SF 3852 — Certain users of large amounts of groundwater requirement to apply for their own water-use permit instead of modifying an existing municipal permit
Last action — Author added
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
Died in session
This bill died when the 2025 Regular Session adjourned sine die on May 18, 2026. It reached “Introduced” and never passed both chambers, so it can no longer move: a new version would have to be introduced in a later session.
This bill is no longer active: its legislative session adjourned sine die on May 18, 2026, so there is no live prognosis. It would have to be introduced again in a later session to move.
Summary
Relating to environment; requiring certain users of large amounts of groundwater to apply for their own water-use permit instead of modifying an existing municipal permit.
In the bill's own words, from its opening clause.
Bill Text
- Introduced Introduction Current html February 23, 2026
AI-generated reading aid from the bill's amendatory text — verify against the official bill.
The bill requires certain large water users to apply for their own permits rather than modifying existing municipal permits.
-
Minnesota Statutes 2025 Supplement, section 103G.271, subdivision 5b
deleted text begin (b) The commissioner shall require an applicant to conduct an aquifer test as provided under section 103G.287, if the commissioner determines that the test results are necessary in order to ensure compliance with paragraph (a), clause (1). deleted text end→ new text begin (b) A user that proposes a new or modified water use permit for a new or additional industrial or commercial consumptive use must apply for its own water-use permit and may not rely on the modification of a municipal permit if the new or additional use will: new text endThis change establishes that large water users must obtain individual permits regardless of municipal permits.
-
Minnesota Statutes 2025 Supplement, section 103G.271, subdivision 5b
new text begin (1) exceed 100,000,000 gallons per year; or new text end
This addition specifies a threshold for when a new user must apply for their own permit.
-
Minnesota Statutes 2025 Supplement, section 103G.271, subdivision 5b
new text begin (2) exceed an amount equal to 50 percent or more of a municipality's current authorized annual appropriation volume. new text end
This addition further clarifies another condition that mandates individual permit applications for large water users.
-
Minnesota Statutes 2025 Supplement, section 103G.271, subdivision 5b
new text begin (c) Before issuing a permit under this section, the commissioner must: new text end
This new requirement establishes a process for permitting that includes public notice and commentary.
-
Minnesota Statutes 2025 Supplement, section 103G.271, subdivision 5b
new text begin (1) prepare a draft permit and provide a notice and comment period. The commissioner must: new text end
This addition mandates a public consultation process before permits are issued.
-
Minnesota Statutes 2025 Supplement, section 103G.271, subdivision 5b
new text begin (2) conduct an aquifer test as provided under section 103G.287, if the commissioner determines that the test results are necessary to ensure that public health, safety, and welfare are adequately protected. When an aquifer test is conducted under this clause, the results of the test must be included and considered in any environmental review process under chapter 116D that is related to the permit. new text end
This addition ensures aquifer tests are conducted and results are integrated into environmental reviews.
-
Minnesota Statutes 2024, section 103G.281, subdivision 3
deleted text begin annually deleted text end on or before February 15 of the following year deleted text begin on forms provided by the commissionerdeleted text end.→ new text begin annually on or before February 15 of the following year new text endThis change updates the reporting requirements for water usage to streamline compliance.
Action History
-
Author added
-
Referred to Environment, Climate, and Legacy
-
Introduction and first reading
Sponsors
- Johnson Stewart · Primary
- Mary K. Kunesh · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 1 co-sponsors · 235 not signed on
Sponsors (1)
Co-sponsors (1)
- Mary K. Kunesh Democratic-Farmer-Labor
Not signed on (235)
235 members have not signed on to this bill.
Show all 235 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
- Senate Environment, Climate, and Legacy Referred February 26, 2026
Frequently asked questions
- What does SF 3852 do?
- Relating to environment; requiring certain users of large amounts of groundwater to apply for their own water-use permit instead of modifying an existing municipal permit.
- Who sponsors SF 3852?
- SF 3852 is sponsored by Johnson Stewart and Mary K. Kunesh (Democratic-Farmer-Labor).
- What is the current status of SF 3852?
- This bill died when the 2025 Regular Session adjourned sine die on May 18, 2026. It reached “Introduced” and never passed both chambers, so it can no longer move: a new version would have to be introduced in a later session.
- Where can I track SF 3852?
- Track SF 3852 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SF 3852
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SF 3852
Last checked for changes 22 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →