SB 1978 — Relating to the interconnection of a facility in the ERCOT power region to certain other facilities.
Last action — Referred to State Affairs
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill has passed both chambers. Introduced March 06, 2025. It now goes to the executive.
Next likely step: transmittal to the executive for signature or veto.
Bill Text
What changed in the latest version
98 added · 113 removedPlain-language change summary
The amendment to SB 1978 allows electric cooperatives not to obtain a certificate of public convenience and necessity for building or expanding certain generating and interconnection facilities. It also clarifies the definition of "facility" to include various types related to electricity. Additionally, it specifies that electric cooperatives and certain utilities cannot interconnect facilities in the ERCOT power region to facilities outside Texas or to those directly linked with out-of-state facilities. This change may simplify the process for electric cooperatives to develop and connect energy facilities within Texas.
1-1By:AAHall, By:AAHallHughes S.B.ANo.A1978 1-2AAAAAKolkhorst (InA BILL TO BE ENTITLED AN ACT relating to the SenateA-AFiledinterconnection MarchA6,A2025;of a facility in the ERCOT power region to certain other facilities.
MarchA17,A2025,BE readIT 1-3ENACTED firstBY timeTHE andLEGISLATURE referredOF toTHE CommitteeSTATE onOF BusinessTEXAS: & Commerce;
1-4SECTION MayA16,A2025,A1.AASection reported37.051, adversely,Utilities withCode, favorableis Committeeamended 1-5by Substituteamending bySubsections the(c), following(c-1), vote:(c-2), and (c-3) and adding Subsection (c-4) to read as follows:
Yeas(c) 7,AANotwithstanding Naysany 4;other provision of this chapter except Subsection (c-1)[, including Subsection (a)], an electric cooperative is not required to obtain a certificate of public convenience and necessity for the construction, installation, operation, or extension of any generating facilities or necessary interconnection facilities.
MayA16,A2025,(c-1)AAIn 1-6this sentsubsection, to"facility" printer.)means 1-7 COMMITTEE VOTE 1-8 AAAAAAAAAAAAAAAAAAA Yea Nay AbsentA PNV 1-9 SchwertnerAAAAAAAAA AXA AAA AAAAAAA AAA 1-10 KingAAAAAAAAAAAAAAA AXA AAA AAAAAAA AAA 1-11 BlancoAAAAAAAAAAAAA AAA AXA AAAAAAA AAA 1-12 CampbellAAAAAAAAAAA AXA AAA AAAAAAA AAA 1-13 CreightonAAAAAAAAAA AXA AAA AAAAAAA AAA 1-14 JohnsonAAAAAAAAAAAA AAA AXA AAAAAAA AAA 1-15 KolkhorstAAAAAAAAAA AXA AAA AAAAAAA AAA 1-16 Men¯ndezAAAAAAAAAAA AAA AXA AAAAAAA AAA 1-17 MiddletonAAAAAAAAAA AXA A A AAAAAAA AAA 1-18 NicholsAA AAAAA AAA AXA AAA AAAAAAA AAA 1-19 ZaffiriniAAAAAAAAAA AAA AXA AAAAAAA AAA 1-20 COMMITTEE SUBSTITUTE FOR S.B.ANo.A1978 By:AAKing 1-21 A BILL TO BE ENTITLED 1-22 AN ACT 1-23 relating to the interconnection of a facility inthat theconsumes, ERCOTgenerates, powertransmits, 1-24or regiondistributes toelectricity. certain other facilities.
1-25Notwithstanding BEany ITother ENACTEDprovision BYof THEthis LEGISLATUREtitle OFexcept THESection STATE11.009, OFand TEXAS:except as provided by Subsection (c-3) [(c-2)], an electric cooperative, [a person, including] an electric utility, a [or] municipally owned utility, or another person[,] may not interconnect a facility in [to] the ERCOT power region to a facility located wholly or partly outside of this state or to a facility that is connected directly or indirectly with a facility located wholly or partly outside of this state, [transmission grid that enables additional power to be imported into or exported out of the ERCOT S.B.ANo.A1978 power grid] unless:
1-26(1)AAthe SECTIONA1.AASectionproposed 37.051,interconnection Utilitieswill Code,not issubject amendedthe byERCOT 1-27power amendingregion Subsectionsto (c),additional (c-1),federal (c-2),control andor (c-3)jurisdiction; and adding 1-28 Subsection (c-4) to read as follows:
1-29(2)AAthe (c)AANotwithstandingcommission anyfirst otherdetermines provisionthat ofthe thisproposed chapterinterconnection 1-30 except Subsection (c-1)[, including Subsection (a)], an electric 1-31 cooperative is notin requiredthe to obtain a certificate of public 1-32interest convenienceafter andconsidering: necessity for the construction, installation, 1-33 operation, or extension of any generating facilities or necessary 1-34 interconnection facilities.
1-35(A)AAthe (c-1)AAIntechnical thisattributes subsection,of "facility"the meansproposed ainterconnection; facility that 1-36 consumes, generates, transmits, or distributes electricity.
1-37(B)AAthe Notwithstandingexpected anycosts otherto provision of this title except Section 1-38 11.009, and except as provided by Subsection (c-3) [(c-2)], an 1-39 electric cooperative, [a person, including] an electric utility, a 1-40 [or] municipally owned utility, or another person[,] may not 1-41 interconnect a facility in [to] the ERCOTpublic power region to ainstall, facilityoperate, 1-42and locatedmaintain wholly or partly outside of this state or to a facility that 1-43 is connected directly or indirectly with a facility located wholly 1-44 or partly outside of this state, [transmission grid that enables 1-45 additional power to be imported into or exported out of the ERCOTinterconnection; 1-46 power grid] unless:
1-47(C)AAthe (1)AAtheresults proposedof interconnectionrelevant willcriteria notadopted subjectby the 1-48commission ERCOTunder powerSection region37.056(d); to additional federal control or jurisdiction;
1-49(D)AAthe (2)AAtheresults commissionof firsta determinesreliability thatassessment conducted by the proposedindependent 1-50organization interconnectioncertified isunder inSection the39.151 publicfor interestthe afterERCOT considering:power region;
1-51and (A)(E)AAany AAtheother technicalinformation attributes of the proposedcommission 1-52considers interconnection;appropriate;
1-53(3)AAthe (B)cooperative, AAtheutility, expectedor costsperson toapplies thefor a public tointerest install,determination 1-54from operate,the commission under Subdivision (2) [the person obtains a certificate from the commission stating that public convenience and maintainnecessity requires or will require the interconnection;interconnection.
1-55The (C)person AAthemust resultsapply offor relevantthe criteriacertificate] adoptednot bylater 1-56than the commission180th underday Sectionbefore 37.056(d);the date the cooperative, utility, or person seeks any order from the Federal Energy Regulatory Commission related to the proposed interconnection;
1-57and (D)AAthe(4)AAafter resultsthe ofcooperative, autility, reliabilityor assessmentperson 1-58obtains conductedany byorder from the independentFederal organizationEnergy certifiedRegulatory underCommission Sectionrelated 1-59to 39.151S.B.ANo.A1978 forthe proposed interconnection, the ERCOTcommission powergrants region;a certificate stating that public convenience or necessity requires or will require the interconnection.
and(c-2) 1-60AAThe (E)AAanycommission othershall informationapply theSection commission37.056 C.S.S.B.ANo.A1978in 2-1considering considersan appropriate;application under Subsection (c-1) [this subsection].
2-2[In (3)AAtheaddition, cooperative,the utility,commission ormust persondetermine appliesthat forthe aapplication 2-3is publicconsistent interestwith determination from the commissionpublic underinterest 2-4before Subdivisiongranting (2) [the person obtains a certificate from the 2-5certificate.] The commission statingmay thatadopt publicrules conveniencenecessary andto necessityimplement requiresSubsection 2-6(c-1) or[this willsubsection]. require the interconnection.
TheSubsection person(c-1) must[This applysubsection] fordoes the 2-7 certificate] not laterapply thanto thea 180thfacility daythat beforeis thein dateservice theon 2-8December cooperative,31, utility,2014. or person seeks any order from the Federal 2-9 Energy Regulatory Commission related to the proposed 2-10 interconnection;
and(c-3) 2-11A[(c-2)]AAThe (4)AAaftercommission, not later than the cooperative,185th utility,day orafter personthe obtainsdate 2-12the anyapplication is filed, shall approve an application filed under Subsection (c-1) for a facility that is to be constructed under an interconnection agreement appended to an offer of settlement approved in a final order fromof the Federal Energy Regulatory Commission relatedthat towas 2-13issued thein proposedDocket interconnection,No.ATX11-01-001 theon commissionor grantsbefore aDecember certificate31, 2-142014, statingdirecting thatphysical publicconnection conveniencebetween orthe necessityERCOT requiresand orSERC willregions 2-15under requireSections 210, 211, and 212 of the interconnection.Federal Power Act (16 U.S.C.
2-16 (c-2)AAThe commission shall apply Section 37.056 in 2-17 considering an application under Subsection (c-1) [this 2-18 subsection].
[In addition, the commission must determine that the 2-19 application is consistent with the public interest before granting 2-20 the certificate.] The commission may adopt rules necessary to 2-21 implement Subsection (c-1) [this subsection].
Subsection (c-1) 2-22 [This subsection] does not apply to a facility that is in service on 2-23 December 31, 2014.
2-24 (c-3)A[(c-2)]AAThe commission, not later than the 185th day 2-25 after the date the application is filed, shall approve an 2-26 application filed under Subsection (c-1) for a facility that is to 2-27 be constructed under an interconnection agreement appended to an 2-28 offer of settlement approved in a final order of the Federal Energy 2-29 Regulatory Commission that was issued in Docket No.ATX11-01-001 on 2-30 or before December 31, 2014, directing physical connection between 2-31 the ERCOT and SERC regions under Sections 210, 211, and 212 of the 2-32 Federal Power Act (16 U.S.C.
In 2-33 approving the application, the commission may prescribe reasonable 2-34 conditions to protect the public interest that are consistent with 2-35 the final order of the Federal Energy Regulatory Commission.
2-36 (c-4)A[(c-3)]AANothing in Subsection (c-1), [or] (c-2), or 2-37 (c-3) is intended to restrict the authority of the commission or the 2-38 independent organization certified under Section 39.151 for the 2-39 ERCOT power region to adopt rules or protocols of general 2-40S.B.ANo.A1978 applicability.
2-41SECTION SECTIONA2.AATheA2.AAThe changes in law made by this Act in Section 2-42 37.051, Utilities Code, apply only to an interconnection made on or 2-43 after the effective date of this Act.
An interconnection made 2-44 before the effective date of this Act is governed by the law in 2-45 effect when the interconnection was made, and the former law is 2-46 continued in effect for that purpose.
2-47SECTION SECTIONA3.AAThisA3.AAThis Act takes effect immediately if it receives 2-48 a vote of two-thirds of all the members elected to each house, as 2-49 provided by Section 39, Article III, Texas Constitution.
If this 2-50 Act does not receive the vote necessary for immediate effect, this 2-51 Act takes effect September 1, 2025.
2-52 * * * * * 2
Action History
-
Referred to State Affairs
-
Read first time
-
Received from the Senate
-
Reported engrossed
-
Record vote
-
Passed
-
Read 3rd time
-
Record vote
-
Rules suspended-Regular order of business
-
Record vote
-
Read 2nd time & passed to engrossment
-
Record vote
-
Rules suspended-Regular order of business
-
Placed on intent calendar
-
Co-author authorized
-
Committee report printed and distributed
-
Reported favorably as substituted
-
Vote taken in committee
-
Vote reconsidered in committee
-
Failed to receive affirmative vote in comm.
-
Considered in public hearing
-
Left pending in committee
-
Testimony taken in committee
-
Considered in public hearing
-
Scheduled for public hearing on . . .
-
Referred to Business & Commerce
-
Read first time
-
Filed
-
Received by the Secretary of the Senate
Sponsors
- Bob Hall · Primary
- Bryan Hughes · Cosponsor
- Lois Kolkhorst · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 2 co-sponsors · 181 not signed on
Sponsors (1)
- Bob Hall Republican
Co-sponsors (2)
- Bryan Hughes Republican
- Lois Kolkhorst Republican
Not signed on (181)
181 members have not signed on to this bill.
Show all 181 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
- Senate Business and Commerce Referred March 17, 2025
- House State Affairs
Frequently asked questions
- Who sponsors SB 1978?
- SB 1978 is sponsored by Bob Hall (Republican), Bryan Hughes (Republican), and Lois Kolkhorst (Republican).
- What is the current status of SB 1978?
- This bill has passed both chambers. Introduced March 06, 2025. It now goes to the executive.
- Where can I track SB 1978?
- Track SB 1978 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 1978
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 1978
Last checked for changes 21 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →