minimizing visible dust from active extraction areas at the aggregate production operation, including those areas not immediately revegetated; (C) removing, selling, or otherwise disposing of noncommercial material and old and unused extraction equipment located at the facility site; and (D) cleaning and mowing of on-site equipment yards; and (5) submit to the commission, and implement, a post-extraction land use plan that includes: (A) provisions for permanent removal of extraction equipment; (B) provisions for revegetation, including the use of appropriate local vegetation types that are adequate for post-extraction uses of land, as determined by the owner or operator; (C) slope and grading standards to allow for traversing of livestock; (D) proposed land reuse options, such as agricultural, natural, open space, or redevelopment uses or the creation of a pond or lake; and (E) if the extraction area contains a pit that is deeper than 10 feet, provisions for benching at 10-foot intervals or as consistent with the geology of the pit and face wall. (c) The commission by rule shall adopt best management practices for the purposes of Subsection (b)(4). (d) The commission may provide an exception from a provision of a post-extraction land use plan for the owner or operator of the facility implementing the plan under Subsection (b)(5) for good cause. (e) If the land on which the facility to be permitted is located is owned by a person other than the owner or operator of the facility, the owner or operator of the facility may submit to the commission, and implement, an agreement made between the landowner and the facility owner or operator for post-extraction land uses instead of the post-extraction land use plan required under Subsection (b)(5). (f) The commission shall inspect a facility for compliance with this section during regular inspections under this chapter and Chapter 28A, Water Code. Sec. 382.0652. STANDARD PERMIT FOR CERTAIN ROCK CRUSHING FACILITIES: NOTICE AND HEARING. (a) A person may not begin construction of a new or modification of an existing rock crushing facility under a standard permit issued under Section 382.0651 unless the commission authorizes the person to use the permit as provided by this section. The notice and hearing requirements of this section apply only to an applicati

    amended

Action History

  1. No action taken in committee

  2. Referred to Environmental Regulation

  3. Read first time

  4. Received from the Senate

  5. Reported engrossed

  6. Record vote

  7. Passed

  8. Read 3rd time

  9. Record vote

  10. Three day rule suspended

  11. Record vote

  12. Read 2nd time & passed to engrossment

  13. Record vote

  14. Rules suspended-Regular order of business

  15. Co-author authorized

  16. Placed on intent calendar

  17. Committee report printed and distributed

  18. Reported favorably as substituted

  19. Vote taken in committee

  20. Considered in public hearing

  21. Posting rule suspended

  22. Left pending in committee

  23. Testimony taken in committee

  24. Considered in public hearing

  25. Scheduled for public hearing on . . .

  26. Referred to Natural Resources

  27. Read first time

  28. Filed

  29. Received by the Secretary of the Senate

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

2 sponsors · 1 co-sponsors · 181 not signed on

Sponsors (2)

Co-sponsors (1)

Not signed on (181)

181 members have not signed on to this bill.

Show all 181 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 1757 do?
Relating to the operation of rock crushing facilities.
Who sponsors SB 1757?
SB 1757 is sponsored by Nathan Johnson (Democratic), Brian Birdwell (Republican), and Carol Alvarado (Democratic).
What is the current status of SB 1757?
This bill has passed both chambers. Introduced February 28, 2025. It now goes to the executive.
Where can I track SB 1757?
Track SB 1757 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 1757

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.