SB 6 — Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.
Last action — Effective immediately
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed Senate
-
✓Passed House
-
✓To Executive
-
6Enacted
This bill has been enacted into law. Introduced February 12, 2025. Enacted.
Signed by Governor Greg Abbott (Republican) on June 20, 2025.
Summary
Relating to electricity planning and infrastructure costs for large loads.
In the bill's own words, from its opening clause.
Bill Text
What changed in the latest version
358 added · 270 removedPlain-language change summary
The amended bill includes new text specifying that large load customers, including those requesting significant interconnections, must contribute to the costs of connecting to electric utilities. It also clarifies that electric cooperatives or municipally owned utilities that do not have customer choice must pass these interconnection costs to large load customers based on their determinations. The changes emphasize planning for and the operational aspects of connecting large electrical loads, which may impact how new businesses interact with energy providers in Texas.
By:AAKing,S.B.ANo.A6 etAN al.ACT relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.
S.B.ANo.A6 AAAAA A BILL TO BE ENTITLED AN ACT relating to electricity planning and infrastructure costs for large loads.
(c-1)(c-1)AAThe AAThe commission by rule shall ensure that a large load customer who is subject to the standards adopted under Section 37.0561 contributes to the recovery of the interconnecting electric utility’s costs to interconnect the large load to the utility’ s system.
(c-2)AAAn(c-2) AAAn electric cooperative or municipally owned utility that has not adopted customer choice shall pass through to a large load customer who is subject to the standards adopted under Section 37.0561 the reasonable costs to interconnect the large load in a manner determined by the electric cooperative or municipally owned utility.
SECTIONA2.AASubchapterSECTION A2.AASubchapter B, Chapter 37, Utilities Code, is amended by adding Section 37.0561 to read as follows:
A37.0561.AAPLANNING REQUIREMENTS FOR AND INTERCONNECTION OF LARGE LOADS.
(a) TheFor commissionthe bypurposes ruleof shallthis establishsection, standardsa for interconnecting large load customerscustomer inincludes thean ERCOTentity powerrequesting regionan ininterconnection athat mannerexceeds designedthe toS.B.ANo.A6 supportdemand businessthreshold developmentadopted inunder thisSubsection state(c) whileand minimizinga thesuccessor potentialin forinterest strandedto infrastructuresuch costsan andentity. S.B.ANo.A6 maintaining system reliability.
(b) AAThe standardscommission mustby applyrule onlyshall toestablish customersstandards requestingfor ainterconnecting newlarge orload expandedcustomers interconnectionin where the totalERCOT loadpower atregion in a singlemanner sitedesigned wouldto exceedsupport abusiness demanddevelopment thresholdin establishedthis bystate thewhile commissionminimizing based on the sizepotential offor loadsstranded thatinfrastructure significantlycosts impactand transmissionmaintaining needssystem inreliability. the ERCOT power region.
The(c)AAThe commissionstandards shallmust establishapply aonly demandto thresholdcustomers ofrequesting 75a megawattsnew unlessor expanded interconnection where the commissiontotal determinesload thatat a lowersingle site would exceed a demand threshold isestablished necessaryby tothe accomplishcommission based on the purposessize describedof byloads Subsectionthat (a).significantly impact transmission needs in the ERCOT power region.
(c)AATheThe standardscommission mustshall requireestablish eacha largedemand loadthreshold customerof subject75 tomegawatts Subsectionunless (b) to disclose to the interconnectingcommission electricdetermines utilitythat ora municipallylower ownedthreshold utility whether the customer is pursuingnecessary ato substantiallyaccomplish similar request for electric service, inside or outside this state, the approvalpurposes ofdescribed whichby wouldSubsection result(b). in the customer materially changing, delaying, or withdrawing the interconnection request.
(d) AAThe standards must require each large load customer subject to Subsection (c) to disclose to the interconnecting electric utility or municipally owned utility whether the customer is pursuing a substantially similar request for electric service in this state the approval of which would result in the customer materially changing, delaying, or withdrawing the interconnection request.
The commission by rule shall prohibit an electric utility or municipally owned utility from selling, sharing, or disclosing information submitted to the utility under this subsection other than a disclosure to the commission or the independent organization certified under Section 39.151 for the S.B.ANo.A6 ERCOT power region, subject to appropriate confidentiality protections.
(d)AAThe(e) AAThe standards must require each interconnected large load customer subject to Subsection (b)(c) to disclose to the interconnecting electric utility or municipally owned utility information about the customer’s on-site backup generating S.B.ANo.A6 facilities and require the interconnecting electric utility or municipally owned utility to provide the information to the independent organization certified under Section 39.151 for the ERCOT power region.
The independent organization certified under Section 39.151 for the ERCOT power region shall establish a threshold before or during an energy emergency alert whereat which the organization may,may afterissue reasonable notice,notice directthat thelarge applicableload electriccustomers utilitywith oron-site municipallybackup ownedgenerating utilityfacilities tomay requirebe thedirected large load customer to either deploy the customer’s on-site backup generating facilityfacilities or curtail load.
TheAfter the independent organization certifieddeploys underall Sectionavailable 39.151market services, except for frequency responsive services, the ERCOTindependent powerorganization regionmay shalldirect includethe aapplicable deploymentelectric underutility thisor sectionmunicipally asowned firmutility to require the large load shedcustomer whento calculatingeither anydeploy pricethe adjustmentscustomer for’s reliabilityon-site deployments.backup generating facilities or curtail load.
The independent organization shall include a deployment under this section as firm load shed when calculating any price adjustments for reliability deployments.
S.B.ANo.A6 (1)AAauthorize or require a violation of any emissions limitation in state or federal law or a violation of any other environmental regulation;
(e)(f)AAThe AAThe standards must set a flat study fee of at least $100,000 to be paid to the interconnecting electric utility or municipally owned utility for initial transmission screening studies for large loads subject to Subsection (b).(c).
A large load customer that requests additional capacity following the screening S.B.ANo.A6 study must pay an additional study fee based on the new request.
(f)AAThe(g)AAThe standards must include a method for a large load customer subject to Subsection (b)(c) to demonstrate site control for the proposed load location through an ownership interest, lease, or another legal interest acceptable to the commission.
(g)(h)AAThe AAThe standards must include uniform financial commitment standardsrequirements for the development of transmission infrastructure needed to serve a large load customer subject to Subsection (b)(c). before an electric utility or municipally owned utility may submit a project for review to the independent organization certified under Section 39.151 for the ERCOT power region based on the large load customer’ s demand.
S.B.ANo.A6 (2)AAcontribution in aid of construction;
S.B.ANo.A6(i)AASecurity (h)AASecurity provided under Subsection (g)(1)(h)(1) must be refunded, in whole or in part, after the security is applied to any outstanding amounts owed:
or (2)AAif the large load customer withdraws the customer s request for all or a portion of the requested capacity.capacity;
(i)or AAThe(3)AAif standardscapacity mustsubject establishto a procedurefinancial tocommitment allowwill thebe independentreallocated organization certified under Section 39.151 for the ERCOT power region to accessone any information collected by the interconnecting electric utility or municipallymore ownedother utilitycustomers. to ensure compliance with the standards for transmission planning analysis.
Any(j)AAThe customer-specificcommission orshall competitivelyestablish sensitiveuniform informationrequirements obtainedfor underdetermining thiswhen subsectioncapacity that is confidentialsubject andto notan subjectoutstanding tofinancial disclosurecommitment under Chapterthis 552,section Governmentmay Code.be reallocated.
(j)AAThe(k) commissionAAThe maystandards notmust limitestablish a procedure to allow the authorityindependent oforganization acertified municipallyunder ownedSection utility39.151 orfor anthe electricERCOT cooperativepower region to imposeaccess retailany electricinformation servicecollected requirementsby forthe largeinterconnecting loadelectric customersutility onor theirmunicipally systemsowned inutility addition to ensure compliance with the standards adoptedfor undertransmission thisplanning section.analysis.
(k)AANotwithstandingAny thecustomer-specific forecastedor loadcompetitively growthsensitive andS.B.ANo.A6 additionalinformation loadobtained currently seeking interconnection required to be considered under Sectionthis 37.056(c-1),subsection theis commissionconfidential byand rulenot shallsubject establishto criteriadisclosure by which the independent organization certified under SectionChapter 39.151552, forGovernment theCode. ERCOT power region includes forecasted large load of any peak demand in the organization ’s transmission S.B.ANo.A6 planning and resource adequacy models and reports.
SECTION(l) A3.AASectionAAThe 39.002,commission Utilitiesmay Code,not islimit amendedthe authority of a municipally owned utility or an electric cooperative to readimpose aselectric follows:service requirements for large load customers on their systems in addition to the standards adopted under this section.
(m)AANotwithstanding the forecasted load growth and additional load currently seeking interconnection required to be considered under Section 37.056(c-1), the commission by rule shall establish criteria by which the independent organization certified under Section 39.151 for the ERCOT power region includes forecasted large load of any peak demand in the organization ’ s transmission planning and resource adequacy models and reports.
SECTIONA3.AASection 39.002, Utilities Code, is amended to read as follows:
SECTIONA4.AASubchapterSECTION A4.AASubchapter D, Chapter 39, Utilities Code, is amended by adding Sections 39.169 and 39.170 to read as follows:
S.B.ANo.A6 Sec.A39.169.AACO-LOCATION OF LARGE LOAD CUSTOMER WITH EXISTING GENERATION RESOURCE.
(a) A power generation company, municipally owned utility, or electric cooperative must submit a notice to the independent organization certified under Section 39.151 for the ERCOT power region before implementing a net metering arrangement between an operating facility registered with the independent organization as a stand-alone generation resource as of September 1, 2025, and a new large load customer as described by Section 37.0561(c).
(b)AAThis section does not apply to a generation resource:
(1)AAthe registration for which included a co-located large load customer at the time of energization, regardless of whether the load was energized at a later date;
or (2)AAa majority interest of which is owned indirectly or directly as of January 1, 2025, by a parent company of the customer that participates in the new net metering arrangement.
(c) AAThe electric cooperative, transmission and distribution utility, or municipally owned utility that provides electric service at the location of the new net metering arrangement may for reasonable cause including a violation of other law, object to the arrangement, provided however, that no reasonable cause objection may be raised after a final decision by the commission is issued under this section.
(d) AAThe independent organization certified under Section 39.151 for the ERCOT power region shall study the system impacts of a proposed net metering arrangement and removal of generation for which the independent organization receives a notice under S.B.ANo.A6 Subsection (a) after the independent organization receives all information regarding the arrangement required by the independent organization to be submitted to the independent organization.
The independent organization must complete the study and submit the results to the commission with any associated recommendations not later than the 120th day after the independent organization receives all required information regarding the arrangement.
Show all 95 changed lines (55 more)
Not later than the 60th day after the date the commission receives the study results from the independent organization, the commission shall approve, deny, or impose reasonable conditions on the proposed net metering arrangement as necessary to maintain system reliability, including transmission security and resource adequacy impacts.
The conditions must require a generation resource that makes dispatchable capacity available to the ERCOT power region before the implementation of a net metering arrangement under this section to make at least that amount of dispatchable capacity available to the ERCOT power region after the implementation of the arrangement at the direction of the independent organization in advance of an anticipated emergency condition.
The conditions may include:
(1)AArequiring the retail customer who is served behind-the-meter to reduce load during certain events;
(2)AArequiring the generation resource to make capacity available to the ERCOT power region during certain events;
or (3)AArequiring customers to be held harmless for stranded or underutilized transmission assets resulting from the behind-the-meter operation.
S.B.ANo.A6 (e)AAIf the commission does not approve, deny, or impose reasonable conditions on a proposed net metering arrangement before the expiration of the deadline established by Subsection (d), the commission is considered to have approved the arrangement.
(f)AAIf conditions imposed under Subsection (d) are not limited to a specific period, the commission shall review the conditions at least every five years to determine whether the conditions should be extended or rescinded.
(g)AAThe parties to a proceeding under this section are limited to the commission, the independent organization certified under Section 39.151 for the ERCOT power region, the interconnecting electric cooperative, transmission and distribution utility, or municipally owned utility, and a party in the net metering arrangement.
(h)AAThe commission shall post the decision made on each notice submitted under this section on the commission ’s Internet website.
The commission may not post information regarding the decision that is competitively sensitive or otherwise considered confidential.
A39.169.AACO-LOCATIONA39.170.AALARGE OFLOAD RETAILDEMAND CUSTOMERMANAGEMENT WITHSERVICE. EXISTING GENERATION RESOURCE.
(a)(a)AAThe Acommission powershall generationrequire company,the municipallyindependent ownedorganization utility,certified orunder electricSection cooperative39.151 mustfor submitthe aERCOT noticepower region to theensure commissionthat andeach theelectric independentcooperative, organizationtransmission certifiedand underdistribution Sectionutility, 39.151and formunicipally theowned ERCOTutility powerserving regiona beforetransmission-voltage implementingcustomer develops a netprotocol, meteringincluding arrangementthe betweeninstallation anof existing,any operatingnecessary facilityequipment registeredor withtechnology before the independentcustomer organizationis asinterconnected, ato generationallow resourcethe andload ato newbe largecurtailed loadS.B.ANo.A6 customerduring asfirm describedload byshed. Section 37.0561(b).
(b)The AATheelectric newcooperative, nettransmission meteringand arrangementdistribution mustutility, be requested or consentedmunicipally toowned byutility theshall electricconfer cooperative,with electricthe utility,customer orto municipallythe ownedextent utilityfeasible certificated to provideshed retailload electricin S.B.ANo.A6a servicecoordinated atmanner. the location.
The electric cooperative, electric utility, or municipally owned utility may withhold consent to a proposal that is consistent with the determination provided under Subsection (c) and applicable law only for a reasonable cause.
(c)AAWith input from the independent organization certified under Section 39.151 for the ERCOT power region, not later than the 180th day after the date the commission receives the notice under Subsection (a), the commission shall approve, deny, or impose reasonable conditions on a proposed net metering arrangement described by Subsection (a) as necessary to maintain system reliability, including transmission security and resource adequacy impacts.
The conditions may:
(1)AArequire the retail customer who is served behind-the-meter to reduce load during certain events;
(2)AArequire the generation resource to make capacity available to the ERCOT power region during certain events;
or (3)AAprovide that the owner of the generation resource may be held liable for stranded or underutilized transmission assets resulting from the behind-the-meter operation.
(d)AAIf the commission does not approve, deny, or impose reasonable conditions on a proposed net metering arrangement before the expiration of the deadline established by Subsection (c), the commission is considered to have approved the arrangement.
(e) AAIf conditions imposed under Subsection (c) are not limited to a specific period, the commission shall review the conditions at least every five years to determine whether the conditions should be extended or rescinded.
S.B.ANo.A6 (f)AAThe parties to a proceeding under this section are limited to the commission, the independent organization certified under Section 39.151 for the ERCOT power region, the interconnecting electric cooperative, electric utility, or municipally owned utility, and a party in the net metering arrangement.
Sec.A39.170.AALARGE LOAD DEMAND MANAGEMENT SERVICE.
(a)AAThe commission shall require the independent organization certified under Section 39.151 for the ERCOT power region to ensure that each electric cooperative, electric utility, and municipally owned utility serving a transmission-voltage customer develops a protocol and installs, or requires to be installed, before the customer is interconnected, any necessary equipment to allow the load to be curtailed during firm load shed.
The electric cooperative, electric utility, or municipally owned utility shall confer with the customer to the extent feasible to shed load in a coordinated manner.
(b) AAThe commission shall require the independent organization certified under Section 39.151 for the ERCOT power region to develop a reliability service to competitively procure demand reductions from large load customers with a demand of at least 75 megawatts to be deployed in the event of an anticipated S.B.ANo.A6 emergency condition.
(c)AAThe(c) AAThe independent organization certified under Section S.B.ANo.A6 39.151 for the ERCOT power region shall include a deployment under this section when calculating any price adjustments for reliability deployments.
SECTIONA5.AA(a)SECTION TheA5.AASubchapter PublicA, UtilityChapter Commission67, ofWater TexasCode, shallis evaluateamended whetherby theadding existing methodology used to charge wholesale transmission costs to distribution providers under Section 35.004(d),67.0115 Utilities Code, continues to appropriatelyread assignas costsfollows: for transmission investment.
Sec.A67.0115.AAELECTRIC GENERATION.
(a) A corporation may generate electric power for use in the corporation ’ s operations, limited to:
(1)AApowering water well pumps, service pumps, and other equipment for the production, treatment, and transportation of raw water;
and (2)AApowering infrastructure for the treatment and delivery of potable drinking water.
(b)AAFor the purposes of Subsection (a), a corporation operating solely as a wholesale water supplier or sewer service in a county with a population of less than 350,000 may generate excess electric power in conjunction with the uses described in Subsection (a) for sale in the ERCOT power region to provide revenue for the corporation only if the corporation:
(1)AAprimarily generates electric power solely for the uses described in Subsection (a);
and (2)AAregisters as a power generation company under Section 39.351, Utilities Code.
(c) AAA corporation that generates electric power for sale under Subsection (b) shall account for and use the revenue from those sales in a manner that complies with Section 67.004.
The revenue that accrues from those sales of electric power may be used S.B.ANo.A6 by the corporation only for:
(1)AAthe corporation ’s costs of producing and selling electric power, including administration, employees, equipment, fuel, and maintenance;
or (2)AAa purpose described by Section 67.002.
SECTION A6.AA(a) The Public Utility Commission of Texas shall evaluate whether the existing methodology used to charge wholesale transmission costs to distribution providers under Section 35.004(d), Utilities Code, continues to appropriately assign costs for transmission investment.
(2)AAwhether alternative methods to calculate S.B.ANo.A6 wholesale transmission rates would more appropriately assign the cost of providing access to and wholesale service from the transmission system, such as consideration of multiple seasonal peak demands, demand during different length daily intervals, or peak energy intervals;
(b)AAThe(b) AAThe Public Utility Commission of Texas shall evaluate whether the commission s retail ratemaking practices ensure that S.B.ANo.A6 transmission cost recovery appropriately charges the system costs that are caused by each customer class.
(c)AAThe(c) AAThe Public Utility Commission of Texas shall begin the evaluation required under Subsection (a) of this section not later than the 90th day after the effective date of this Act.
SECTIONA6.AASectionSECTIONA7.AASection 35.004(c-1), Utilities Code, as added by this Act, applies only to an interconnection agreement entered into on or after the effective date of this Act.
SECTION A7.AAThisA8.AAThis Act takes effect immediately if it receives a vote of two-thirds of all the members elected to each house, as provided by Section 39, Article III, Texas Constitution.
If this Act does not receive the vote necessary for immediate effect, this S.B.ANo.A6 Act takes effect September 1, 2025.
11S.B.ANo.A6 ______________________________AAAA______________________________ President of the SenateAAAAAAAAAAAAASpeaker of the House I hereby certify that S.B.ANo.A6 passed the Senate on MarchA19,A2025, by the following vote:
YeasA31, NaysA0;
and that the Senate concurred in House amendments on May 29, 2025, by the following vote:
YeasA31, NaysA0.
______________________________ AAAASecretary of the Senate I hereby certify that S.B.ANo.A6 passed the House, with amendments, on May A27,A2025, by the following vote:
YeasA103, NaysA25, two present not voting.
______________________________ AAAAChief Clerk of the House Approved:
______________________________ AAAAAAAAAAAAADate ______________________________ AAAAAAAAAAAGovernor 14
Show all 95 changed rows (55 more)
Action History
-
Effective immediately
-
Signed by the Governor
-
Sent to the Governor
-
Signed in the House
-
Signed in the Senate
-
Co-author authorized
-
Reported enrolled
-
Senate concurs in House amendment(s)-reported
-
Record vote
-
Senate concurs in House amendment(s)
-
Read
-
House amendment(s) laid before the Senate
-
House passage as amended reported
-
Statement(s) of vote recorded in Journal
-
Record vote
-
Passed
-
Read 3rd time
-
Record vote
-
Passed to 3rd reading as amended
-
Statement of Leg. Intent Recorded in Journal
-
Statement(s) of vote recorded in Journal
-
Record vote
-
Amended
-
Record vote
-
Amendment adopted as amended
-
Statement(s) of vote recorded in Journal
-
Record vote
-
Amendment amended
-
Amendment(s) offered
-
Read 2nd time
-
Placed on Major State Calendar
-
Considered in Calendars
-
Committee report sent to Calendars
-
Committee report distributed
-
Comte report filed with Committee Coordinator
-
Reported favorably as substituted
-
Committee substitute considered in committee
-
Considered in formal meeting
-
Recommitted to committee
-
Point of order withdrawn
-
Statement(s) of vote recorded in Journal
-
Record vote
-
Amended
-
Statement(s) of vote recorded in Journal
-
Record vote
-
Amended
-
Statement(s) of vote recorded in Journal
-
Record vote
-
Amendment adopted as amended
-
Statement(s) of vote recorded in Journal
-
Record vote
-
Amendment amended
-
Amendment(s) offered
-
Read 2nd time
-
Placed on General State Calendar
-
Considered in Calendars
-
Committee report sent to Calendars
-
Committee report distributed
-
Comte report filed with Committee Coordinator
-
Reported favorably as substituted
-
Committee substitute considered in committee
-
Considered in formal meeting
-
Left pending in committee
-
Testimony taken/registration(s) recorded in committee
-
Considered in public hearing
-
Referred to State Affairs
-
Read first time
-
Received from the Senate
-
Reported engrossed
-
Record vote
-
Passed
-
Read 3rd time
-
Record vote
-
Three day rule suspended
-
Vote recorded in Journal
-
Passed to engrossment as amended
-
Vote recorded in Journal
-
Amended
-
Amendment(s) offered
-
Read 2nd time
-
Rules suspended-Regular order of business
-
Co-author authorized
-
Placed on intent calendar
-
Co-author authorized
-
Committee report printed and distributed
-
Reported favorably as substituted
-
Vote taken in committee
-
Considered in public hearing
-
Co-author authorized
-
Left pending in committee
-
Testimony taken in committee
-
Considered in public hearing
-
Scheduled for public hearing on . . .
-
Co-author authorized
-
Referred to Business & Commerce
-
Read first time
-
Filed
-
Received by the Secretary of the Senate
Sponsors
- Phil King · Primary
- Phil King · Primary
- Charles Schwertner · Primary
- Carol Alvarado · Cosponsor
- César Blanco · Cosponsor
- Donna Campbell · Cosponsor
- Sarah Eckhardt · Cosponsor
- Brent Hagenbuch · Cosponsor
- Bryan Hughes · Cosponsor
- Mayes Middleton · Cosponsor
- Brandon Creighton · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →3 sponsors · 8 co-sponsors · 174 not signed on
Sponsors (3)
- Phil King Republican
- Phil King Republican
- Charles Schwertner Republican
Co-sponsors (8)
- Carol Alvarado Democratic
- César Blanco Democratic
- Donna Campbell Republican
- Sarah Eckhardt Democratic
- Brent Hagenbuch Republican
- Bryan Hughes Republican
- Mayes Middleton Republican
- Brandon Creighton Republican
Not signed on (174)
174 members have not signed on to this bill.
Show all 174 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
- Senate Business and Commerce Referred February 13, 2025
- House Calendars Referred May 20, 2025
- House Calendars Referred May 24, 2025
- House State Affairs
Frequently asked questions
- What does SB 6 do?
- Relating to electricity planning and infrastructure costs for large loads.
- Who sponsors SB 6?
- SB 6 is sponsored by Phil King (Republican), Charles Schwertner (Republican), Carol Alvarado (Democratic), César Blanco (Democratic), Donna Campbell (Republican), Sarah Eckhardt (Democratic), Brent Hagenbuch (Republican), Bryan Hughes (Republican), Mayes Middleton (Republican), and Brandon Creighton (Republican).
- What is the current status of SB 6?
- This bill has been enacted into law. Introduced February 12, 2025. Enacted.
- Where can I track SB 6?
- Track SB 6 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 6
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 6
Last checked for changes 19 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →