Minnesota 2025 Regular Session Status: In Committee Sponsors 3 D

HF 2928 — Preapplication filings for large water appropriation projects required, permit application information for large water appropriation projects added, level of environmental review for data centers specified, data centers exempted from making financial contributions to an energy conservation and optimization plan, and other data center provisions modified.

Last action — Author added

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the House. Introduced March 27, 2025. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the House.

Summary

Preapplication filings for large water appropriation projects required, permit application information for large water appropriation projects added, level of environmental review for data centers specified, data centers exempted from making financial contributions to an energy conservation and optimization plan, and other data center provisions modified.

Bill Text

How this bill changes current law

1 change Share ↗

AI-generated reading aid from the bill's amendatory text — verify against the official bill.

  • Minnesota Statutes 2024, section 103G.265

    Subd. 5. Preapplication evaluation of large water appropriation projects. (a) This subdivision applies to a project whose proposed consumptive use exceeds 100 million gallons per year or 250,000 gallons per day, whether under an existing permit, as the result of a permit amendment, or under a new individual permit. (b) To ensure that a project is compatible with the needs of other current and future water users, to help maintain the water allocation priorities established under section 103G.261, to ensure adequate water supply in areas of the state with limited water availability, and to promote a more efficient and timely permitting process, potential applicants or persons working on behalf of potential applicants are encouraged to discuss the project with the department as early in the project development process as possible, preferably before a final project site has been selected, project design has been finalized, or land has been acquired. (c) A city or county employee that has been contacted by a person regarding a project that is likely to be subject to this subdivision must, even if no final decision has been made on the project's location, notify the department in writing within ten business days of the contact, providing the name of and contact information for the person, and potential project locations. (d) In response to a contact from a potential applicant, the department may request preapplication information that is helpful in assisting the department to assess the factors affecting the ability of a water source to meet a project's water use needs at proposed locations, including: (1) a project description, including all potential locations; (2) the project's estimated maximum daily, seasonal, and annual water use rates and volumes; (3) the anticipated source of water; and (4) water quality or temperature requirements. The department may request any additional information necessary to assist it to assess the ability of a water source to meet a project's water use needs.

    This addition establishes a preapplication evaluation process for large water appropriation projects that exceed specified consumption thresholds.

Action History

  1. Author added

  2. Author added

  3. Introduction and first reading, referred to Energy Finance and Policy

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 2 co-sponsors · 200 not signed on

Sponsors (1)

Co-sponsors (2)

Not signed on (200)

200 members have not signed on to this bill.

Show all 200 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HF 2928 do?
Preapplication filings for large water appropriation projects required, permit application information for large water appropriation projects added, level of environmental review for data centers specified, data centers exempted from making financial contributions to an energy conservation and optimization plan, and other data center provisions modified.
Who sponsors HF 2928?
HF 2928 is sponsored by Katie Jones (Democratic-Farmer-Labor), Kristi Pursell (Democratic-Farmer-Labor), and Patty Acomb (Democratic-Farmer-Labor).
What is the current status of HF 2928?
This bill is in committee in the House. Introduced March 27, 2025. It must pass committee before a floor vote.
Where can I track HF 2928?
Track HF 2928 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HF 2928

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HF 2928

Last checked for changes 18 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →