SB 1978 — Relating to the interconnection of a facility in the ERCOT power region to certain other facilities.

Last action — Referred to State Affairs

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill has passed both chambers. Introduced March 06, 2025. It now goes to the executive.

Next likely step: transmittal to the executive for signature or veto.

Bill Text

What changed in the latest version

98 added · 113 removed

Plain-language change summary

The amendment to SB 1978 allows electric cooperatives not to obtain a certificate of public convenience and necessity for building or expanding certain generating and interconnection facilities. It also clarifies the definition of "facility" to include various types related to electricity. Additionally, it specifies that electric cooperatives and certain utilities cannot interconnect facilities in the ERCOT power region to facilities outside Texas or to those directly linked with out-of-state facilities. This change may simplify the process for electric cooperatives to develop and connect energy facilities within Texas.

→
Previous
Latest
1-1 By:AAHall S.B.ANo.A1978 1-2 (In the SenateA-AFiled MarchA6,A2025;
By:AAHall, Hughes S.B.ANo.A1978 AAAAAKolkhorst A BILL TO BE ENTITLED AN ACT relating to the interconnection of a facility in the ERCOT power region to certain other facilities.
MarchA17,A2025, read 1-3 first time and referred to Committee on Business & Commerce;
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
1-4 MayA16,A2025, reported adversely, with favorable Committee 1-5 Substitute by the following vote:
SECTION A1.AASection 37.051, Utilities Code, is amended by amending Subsections (c), (c-1), (c-2), and (c-3) and adding Subsection (c-4) to read as follows:
Yeas 7, Nays 4;
(c) AANotwithstanding any other provision of this chapter except Subsection (c-1)[, including Subsection (a)], an electric cooperative is not required to obtain a certificate of public convenience and necessity for the construction, installation, operation, or extension of any generating facilities or necessary interconnection facilities.
MayA16,A2025, 1-6 sent to printer.) 1-7 COMMITTEE VOTE 1-8 AAAAAAAAAAAAAAAAAAA Yea Nay AbsentA PNV 1-9 SchwertnerAAAAAAAAA AXA AAA AAAAAAA AAA 1-10 KingAAAAAAAAAAAAAAA AXA AAA AAAAAAA AAA 1-11 BlancoAAAAAAAAAAAAA AAA AXA AAAAAAA AAA 1-12 CampbellAAAAAAAAAAA AXA AAA AAAAAAA AAA 1-13 CreightonAAAAAAAAAA AXA AAA AAAAAAA AAA 1-14 JohnsonAAAAAAAAAAAA AAA AXA AAAAAAA AAA 1-15 KolkhorstAAAAAAAAAA AXA AAA AAAAAAA AAA 1-16 Men¯ndezAAAAAAAAAAA AAA AXA AAAAAAA AAA 1-17 MiddletonAAAAAAAAAA AXA A A AAAAAAA AAA 1-18 NicholsAA AAAAA AAA AXA AAA AAAAAAA AAA 1-19 ZaffiriniAAAAAAAAAA AAA AXA AAAAAAA AAA 1-20 COMMITTEE SUBSTITUTE FOR S.B.ANo.A1978 By:AAKing 1-21 A BILL TO BE ENTITLED 1-22 AN ACT 1-23 relating to the interconnection of a facility in the ERCOT power 1-24 region to certain other facilities.
(c-1)AAIn this subsection, "facility" means a facility that consumes, generates, transmits, or distributes electricity.
1-25 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
Notwithstanding any other provision of this title except Section 11.009, and except as provided by Subsection (c-3) [(c-2)], an electric cooperative, [a person, including] an electric utility, a [or] municipally owned utility, or another person[,] may not interconnect a facility in [to] the ERCOT power region to a facility located wholly or partly outside of this state or to a facility that is connected directly or indirectly with a facility located wholly or partly outside of this state, [transmission grid that enables additional power to be imported into or exported out of the ERCOT S.B.ANo.A1978 power grid] unless:
1-26 SECTIONA1.AASection 37.051, Utilities Code, is amended by 1-27 amending Subsections (c), (c-1), (c-2), and (c-3) and adding 1-28 Subsection (c-4) to read as follows:
(1)AAthe proposed interconnection will not subject the ERCOT power region to additional federal control or jurisdiction;
1-29 (c)AANotwithstanding any other provision of this chapter 1-30 except Subsection (c-1)[, including Subsection (a)], an electric 1-31 cooperative is not required to obtain a certificate of public 1-32 convenience and necessity for the construction, installation, 1-33 operation, or extension of any generating facilities or necessary 1-34 interconnection facilities.
(2)AAthe commission first determines that the proposed interconnection is in the public interest after considering:
1-35 (c-1)AAIn this subsection, "facility" means a facility that 1-36 consumes, generates, transmits, or distributes electricity.
(A)AAthe technical attributes of the proposed interconnection;
1-37 Notwithstanding any other provision of this title except Section 1-38 11.009, and except as provided by Subsection (c-3) [(c-2)], an 1-39 electric cooperative, [a person, including] an electric utility, a 1-40 [or] municipally owned utility, or another person[,] may not 1-41 interconnect a facility in [to] the ERCOT power region to a facility 1-42 located wholly or partly outside of this state or to a facility that 1-43 is connected directly or indirectly with a facility located wholly 1-44 or partly outside of this state, [transmission grid that enables 1-45 additional power to be imported into or exported out of the ERCOT 1-46 power grid] unless:
(B)AAthe expected costs to the public to install, operate, and maintain the interconnection;
1-47 (1)AAthe proposed interconnection will not subject the 1-48 ERCOT power region to additional federal control or jurisdiction;
(C)AAthe results of relevant criteria adopted by the commission under Section 37.056(d);
1-49 (2)AAthe commission first determines that the proposed 1-50 interconnection is in the public interest after considering:
(D)AAthe results of a reliability assessment conducted by the independent organization certified under Section 39.151 for the ERCOT power region;
1-51 (A) AAthe technical attributes of the proposed 1-52 interconnection;
and (E)AAany other information the commission considers appropriate;
1-53 (B) AAthe expected costs to the public to install, 1-54 operate, and maintain the interconnection;
(3)AAthe cooperative, utility, or person applies for a public interest determination from the commission under Subdivision (2) [the person obtains a certificate from the commission stating that public convenience and necessity requires or will require the interconnection.
1-55 (C) AAthe results of relevant criteria adopted by 1-56 the commission under Section 37.056(d);
The person must apply for the certificate] not later than the 180th day before the date the cooperative, utility, or person seeks any order from the Federal Energy Regulatory Commission related to the proposed interconnection;
1-57 (D)AAthe results of a reliability assessment 1-58 conducted by the independent organization certified under Section 1-59 39.151 for the ERCOT power region;
and (4)AAafter the cooperative, utility, or person obtains any order from the Federal Energy Regulatory Commission related to S.B.ANo.A1978 the proposed interconnection, the commission grants a certificate stating that public convenience or necessity requires or will require the interconnection.
and 1-60 (E)AAany other information the commission C.S.S.B.ANo.A1978 2-1 considers appropriate;
(c-2) AAThe commission shall apply Section 37.056 in considering an application under Subsection (c-1) [this subsection].
2-2 (3)AAthe cooperative, utility, or person applies for a 2-3 public interest determination from the commission under 2-4 Subdivision (2) [the person obtains a certificate from the 2-5 commission stating that public convenience and necessity requires 2-6 or will require the interconnection.
[In addition, the commission must determine that the application is consistent with the public interest before granting the certificate.] The commission may adopt rules necessary to implement Subsection (c-1) [this subsection].
The person must apply for the 2-7 certificate] not later than the 180th day before the date the 2-8 cooperative, utility, or person seeks any order from the Federal 2-9 Energy Regulatory Commission related to the proposed 2-10 interconnection;
Subsection (c-1) [This subsection] does not apply to a facility that is in service on December 31, 2014.
and 2-11 (4)AAafter the cooperative, utility, or person obtains 2-12 any order from the Federal Energy Regulatory Commission related to 2-13 the proposed interconnection, the commission grants a certificate 2-14 stating that public convenience or necessity requires or will 2-15 require the interconnection.
(c-3) A[(c-2)]AAThe commission, not later than the 185th day after the date the application is filed, shall approve an application filed under Subsection (c-1) for a facility that is to be constructed under an interconnection agreement appended to an offer of settlement approved in a final order of the Federal Energy Regulatory Commission that was issued in Docket No.ATX11-01-001 on or before December 31, 2014, directing physical connection between the ERCOT and SERC regions under Sections 210, 211, and 212 of the Federal Power Act (16 U.S.C.
2-16 (c-2)AAThe commission shall apply Section 37.056 in 2-17 considering an application under Subsection (c-1) [this 2-18 subsection].
[In addition, the commission must determine that the 2-19 application is consistent with the public interest before granting 2-20 the certificate.] The commission may adopt rules necessary to 2-21 implement Subsection (c-1) [this subsection].
Subsection (c-1) 2-22 [This subsection] does not apply to a facility that is in service on 2-23 December 31, 2014.
2-24 (c-3)A[(c-2)]AAThe commission, not later than the 185th day 2-25 after the date the application is filed, shall approve an 2-26 application filed under Subsection (c-1) for a facility that is to 2-27 be constructed under an interconnection agreement appended to an 2-28 offer of settlement approved in a final order of the Federal Energy 2-29 Regulatory Commission that was issued in Docket No.ATX11-01-001 on 2-30 or before December 31, 2014, directing physical connection between 2-31 the ERCOT and SERC regions under Sections 210, 211, and 212 of the 2-32 Federal Power Act (16 U.S.C.
In 2-33 approving the application, the commission may prescribe reasonable 2-34 conditions to protect the public interest that are consistent with 2-35 the final order of the Federal Energy Regulatory Commission.
In approving the application, the commission may prescribe reasonable conditions to protect the public interest that are consistent with the final order of the Federal Energy Regulatory Commission.
2-36 (c-4)A[(c-3)]AANothing in Subsection (c-1), [or] (c-2), or 2-37 (c-3) is intended to restrict the authority of the commission or the 2-38 independent organization certified under Section 39.151 for the 2-39 ERCOT power region to adopt rules or protocols of general 2-40 applicability.
(c-4)A[(c-3)]AANothing in Subsection (c-1), [or] (c-2), or (c-3) is intended to restrict the authority of the commission or the independent organization certified under Section 39.151 for the ERCOT power region to adopt rules or protocols of general S.B.ANo.A1978 applicability.
2-41 SECTIONA2.AAThe changes in law made by this Act in Section 2-42 37.051, Utilities Code, apply only to an interconnection made on or 2-43 after the effective date of this Act.
SECTION A2.AAThe changes in law made by this Act in Section 37.051, Utilities Code, apply only to an interconnection made on or after the effective date of this Act.
An interconnection made 2-44 before the effective date of this Act is governed by the law in 2-45 effect when the interconnection was made, and the former law is 2-46 continued in effect for that purpose.
An interconnection made before the effective date of this Act is governed by the law in effect when the interconnection was made, and the former law is continued in effect for that purpose.
2-47 SECTIONA3.AAThis Act takes effect immediately if it receives 2-48 a vote of two-thirds of all the members elected to each house, as 2-49 provided by Section 39, Article III, Texas Constitution.
SECTION A3.AAThis Act takes effect immediately if it receives a vote of two-thirds of all the members elected to each house, as provided by Section 39, Article III, Texas Constitution.
If this 2-50 Act does not receive the vote necessary for immediate effect, this 2-51 Act takes effect September 1, 2025.
If this Act does not receive the vote necessary for immediate effect, this Act takes effect September 1, 2025.
2-52 * * * * * 2
View plain text versions (3)

Action History

  1. Referred to State Affairs

  2. Read first time

  3. Received from the Senate

  4. Reported engrossed

  5. Record vote

  6. Passed

  7. Read 3rd time

  8. Record vote

  9. Rules suspended-Regular order of business

  10. Record vote

  11. Read 2nd time & passed to engrossment

  12. Record vote

  13. Rules suspended-Regular order of business

  14. Placed on intent calendar

  15. Co-author authorized

  16. Committee report printed and distributed

  17. Reported favorably as substituted

  18. Vote taken in committee

  19. Vote reconsidered in committee

  20. Failed to receive affirmative vote in comm.

  21. Considered in public hearing

  22. Left pending in committee

  23. Testimony taken in committee

  24. Considered in public hearing

  25. Scheduled for public hearing on . . .

  26. Referred to Business & Commerce

  27. Read first time

  28. Filed

  29. Received by the Secretary of the Senate

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 2 co-sponsors · 181 not signed on

Sponsors (1)

Co-sponsors (2)

Not signed on (181)

181 members have not signed on to this bill.

Show all 181 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 1978?
SB 1978 is sponsored by Bob Hall (Republican), Bryan Hughes (Republican), and Lois Kolkhorst (Republican).
What is the current status of SB 1978?
This bill has passed both chambers. Introduced March 06, 2025. It now goes to the executive.
Where can I track SB 1978?
Track SB 1978 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 1978

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 1978

Last checked for changes 21 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →