Pennsylvania 2025_0 Regular Session Status: In Committee Sponsors 4 D

HB 2791 — An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in service and facilities, providing for high-voltage transmission lines.

Last action — Referred to ENERGY, Sept. 23, 2026

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the House. Introduced September 23, 2026. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the House.

In plain language

The bill provides a framework for siting high-voltage transmission lines along state highway corridors.

This legislation outlines priorities and procedures for placing high-voltage transmission lines in Pennsylvania, favoring existing and highway corridors first. It requires the Department of Transportation to approve permits for such installations and allows for modifications if denied.

What this means for you
  • Small Business: Small businesses may benefit from improved infrastructure related to high-voltage power distribution.

Summary

Co-location of high voltage transmission lines along state highway right-of-ways

Bill Text

How this bill changes current law

1 change Share ↗

AI-generated reading aid from the bill's amendatory text — verify against the official bill.

This bill adds provisions regarding the siting, permitting, and construction of high-voltage transmission lines to the Pennsylvania Consolidated Statutes.

  • Title 66

    § 1513. High-voltage transmission lines. (a) Consideration of corridors.-- (1) An entity responsible for siting a new electric transmission facility, including a high-voltage transmission line, shall consider corridors in the following order of priority: (i) Existing utility corridors. (ii) Highway corridors. (iii) New corridors. (2) When reviewing a siting application filed under 52 Pa. Code Ch. 57 Subch. G (relating to commission review of siting and construction of electric transmission lines) or a letter of notification in lieu of application filed with the commission under 52 Pa. Code Ch. 57 (relating to electric service), the commission shall consider whether the applicant meets its obligations under paragraph (1) to the greatest extent feasible and consistent with economic and engineering considerations, reliability of the electric system, protection of the environment and the rights of private property owners. (b) Permit.--An electric distribution company or developer may apply for a permit from the department to construct, place or maintain a high-voltage transmission line within a State-owned public right-of-way or along any State-owned highway, federally aided State highway, controlled access highway, interstate highway or roadway. (c) Approval.--The department shall approve a permit application under subsection (b) if the application meets the requirements of this section unless the department denies the application under subsection (d). (d) Denial.--The department may deny a permit application if the department determines that the denial is necessary to protect public safety or ensure the proper functioning of the highway. (e) Reasons for denial.--If the department denies an application, the department shall provide the reasons for the denial to the electric distribution company or developer and post the reasons on the department's publicly accessible Internet website. Within 90 days of the denial, the department shall submit the reasons for the denial to all of the following for review: (1) The Secretary of Transportation. (2) The commission. (3) The chairperson and minority chairperson of the Environmental Resources and Energy Committee of the Senate. (4) The chairperson and minority chairperson of the Energy Committee of the House of Representatives. (5) The chairperson and minority chairperson of the Transportation Committee of the Senate. (6) The chairperson and minority chairperson of the Transportation Committee of the House of Representatives. (f) Process.--If the department denies a permit application, the electric distribution company or developer may modify and resubmit the application for consideration by the department under this section. (g) Coordinated activities.--Upon written request, the department shall coordinate with an electric distribution company or developer to review requested highway corridors for possible locations at which high-voltage transmission lines may be permitted. (h) Information on future projects.--In connection with coordination under subsection (g), the department shall share with the requesting electric distribution company or developer all known plans for potential future projects that could affect the placement of a high-voltage transmission line. (i) Constructability.--If the department and an electric distribution company or developer identify a route for which a permit may be issued, the electric distribution company or developer shall prepare a constructability report in consultation with the department. The report shall include the terms and conditions for constructing the transmission project in the highway right-of-way. The department and the electric distribution company or developer shall approve the report before the department issues the permit. (j) Commission authority.--Nothing in this section shall be construed to limit or otherwise affect the authority of the commission under this title. (k) Definitions.--As used in this section, the following words and phrases shall have the meanings given to them in this subsection unless the context clearly indicates otherwise: "Department." The Department of Transportation of the Commonwealth. "Developer." A person that develops a high-voltage transmission line project. "Electric distribution company." As defined in section 2803 (relating to definitions).

    This addition establishes a framework for evaluating high-voltage transmission line siting, permitting, and construction processes.

Action History

  1. Referred to ENERGY, Sept. 23, 2026

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 3 co-sponsors · 249 not signed on

Sponsors (1)

Co-sponsors (3)

Not signed on (249)

249 members have not signed on to this bill.

Show all 249 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 2791 do?
Co-location of high voltage transmission lines along state highway right-of-ways
Who sponsors HB 2791?
HB 2791 is sponsored by Elizabeth Fiedler (Democratic), Dan K. Williams (Democratic), Manuel Guzman (Democratic), and Paul Takac (Democratic).
What is the current status of HB 2791?
This bill is in committee in the House. Introduced September 23, 2026. It must pass committee before a floor vote.
Where can I track HB 2791?
Track HB 2791 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 2791

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 2791

Last checked for changes about 1 month ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →