California 20252026 Regular Session Status: Introduced 1 D cosponsors

AB 2239 — Infrastructure-constrained energization areas: energization timelines: environmental review.

Last action — Referred to Coms. on U. & E. and NAT. RES.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the Assembly. Introduced February 19, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Prognosis

Not enough signal yet

Where this bill stands today.

Odds of enactment

Low

How often bills like it became law.

Not enough signal yet to read this bill's trajectory — we surface a likelihood only once there's real movement (stage, sponsorship, committee, or votes) to point to.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Summary

Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC to establish reasonable average and maximum target energization time periods, as defined, and a procedure for customers to report energization delays to the PUC, as provided. Existing law requires the PUC to require an electrical corporation to take remedial actions necessary to achieve the PUC's targets. This bill would require the PUC to require each electrical corporation to meet energization timelines or targets established pursuant to the above-described provisions or by PUC order. The bill would require the PUC to impose a penalty if an electrical corporation fails to meet an energization timeline or target approved or required by the PUC, as provided. This bill would require the PUC to designate an infrastructure-constrained energization area based on objective criteria, including limited distribution or transmission infrastructure relative to available electrical capacity or projected load growth, inland or desert geography, and extended energization timelines. The bill would require the PUC to adopt rules authorizing over-the-fence transactions within infrastructure-constrained energization areas when an electrical corporation cannot reasonably meet energization targets and other specific conditions are met, as specified. The bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission (Energy Commission) and local jurisdictions, to establish procedures to facilitate expedited development of electrical generation and energy storage facilities in infrastructure-constrained energization areas, as specified. The bill would require the PUC, in coordination with the Energy Commission, the Office of Land Use and Climate Innovation, and local jurisdictions, to establish procedures to facilitate expedited permitting, siting, and construction of electrical infrastructure owned or operated by an electrical corporation within infrastructure-constrained energization areas, as specified. The bill would require the PUC and the Energy Commission to coordinate with, and advocate before, the Independent System Operator (ISO) for expedited review and prioritization of projects in infrastructure-constrained energization areas, as specified. Existing law establishes the ISO as a nonprofit, public benefit corporation to ensure efficient use and reliable operation of the transmission grid and to manage the transmission grid and related energy markets, as specified. This bill would require the ISO to consider regional economic development needs, infrastructure constraints, and statewide policy objectives when conducting transmission planning and interconnection processes. The bill would require the ISO seek to streamline review and approval processes for projects located within infrastructure-constrained energization areas, as specified, and would require the ISO to annually report to the PUC and the Legislature on transmission and interconnection constraints affecting infrastructure-constrained energization areas. The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. This bill would exempt from the requirements of CEQA the approval of an electrical generation or energy storage project located within an infrastructure-constrained energization area if specific conditions are met, as provided. The bill would require the Office of Land Use and Climate Innovation to develop guidelines for the implementation of these provisions. Because a lead agency would be required to determine whether a project would qualify for this exemption, this bill would impose a state-mandated local program. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because certain of the above-described provisions would be part of the act and a violation of a PUC action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for specified reasons.

Bill Text

What changed in the latest version

1 added · 1 removed

Plain-language change summary

In the most recent version of AB 2239, there has been a small but significant update with one line added and one line removed. This change clarifies the language of the bill, making it easier for everyone to understand the intention behind the legislation. Such adjustments are important because they can enhance transparency and ensure that the bill's purpose is clear to lawmakers and the public alike.

→
Previous
Latest
Bill Number Bill Keyword Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites Bill Information >> Bill Search >> Text Bill TextBill Information PDF2 Bill PDF |Add To My Favorites |Track Bill | Version:
Bill Number Bill Keyword Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites Bill Information >> Bill Search >> Text Bill Text PDF2 Bill PDF |Add To My Favorites |Track Bill | Version:
View plain text versions (2)

Action History

  1. Referred to Coms. on U. & E. and NAT. RES.

  2. From printer. May be heard in committee March 22.

  3. Read first time. To print.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 121 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (121)

121 members have not signed on to this bill.

Show all 121 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does AB 2239 do?
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC to establish reasonable average and maximum target energization time periods, as defined, and a procedure for customers to report energization delays to the PUC, as provided. Existing law requires the PUC to require an electrical corporation to take remedial actions necessary to achieve the PUC's targets. This bill would require the PUC to require each electrical corporation to meet energization timelines or targets established pursuant to the above-described provisions or by PUC order. The bill would require the PUC to impose a penalty if an electrical corporation fails to meet an energization timeline or target approved or required by the PUC, as provided. This bill would require the PUC to designate an infrastructure-constrained energization area based on objective criteria, including limited distribution or transmission infrastructure relative to available electrical capacity or projected load growth, inland or desert geography, and extended energization timelines. The bill would require the PUC to adopt rules authorizing over-the-fence transactions within infrastructure-constrained energization areas when an electrical corporation cannot reasonably meet energization targets and other specific conditions are met, as specified. The bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission (Energy Commission) and local jurisdictions, to establish procedures to facilitate expedited development of electrical generation and energy storage facilities in infrastructure-constrained energization areas, as specified. The bill would require the PUC, in coordination with the Energy Commission, the Office of Land Use and Climate Innovation, and local jurisdictions, to establish procedures to facilitate expedited permitting, siting, and construction of electrical infrastructure owned or operated by an electrical corporation within infrastructure-constrained energization areas, as specified. The bill would require the PUC and the Energy Commission to coordinate with, and advocate before, the Independent System Operator (ISO) for expedited review and prioritization of projects in infrastructure-constrained energization areas, as specified. Existing law establishes the ISO as a nonprofit, public benefit corporation to ensure efficient use and reliable operation of the transmission grid and to manage the transmission grid and related energy markets, as specified. This bill would require the ISO to consider regional economic development needs, infrastructure constraints, and statewide policy objectives when conducting transmission planning and interconnection processes. The bill would require the ISO seek to streamline review and approval processes for projects located within infrastructure-constrained energization areas, as specified, and would require the ISO to annually report to the PUC and the Legislature on transmission and interconnection constraints affecting infrastructure-constrained energization areas. The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. This bill would exempt from the requirements of CEQA the approval of an electrical generation or energy storage project located within an infrastructure-constrained energization area if specific conditions are met, as provided. The bill would require the Office of Land Use and Climate Innovation to develop guidelines for the implementation of these provisions. Because a lead agency would be required to determine whether a project would qualify for this exemption, this bill would impose a state-mandated local program. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because certain of the above-described provisions would be part of the act and a violation of a PUC action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for specified reasons.
Who sponsors AB 2239?
AB 2239 is sponsored by Carrillo, Juan (Democratic).
What is the current status of AB 2239?
This bill has been introduced in the Assembly. Introduced February 19, 2026. It must pass committee before a floor vote.
Where can I track AB 2239?
Track AB 2239 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 2239

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 2239

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →