HB617 — Electric utilities; virtual power plant pilot program, Phase I Utilities.
Last action — Left in Labor and Commerce
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed House of Delegates
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill has been introduced in the House of Delegates. Introduced January 13, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
In plain language
The bill proposes a virtual power plant pilot program for electric utilities.
This measure aims to establish a pilot program for electric utilities to create virtual power plants. Details regarding specific obligations or provisions are not available.
Summary
Electric utilities; virtual power plant pilot program; Phase I Utilities. Requires Appalachian Power to petition the State Corporation Commission for approval to conduct a pilot program to evaluate methods to optimize demand through various technology applications, including the establishment of virtual power plants, by December 1, 2026. The bill requires the pilot program to evaluate electric grid capacity needs and the ability of such virtual power plants to provide grid services, including peak-shaving, during times of peak electric demand.
The summary published with the bill.
Bill Text
We don't have the full text on file for this bill yet.
Read HB617 on the official Virginia source →Compared against the Code of Virginia as published AI-generated reading aid — verify against the official bill.
This bill amends 1 section(s) of the Code of Virginia: 56-585.1:1.
-
56-585.1:1
A. As used in this
Inserts “A. As used in this”.
-
56-585.1:1
section
Inserts “section”.
-
56-585.1:1
:
Inserts “:”.
-
56-585.1:1
"Aggregator" means an individual or entity, other than the electric utility, that enrolls customers in the pilot program and coordinates the operation of enrolled energy resources. An aggregator shall not be considered an electric utility by virtue of participating in the pilot program but shall be given nondiscriminatory access to necessary customer and grid data from the utility to participate in the pilot program.
Inserts “"Aggregator" means an individual or entity, other than the electric utility, that enrolls customers in the pilot program and coordinates the operation of enrolled energy resources. An aggregator shall not be considered an electric utility by virtue of participating in the pilot program but shall be given nondiscriminatory access to necessary customer and grid data from the utility to participate in the pilot program.”.
-
56-585.1:1
"Distributed energy resource" means a resource of up to five megawatts that is located on the customer's premises or is interconnected with the distribution system and produces or stores electricity or modifies the timing or amount of a customer's electricity consumption.
Inserts “"Distributed energy resource" means a resource of up to five megawatts that is located on the customer's premises or is interconnected with the distribution system and produces or stores electricity or modifies the timing or amount of a customer's electricity consumption.”.
-
56-585.1:1
"Electric utility" means a Phase I Utility as de
Inserts “"Electric utility" means a Phase I Utility as de”.
-
56-585.1:1
scr
Inserts “scr”.
-
56-585.1:1
i
Inserts “i”.
-
56-585.1:1
b
Inserts “b”.
-
56-585.1:1
ed in subdivision A 1 of § 56-585.1.
Inserts “ed in subdivision A 1 of § 56-585.1.”.
-
56-585.1:1
"Eligible technology" means a distributed energy resource that meets the requirements for participation in the pilot program and does not emit carbon dioxide as a byproduct of combusting fuel or manufacturing fuel for combustion to generate electricity.
Inserts “"Eligible technology" means a distributed energy resource that meets the requirements for participation in the pilot program and does not emit carbon dioxide as a byproduct of combusting fuel or manufacturing fuel for combustion to generate electricity.”.
-
56-585.1:1
"Grid event" means a grid condition for which the electric utility schedules or remotely dispatches enrolled devices to respond.
Inserts “"Grid event" means a grid condition for which the electric utility schedules or remotely dispatches enrolled devices to respond.”.
-
56-585.1:1
"Grid service" means a capacity, energy, or ancillary service that supports grid operations.
Inserts “"Grid service" means a capacity, energy, or ancillary service that supports grid operations.”.
-
56-585.1:1
"Historically economically disadvantaged community" has the same meaning as provided in § 56-576.
Inserts “"Historically economically disadvantaged community" has the same meaning as provided in § 56-576.”.
-
56-585.1:1
"Virtual power plant" means an aggregation of distributed energy resources, enrolled either directly with an electric utility or indirectly through an aggregator, that are operated in coordination to provide one or more grid services.
Inserts “"Virtual power plant" means an aggregation of distributed energy resources, enrolled either directly with an electric utility or indirectly through an aggregator, that are operated in coordination to provide one or more grid services.”.
-
56-585.1:1
B. No later than December 1, 202
Inserts “B. No later than December 1, 202”.
-
56-585.1:1
6
Inserts “6”.
-
56-585.1:1
, each Phase I Utility shall petition the State Corporation Commission (the Commission) for approval to conduct a pilot program to evaluate methods to optimize demand through various technology applications including the establishment of virtual power plants. Such pilot program shall evaluate electric grid capacity needs and the ability of such virtual power plants to provide grid services, including peak-shaving, during times of peak electric demand. Such pilot program shall consist of aggregations of distributed energy resources totaling up to
Inserts “, each Phase I Utility shall petition the State Corporation Commission (the Commission) for approval to conduct a pilot program to evaluate methods to optimize demand through various technology applications including the establishment of virtual power plants. Such pilot program shall evaluate electric grid capacity needs and the ability of such virtual power plants to provide grid services, including peak-shaving, during times of peak electric demand. Such pilot program shall consist of aggregations of distributed energy resources totaling up to”.
-
56-585.1:1
1
Inserts “1”.
-
56-585.1:1
50 megawatts for a Phase I Utility and shall include distributed energy resources located in multiple geographic regions of the Commonwealth. An electric utility may utilize any existing or proposed distributed energy programs as part of the pilot program and to further the development of virtual power plants in the Commonwealth. An electric utility that petitions the Commission for such pilot program shall demonstrate that the utility has evaluated funding opportunities from the
Inserts “50 megawatts for a Phase I Utility and shall include distributed energy resources located in multiple geographic regions of the Commonwealth. An electric utility may utilize any existing or proposed distributed energy programs as part of the pilot program and to further the development of virtual power plants in the Commonwealth. An electric utility that petitions the Commission for such pilot program shall demonstrate that the utility has evaluated funding opportunities from the”.
-
56-585.1:1
federal government
Inserts “federal government”.
-
56-585.1:1
. In furthering the goals of such pilot program, the electric utility shall propose programs of at least 5 megawatts incentivizing residential customers to purchase battery storage devices
Inserts “. In furthering the goals of such pilot program, the electric utility shall propose programs of at least 5 megawatts incentivizing residential customers to purchase battery storage devices”.
-
56-585.1:1
,
Inserts “,”.
-
56-585.1:1
and the Commission may require competitive solicitation open to utility-owned and non-utility-owned resources.
Inserts “and the Commission may require competitive solicitation open to utility-owned and non-utility-owned resources.”.
-
56-585.1:1
C. In conducting such pilot program, the electric utility shall evaluate methods to holistically optimize demand, including
Inserts “C. In conducting such pilot program, the electric utility shall evaluate methods to holistically optimize demand, including”.
-
56-585.1:1
(i)
Inserts “(i)”.
-
56-585.1:1
a stakeholder process to receive feedback on program design;
Inserts “a stakeholder process to receive feedback on program design;”.
-
56-585.1:1
(ii)
Inserts “(ii)”.
-
56-585.1:1
a review of reasonable enrollment and performance incentives for participating customers;
Inserts “a review of reasonable enrollment and performance incentives for participating customers;”.
-
56-585.1:1
(iii)
Inserts “(iii)”.
-
56-585.1:1
potential incentives for the purchase of a battery storage device, including increased incentives for customers in historically economically disadvantaged communities;
Inserts “potential incentives for the purchase of a battery storage device, including increased incentives for customers in historically economically disadvantaged communities;”.
-
56-585.1:1
(iv)
Inserts “(iv)”.
-
56-585.1:1
operational parameters for grid services, including the annual maximum number of grid events, the maximum duration of such grid events, and conditions under which a participating customer may opt out of a grid event;
Inserts “operational parameters for grid services, including the annual maximum number of grid events, the maximum duration of such grid events, and conditions under which a participating customer may opt out of a grid event;”.
-
56-585.1:1
(v)
Inserts “(v)”.
-
56-585.1:1
reasonable mechanisms to disenroll customers for nonperformance; and
Inserts “reasonable mechanisms to disenroll customers for nonperformance; and”.
-
56-585.1:1
(vi)
Inserts “(vi)”.
-
56-585.1:1
preliminary development of a program tariff that is designed to (a) allow customers with technologies, including battery storage, non-battery storage, smart thermostat, or managed electric vehicle charging technologies, to enroll their eligible technologies in the pilot program; (b) provide a mechanism to incorporate existing programs, including smart thermostat demand response, electric vehicle charging programs, and battery storage programs, into such tariff; (c) specify compensable grid services for each eligible technology, including peak demand reduction, voltage support, and emergency services; and (d) specify pay-for-performance compensation mechanisms for such grid services.
Inserts “preliminary development of a program tariff that is designed to (a) allow customers with technologies, including battery storage, non-battery storage, smart thermostat, or managed electric vehicle charging technologies, to enroll their eligible technologies in the pilot program; (b) provide a mechanism to incorporate existing programs, including smart thermostat demand response, electric vehicle charging programs, and battery storage programs, into such tariff; (c) specify compensable grid services for each eligible technology, including peak demand reduction, voltage support, and emergency services; and (d) specify pay-for-performance compensation mechanisms for such grid services.”.
-
56-585.1:1
D. No later than November 15, 202
Inserts “D. No later than November 15, 202”.
-
56-585.1:1
7
Inserts “7”.
-
56-585.1:1
, the electric utility shall petition the Commission for a program tariff or variations of a tariff structure through which residential and commercial and industrial customers may enroll, either directly or through an aggregator.
Inserts “, the electric utility shall petition the Commission for a program tariff or variations of a tariff structure through which residential and commercial and industrial customers may enroll, either directly or through an aggregator.”.
Action History
-
H Left in Labor and Commerce
-
H Fiscal Impact Statement from State Corporation Commission (HB617)
-
H Placed on Labor and Commerce Agenda
-
H Assigned HCL sub: Subcommittee #3
-
H Subcommittee recommends laying on the table (5-Y 2-N)
-
H Placed on Labor and Commerce Agenda
-
H Placed on Labor and Commerce Agenda
-
H Referred to Committee on Labor and Commerce
-
H Prefiled and ordered printed; Offered 01-14-2026 26103496D
Sponsors
- Joseph P. McNamara · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 147 not signed on · 2 voted No
Sponsors (1)
- Joseph P. McNamara Republican
Co-sponsors (0)
None.
Not signed on (147)
147 members have not signed on to this bill.
Show all 147 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
Subcommittee
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Republican | 0 | 2 | 0 | 1 |
| Democratic | 5 | 0 | 0 | 1 |
| Total | 5 | 2 | 0 | 2 |
| % of votes cast | 56% | 22% | 0% | 22% |
How each member voted (9)
| Member | Party | Vote |
|---|---|---|
| Bonita G. Anthony | Democratic | Not Voting |
| Irene Shin | Democratic | Yea |
| May Nivar | Democratic | Yea |
| Michael B. Feggans | Democratic | Yea |
| Nadarius E. Clark | Democratic | Yea |
| Richard C. "Rip" Sullivan, Jr. | Democratic | Yea |
| Terry G. Kilgore | Republican | Nay |
| Tony O. Wilt | Republican | Nay |
| Wren M. Williams | Republican | Not Voting |
Committees
- House of Delegates House Labor and Commerce Referred January 13, 2026
Frequently asked questions
- What does HB617 do?
- Electric utilities; virtual power plant pilot program; Phase I Utilities. Requires Appalachian Power to petition the State Corporation Commission for approval to conduct a pilot program to evaluate methods to optimize demand through various technology applications, including the establishment of virtual power plants, by December 1, 2026. The bill requires the pilot program to evaluate electric grid capacity needs and the ability of such virtual power plants to provide grid services, including peak-shaving, during times of peak electric demand.
- Who sponsors HB617?
- HB617 is sponsored by Joseph P. McNamara (Republican).
- What is the current status of HB617?
- This bill has been introduced in the House of Delegates. Introduced January 13, 2026. It must pass committee before a floor vote.
- Where can I track HB617?
- Track HB617 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB617
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB617
Last checked for changes 5 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →