S 1811 — Water Resources Development Act of 2020
Last action — Message on House action received in Senate and at desk: House amendments to Senate bill.
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed Senate
-
✓Passed House
-
Died in session
This bill died with 116th Congress. It reached “Passed House” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Water Resources Development Act of 2020 This bill addresses water resources infrastructure funding as well as Army Corps of Engineers projects for navigation, flood risk management, and ecosystem restoration. The bill removes from annual discretionary spending limits funds appropriated from the Harbor Maintenance Trust Fund (HMTF) for harbor operations and maintenance purposes, up to a specified amount. This allows additional funds from the HMTF to be appropriated for these purposes without these amounts counting against annual discretionary spending limits. Similarly, the bill removes from annual discretionary spending limits in FY2021-FY2030 funds appropriated for harbor maintenance activities at certain donor ports or energy transfer ports, up to a specified amount. Further, the bill expands the eligible uses of HMTF funds to include maintenance dredging at certain emerging harbors. In addition, the bill modifies cost-sharing requirements for the construction of inland waterway navigation projects. The bill also establishes various pilot programs to address issues including flood risk management and hurricane and storm damage risk reduction in rural or economically disadvantaged communities. Additionally, the bill establishes programs for controlling certain invasive species. The bill also creates a process to deauthorize certain projects that are no longer viable for construction and authorizes new projects for purposes including navigation, flood risk management, and ecosystem restoration.
Bill Text
What changed in the latest version
8027 added · 68 removedPlain-language change summary
The changes made to the bill S. 1811 include the addition of a new short title and table of contents, while removing previous references to a specific pilot program and amendments to various sections relating to water resources. The text now details sections on budgetary treatment for the Harbor Maintenance Trust Fund, appropriations for navigation, and construction projects by non-Federal interests. This shift establishes a clearer framework for managing water resources development, expanding the scope of authorized actions and reporting requirements.
1811 ReferredEngrossed inAmendment House (RFH)](EAH)] <DOC> 116thIn CONGRESSthe 1stHouse Sessionof S.Representatives, U.
1811S., _______________________________________________________________________December IN8, THE2020. HOUSE OF REPRESENTATIVES July 11, 2019 Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned _______________________________________________________________________ AN ACT To make technical corrections to the America's Water Infrastructure Act of 2018, and for other purposes.
BeResolved, itThat enacted by the Senatebill andfrom House of Representatives of the UnitedSenate States(S. of America in Congress assembled, SECTION 1.
NON-FEDERAL1811) IMPLEMENTATIONentitled PILOT``An PROGRAM.Act to make technical corrections to the America's Water Infrastructure Act of 2018, and for other purposes.'', do pass with the following AMENDMENTS:
SectionStrike 1043(b)(7)out ofall after the Waterenacting Resourcesclause Reform and Developmentinsert: Act of 2014 (33 U.S.C.
2201SECTION note)1. is amended by striking ``5 years'' and inserting ``10 years''.
SHORT TITLE;
TABLE OF CONTENTS.
(a) Short Title.--This Act may be cited as the ``Water Resources Development Act of 2020''.
(b) Table of Contents.--The table of contents for this Act is as follows:
Sec.
1.
Short title;
table of contents.
Sec.
2.
Secretary defined.
TITLE I--GENERAL PROVISIONS Sec.
101.
Budgetary treatment expansion and adjustment for the Harbor Maintenance Trust Fund.
Sec.
102.
Authorization of appropriations for navigation.
Sec.
103.
Annual report to Congress on the Harbor Maintenance Trust Fund.
Sec.
104.
Additional measures at donor ports and energy transfer ports.
Sec.
105.
Construction of water resources development projects by non- Federal interests.
Sec.
106.
Coast Guard anchorages.
Sec.
107.
State contribution of funds for certain operation and maintenance costs.
Sec.
108.
Show all 500 changed lines (460 more)
Great Lakes confined disposal facilities.
Sec.
109.
Inland waterway projects.
Sec.
110.
Implementation of water resources principles and requirements.
Sec.
111.
Resiliency planning assistance.
Sec.
112.
Project consultation.
Sec.
113.
Review of resiliency assessments.
Sec.
114.
Small flood control projects.
Sec.
115.
Flood Protection Projects.
Sec.
116.
Feasibility studies;
review of natural and nature-based features.
Sec.
117.
Federal interest determination.
Sec.
118.
Pilot programs on the formulation of Corps of Engineers projects in rural communities and economically disadvantaged communities.
Sec.
119.
Permanent measures to reduce emergency flood fighting needs for communities subject to repetitive flooding.
Sec.
120.
Emergency response to natural disasters.
Sec.
121.
Cost and benefit feasibility assessment.
Sec.
122.
Expediting repairs and recovery from flooding.
Sec.
123.
Review of Corps of Engineers assets.
Sec.
124.
Sense of Congress on multipurpose projects.
Sec.
125.
Beneficial use of dredged material;
dredged material management plans.
Sec.
126.
Aquatic ecosystem restoration for anadromous fish.
Sec.
127.
Annual report to Congress on water resources infrastructure.
Sec.
128.
Harmful algal bloom demonstration program.
Sec.
129.
Missouri River interception-rearing complex construction.
Sec.
130.
Materials, services, and funds for repair, restoration, or rehabilitation of projects.
Sec.
131.
Levee safety.
Sec.
132.
National Dam Safety Program.
Sec.
133.
Rehabilitation of Corps of Engineers constructed pump stations.
Sec.
134.
Non-Federal Project Implementation Pilot Program.
Sec.
135.
Cost sharing provisions for territories and Indian Tribes.
Sec.
136.
Review of contracting policies.
Sec.
137.
Criteria for funding environmental infrastructure projects.
Sec.
138.
Aging infrastructure.
Sec.
139.
Uniformity of notification systems.
Sec.
140.
Coastal storm damage reduction contracts.
Sec.
141.
Dam remediation for ecosystem restoration.
Sec.
142.
Levee accreditation process;
levee certifications.
Sec.
143.
Project partnership agreement.
Sec.
144.
Acceptance of funds for harbor dredging.
Sec.
145.
Replacement capacity.
Sec.
146.
Reviewing hydropower at Corps of Engineers facilities.
Sec.
147.
Repair and restoration of embankments.
Sec.
148.
Coastal mapping.
Sec.
149.
Interim risk reduction measures.
Sec.
150.
Maintenance dredging permits.
Sec.
151.
High water-low water preparedness.
Sec.
152.
Treatment of certain benefits and costs.
Sec.
153.
Lease deviations.
Sec.
154.
Sense of Congress on Arctic deep draft port development.
Sec.
155.
Small water storage projects.
Sec.
156.
Planning Assistance to States.
Sec.
157.
Forecast-informed reservoir operations.
Sec.
158.
Data for water allocation, supply, and demand.
Sec.
159.
Inland waterways pilot program.
Sec.
160.
Definition of economically disadvantaged community.
Sec.
161.
Studies of water resources development projects by non- Federal interests.
Sec.
162.
Leveraging Federal infrastructure for increased water supply.
Sec.
163.
Sense of Congress on removal of unauthorized, manmade, flammable materials on Corps property.
Sec.
164.
Enhanced development program.
Sec.
165.
Continuing authority programs.
TITLE II--STUDIES AND REPORTS Sec.
201.
Authorization of proposed feasibility studies.
Sec.
202.
Expedited completions.
Sec.
203.
Expedited modifications of existing feasibility studies.
Sec.
204.
Assistance to non-Federal sponsors;
feasibility analysis.
Sec.
205.
Selma, Alabama.
Sec.
206.
Report on Corps of Engineers facilities in Appalachia.
Sec.
207.
Additional studies under North Atlantic Coast Comprehensive Study.
Sec.
208.
South Atlantic coastal study.
Sec.
209.
Comprehensive study of the Sacramento River, Yolo Bypass, California.
Sec.
210.
Lake Okeechobee regulation schedule, Florida.
Sec.
211.
Great Lakes coastal resiliency study.
Sec.
212.
Report on the status of restoration in the Louisiana coastal area.
Sec.
213.
Lower Mississippi River comprehensive management study.
Sec.
214.
Upper Mississippi River Comprehensive Plan.
Sec.
215.
Upper Missouri River Basin mainstem dam fish loss research.
Sec.
216.
Lower and Upper Missouri River Comprehensive Flood Protection.
Sec.
217.
Portsmouth Harbor and Piscataqua River and Rye Harbor, New Hampshire.
Sec.
218.
Cougar and Detroit Dams, Willamette River Basin, Oregon.
Sec.
219.
Port Orford, Oregon.
Sec.
220.
Wilson Creek and Sloan Creek, Fairview, Texas.
Sec.
221.
Study on water supply and water conservation at water resources development projects.
Sec.
222.
Report to Congress on authorized studies and projects.
Sec.
223.
Completion of reports and materials.
Sec.
224.
Emergency flooding protection for lakes.
Sec.
225.
Report on debris removal.
Sec.
226.
Report on antecedent hydrologic conditions.
Sec.
227.
Subsurface drain systems research and development.
Sec.
228.
Report on corrosion prevention activities.
Sec.
229.
Annual reporting on dissemination of information.
Sec.
230.
Report on benefits calculation for flood control structures.
TITLE III--DEAUTHORIZATIONS AND MODIFICATIONS Sec.
301.
Deauthorization of inactive projects.
Sec.
302.
Abandoned and inactive noncoal mine restoration.
Sec.
303.
Tribal partnership program.
Sec.
304.
Lakes program.
Sec.
305.
Rehabilitation of Corps of Engineers constructed dams.
Sec.
306.
Chesapeake Bay Environmental Restoration and Protection Program.
Sec.
307.
Upper Mississippi River System Environmental Management Program.
Sec.
308.
Upper Mississippi River protection.
Sec.
309.
Theodore Ship Channel, Mobile, Alabama.
Sec.
310.
McClellan-Kerr Arkansas River Navigation System.
Sec.
311.
Ouachita and Black Rivers, Arkansas and Louisiana.
Sec.
312.
Lake Isabella, California.
Sec.
313.
Lower San Joaquin River flood control project.
Sec.
314.
Sacramento River, Glenn-Colusa, California.
Sec.
315.
San Diego River and Mission Bay, San Diego County, California.
Sec.
316.
San Francisco, California, Waterfront Area.
Sec.
317.
Western Pacific Interceptor Canal, Sacramento River, California.
Sec.
318.
Rio Grande Environmental Management Program, Colorado, New Mexico, and Texas.
Sec.
319.
New London Harbor Waterfront Channel, Connecticut.
Sec.
320.
Wilmington Harbor, Delaware.
Sec.
321.
Wilmington Harbor South Disposal Area, Delaware.
Sec.
322.
Washington Harbor, District of Columbia.
Sec.
323.
Big Cypress Seminole Indian Reservation Water Conservation Plan, Florida.
Sec.
324.
Central Everglades, Florida.
Sec.
325.
Miami River, Florida.
Sec.
326.
Julian Keen, Jr.
Lock and Dam, Moore Haven, Florida.
Sec.
327.
Taylor Creek Reservoir and Levee L-73 (Section 1), Upper St.
Johns River Basin, Florida.
Sec.
328.
Extinguishment of flowage easements, Rough River Lake, Kentucky.
Sec.
329.
Calcasieu River and Pass, Louisiana.
Sec.
330.
Camden Harbor, Maine.
Sec.
331.
Cape Porpoise Harbor, Maine, anchorage area designation.
Sec.
332.
Baltimore, Maryland.
Sec.
333.
Thad Cochran Lock and Dam, Amory, Mississippi.
Sec.
334.
Missouri river reservoir sediment management.
Sec.
335.
Portsmouth, New Hampshire.
Sec.
336.
Rahway flood risk management feasibility study, New Jersey.
Sec.
337.
San Juan-Chama project;
Abiquiu Dam, New Mexico.
Sec.
338.
Flushing Bay and Creek Federal Navigation Channel, New York.
Sec.
339.
Rush River and Lower Branch Rush River, North Dakota.
Sec.
340.
Pawcatuck River, Little Narragansett Bay and Watch Hill Cove, Rhode Island and Connecticut.
Sec.
341.
Harris County, Texas.
Sec.
342.
Cap Sante Waterway, Washington.
Sec.
343.
Local government reservoir permit review.
Sec.
344.
Project modifications for improvement of environment.
Sec.
345.
Aquatic ecosystem restoration.
Sec.
346.
Surplus water contracts and water storage agreements.
Sec.
347.
No wake zones in navigation channels.
Sec.
348.
Limitation on contract execution in the Arkansas River Basin.
Sec.
349.
Waiver of non-Federal share of damages related to certain contract claims.
Sec.
350.
Reduced pricing for certain water supply storage.
Sec.
351.
Flood control and other purposes.
Sec.
352.
Additional assistance for critical projects.
Sec.
353.
Project modification authorizations.
Sec.
354.
Completion of maintenance and repair activities.
Sec.
355.
Project reauthorizations.
Sec.
356.
Conveyances.
Sec.
357.
Lake Eufaula advisory committee.
Sec.
358.
Repeal of Missouri River Task Force, North Dakota.
Sec.
359.
Repeal of Missouri River Task Force, South Dakota.
Sec.
360.
Conforming amendments.
TITLE IV--WATER RESOURCES INFRASTRUCTURE Sec.
401.
Project authorizations.
Sec.
402.
Special rules.
Sec.
403.
Authorization of projects based on feasibility studies prepared by non-Federal interests.
TITLE V--OTHER MATTERS Sec.
501.
Show all 500 changed rows (460 more)
View plain text versions (4)
- Engrossed Amendment Engrossed Amendment House Current html December 08, 2020
- Referred in House View text html July 11, 2019
- Engrossed Engrossed in Senate html July 10, 2019
- Introduced Introduced in Senate html June 12, 2019
Sections of law this bill changes
39 sections in 15 lawsFrom the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).
Emergency powers to eliminate budget deficits · 2 U.S.C. ch. 20 1 section
-
§ 901 Enforcing discretionary spending limits Amends
2 U.S.C. § 901 — at 901(b)(2)
The law today
(a) Enforcement (1) Sequestration Within 15 calendar days after Congress adjourns to end a session there shall be a sequestration to eliminate a budget-year breach, if any, within any category. (2) Eliminating a breach Each non-exempt account within a category shall be reduced by a dollar amount calculated by multiplying the enacted level of sequestrable budgetary resources in that account at that time by the uniform percentage necessary to eliminate a breach within that category. (3) Military personnel If the President uses the authority to exempt any personnel account from sequestration under section 905(f) of this title, each account within subfunctional category 051 (other than those military personnel accounts for which the authority provided under section 905(f) of this title has been exercised) shall be further reduced by a dollar amount calculated by multiplying the enacted level of non-exempt budgetary resources in that account at that time by the uniform percentage necessary to offset the total dollar amount by which outlays are not reduced in military personnel accounts by reason of the use of such authority. (4) Part-year appropriations If, on the date specified in paragraph (1), there is in effect an Act making or continuing appropriations for part of a fiscal year for any budget account, then the dollar sequestration calculated for that account under paragraphs (2) and (3) shall be subtracted from— (A) the annualized amount otherwise available by law in that account under that or a subsequent part-year appropriation; and (B) when a full-year appropriation for that account is enacted, from the amount otherwise provided by the full-year appropriation for that account. (5) Look-back If, after June 30, an appropriation for the fiscal year in progress is enacted that causes a breach within a category for that year (after taking into account any sequestration of amounts within that category), the discretionary spending limits for that category for the next fiscal year shall be reduced by the amount or amounts of that breach. (6) Within-session sequestration If an appropriation for a fiscal year in progress is enacted (after Congress adjourns to end the session for that budget year and before July 1 of that fiscal year) that causes a breach within a category for that year (after taking into account any prior sequestration of amounts within that category), 15 days later there shall be a sequestration to eliminate that breach within that category following the procedures set forth in paragraphs (2) through (4). (7) Estimates (A) CBO estimates As soon as practicable after Congress completes action on any discretionary appropriation, CBO, after consultation with the Committees on the Budget of the House of Representatives and the Senate, shall provide OMB with an estimate of the amount of discretionary new budget authority and outlays for the current year, if any, and the budget year provided by that legislation. (B) OMB estimates and explanation of differences Not later than 7 calendar days (excluding Saturdays, Sundays, and legal holidays) after the date of enactment of any discretionary appropriation, OMB shall transmit a report to the House of Representatives and to the Senate containing both the CBO and OMB estimates of the amount of discretionary new budget authority for the current year, if any, and the budget year provided by that legislation, and an explanation of any difference between the 2 estimates. If during the preparation of the report OMB determines that there is a significant difference between OMB and CBO, OMB shall consult with the Committees on the Budget of the House of Representatives and the Senate regarding that difference and that consultation shall include, to the extent practicable, written communication to those committees that affords such committees the opportunity to comment before the issuance of the report. (C) Assumptions and guidelines OMB estimates under this paragraph shall be made u...120 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Pay rates and systems · 5 U.S.C. ch. 53 1 section
-
§ 5315 Positions at level IV Amends
5 U.S.C. § 5315
The law today
Level IV of the Executive Schedule applies to the following positions, for which the annual rate of basic pay shall be the rate determined with respect to such level under chapter 11 of title 2, as adjusted by section 5318 of this title: Deputy Administrator of General Services. Associate Administrator of the National Aeronautics and Space Administration. Assistant Administrators, Agency for International Development (6). Regional Assistant Administrators, Agency for International Development (4). Assistant Secretaries of Agriculture (3). Assistant Secretaries of Commerce (11). Assistant Secretaries of Defense (20). Assistant Secretaries of the Air Force (5). Assistant Secretaries of the Army (5). Assistant Secretaries of the Navy (4). Assistant Secretaries of Health and Human Services (6). Assistant Secretaries of the Interior (6). Assistant Attorneys General (11). Assistant Secretaries of Labor (10), one of whom shall be the Assistant Secretary of Labor for Veterans’ Employment and Training. Administrator, Wage and Hour Division, Department of Labor. Assistant Secretaries of State (24) and 4 other State Department officials to be appointed by the President, by and with the advice and consent of the Senate. Assistant Secretaries of the Treasury (10). Members, United States International Trade Commission (5). Assistant Secretaries of Education (10). General Counsel, Department of Education. Director of Civil Defense, Department of the Army. Deputy Director of the Office of Emergency Planning. Deputy Director of the Office of Science and Technology. Deputy Director of the Peace Corps. Assistant Directors of the Office of Management and Budget (3). General Counsel of the Department of Agriculture. General Counsel of the Department of Commerce. General Counsel of the Department of Defense. General Counsel of the Department of Health and Human Services. Solicitor of the Department of the Interior. Solicitor of the Department of Labor. General Counsel of the National Labor Relations Board. General Counsel of the Department of the Treasury. First Vice President of the Export-Import Bank of Washington. Members, Council of Economic Advisers. Members, Board of Directors of the Export-Import Bank of Washington. Members, Federal Communications Commission. Member, Board of Directors of the Federal Deposit Insurance Corporation. Directors, Federal Housing Finance Board. Members, Federal Energy Regulatory Commission. Members, Federal Trade Commission. Members, Surface Transportation Board. Members, National Labor Relations Board. Members, Securities and Exchange Commission. Members, Merit Systems Protection Board. Members, Federal Maritime Commission. Members, National Mediation Board. Members, Railroad Retirement Board. Director of Selective Service. Associate Director of the Federal Bureau of Investigation, Department of Justice. Members, Equal Employment Opportunity Commission (4). Director, Community Relations Service. Members, National Transportation Safety Board. General Counsel, Department of Transportation. Deputy Administrator, Federal Aviation Administration. Assistant Secretaries of Transportation (5). Deputy Federal Highway Administrator. Administrator of the Great Lakes St. Lawrence Seaway Development Corporation. Assistant Secretary for Science, Smithsonian Institution. Assistant Secretary for History and Art, Smithsonian Institution. Deputy Administrator of the Small Business Administration. Assistant Secretaries of Housing and Urban Development (8). General Counsel of the Department of Housing and Urban Development. Commissioner of Interama. Federal Insurance Administrator, Federal Emergency Management Agency. Members, National Credit Union Administration Board (2). Members, Postal Regulatory Commission (4). Members, Occupational Safety and Health Review Commission. Deputy Under Secretaries of the Treasury (or Assistant Secretaries of the Treasury) (2). Members, Consumer Product Safety Commission (4). Members, Commodity F...168 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Shipping · 18 U.S.C. ch. 111 1 section
-
§ 2282B Violence against aids to maritime navigation Amends
18 U.S.C. § 2282B
The law today
Whoever intentionally destroys, seriously damages, alters, moves, or tampers with any aid to maritime navigation maintained by the Great Lakes St. Lawrence Seaway Development Corporation under the authority of section 4 of the Act of May 13, 1954 (33 U.S.C. 984), by the Coast Guard pursuant to section 81 1 of title 14, United States Code, or lawfully maintained under authority granted by the Coast Guard pursuant to section 83 of title 14, United States Code, if such act endangers or is likely to endanger the safe navigation of a ship, shall be fined under this title or imprisoned for not more than 20 years, or both.3 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Trust fund code · 26 U.S.C. ch. 98 1 section
-
§ 9505 Harbor Maintenance Trust Fund Amends
26 U.S.C. § 9505 — at 9505(a)(2)
The law today
(a) Creation of Trust Fund There is hereby established in the Treasury of the United States a trust fund to be known as the “Harbor Maintenance Trust Fund”, consisting of such amounts as may be— (1) appropriated to the Harbor Maintenance Trust Fund as provided in this section, (2) transferred to the Harbor Maintenance Trust Fund by the Great Lakes St. Lawrence Seaway Development Corporation pursuant to section 13(a) of the Act of May 13, 1954, or (3) credited to the Harbor Maintenance Trust Fund as provided in section 9602(b). (b) Transfer to Harbor Maintenance Trust Fund of amounts equivalent to certain taxes There are hereby appropriated to the Harbor Maintenance Trust Fund amounts equivalent to the taxes received in the Treasury under section 4461 (relating to harbor maintenance tax). (c) Expenditures from Harbor Maintenance Trust Fund Amounts in the Harbor Maintenance Trust Fund shall be available, as provided by appropriation Acts, for making expenditures— (1) to carry out section 210 of the Water Resources Development Act of 1986, (2) for payments of rebates of tolls or charges pursuant to section 13(b) of the Act of May 13, 1954 (as in effect on April 1, 1987), and (3) for the payment of all expenses of administration incurred by the Department of the Treasury, the Army Corps of Engineers, and the Department of Commerce related to the administration of subchapter A of chapter 36 (relating to harbor maintenance tax), but not in excess of $5,000,000 for any fiscal year.11 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Government corporations · 31 U.S.C. ch. 91 1 section
-
§ 9101 Definitions Amends
31 U.S.C. § 9101 — at 9101(3)(K)
The law today
In this chapter— (1) “Government corporation” means a mixed-ownership Government corporation and a wholly owned Government corporation. (2) “mixed-ownership Government corporation” means— (A) the Central Bank for Cooperatives. (B) the Federal Deposit Insurance Corporation. (C) the Federal Home Loan Banks. (D) the Federal Intermediate Credit Banks. (E) the Federal Land Banks. (F) the National Credit Union Administration Central Liquidity Facility. (G) the Regional Banks for Cooperatives. (H) the Financing Corporation. (I) the Resolution Trust Corporation. (J) the Resolution Funding Corporation. (3) “wholly owned Government corporation” means— (A) the Commodity Credit Corporation. (B) the Community Development Financial Institutions Fund. (C) the Export-Import Bank of the United States. (D) the Federal Crop Insurance Corporation. (E) Federal Prison Industries, Incorporated. (F) the Corporation for National and Community Service. (G) the Government National Mortgage Association. (H) the United States International Development Finance Corporation. (I) the Pennsylvania Avenue Development Corporation. (J) the Pension Benefit Guaranty Corporation. (K) the Great Lakes St. Lawrence Seaway Development Corporation. (L) the Secretary of Housing and Urban Development when carrying out duties and powers related to the Federal Housing Administration Fund. (M) the Tennessee Valley Authority. (N) the Panama Canal Commission. (O) the Millennium Challenge Corporation. (P) the International Clean Energy Foundation.57 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Navigable waters generally · 33 U.S.C. ch. 1 2 sections 1 repealed
-
§ 59h San Francisco, California, Waterfront Area Amends
33 U.S.C. § 59h
The law today
(a) Area to be declared nonnavigable The following area is declared to be nonnavigable waters of the United States: All of that portion of the City and County of San Francisco, California, lying shoreward of a line beginning at the intersection of the southerly right of way line of Earl Street prolongation with the Pierhead United States Government Pierhead line, the Pierhead line as defined in the State of California Harbor and Navigation Code Section 1770, as amended in 1961; thence northerly along said Pierhead line to its intersection with a line parallel with and distant 10 feet easterly from, the existing easterly boundary line of Pier 30–32; thence northerly along said parallel line and its northerly prolongation, to a point of intersection with a line parallel with, and distant 10 feet northerly from, the existing northerly boundary of Pier 30–32; thence westerly along last said parallel line to its intersection with said Pierhead line; thence northerly along said Pierhead line, to the intersection of the easterly right of way line of Van Ness Avenue, formerly Marlette Street, prolongation to the Pierhead line. (b) Requirement that area be improved The declaration of nonnavigability under subsection (a) applies only to those parts of the area described in subsection (a) that are or will be bulkheaded, filled, or otherwise occupied or covered by permanent structures and does not affect the applicability of any Federal statute or regulation that relates to filling of navigable waters or to other regulated activities within the area described in subsection (a), including sections 401 and 403 of this title, section 1344 of this title, and the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.]. (c) Inclusion of Embarcadero Historic District Congress finds and declares that the area described in subsection (a) contains the seawall, piers, and wharves that comprise the Embarcadero Historic District listed on the National Register of Historic Places on May 12, 2006.2 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 59h-1 Repealed. Pub. L. 116–260, div. AA, title III, § 316(b), Dec. 27, 2020, 134 Stat. 2706 Repeals
33 U.S.C. § 59h-1
This section is repealed in the current Code.
1 other bill also changes this section · Follow it → Official text at uscode.house.gov ↗
Protection of navigable waters and of harbor and river improvements generally · 33 U.S.C. ch. 9 2 sections
-
§ 467 Definitions Amends
33 U.S.C. § 467
The law today
In this subchapter, the following definitions apply: (1) Administrator The term “Administrator” means the Administrator of the Federal Emergency Management Agency. (2) Board The term “Board” means a National Dam Safety Review Board established under section 467f(f) of this title. (3) Dam The term “dam”— (A) means any artificial barrier that has the ability to impound water, wastewater, or any liquid-borne material, for the purpose of storage or control of water, that— (i) is 25 feet or more in height from— (I) the natural bed of the stream channel or watercourse measured at the downstream toe of the barrier; or (II) if the barrier is not across a stream channel or watercourse, from the lowest elevation of the outside limit of the barrier; to the maximum water storage elevation; or (ii) has an impounding capacity for maximum storage elevation of 50 acre-feet or more; but (B) does not include— (i) a levee; or (ii) a barrier described in subparagraph (A) that— (I) is 6 feet or less in height regardless of storage capacity; or (II) has a storage capacity at the maximum water storage elevation that is 15 acre-feet or less regardless of height; unless the barrier, because of the location of the barrier or another physical characteristic of the barrier, is likely to pose a significant threat to human life or property if the barrier fails (as determined by the Administrator). (4) Eligible high hazard potential dam (A) In general The term “eligible high hazard potential dam” means a non-Federal dam that— (i) is located in a State with a State dam safety program; (ii) is classified as “high hazard potential” by the State dam safety agency in the State in which the dam is located; (iii) has an emergency action plan that— (I) is approved by the relevant State dam safety agency; or (II) is in conformance with State law and pending approval by the relevant State dam safety agency; (iv) fails to meet minimum dam safety standards of the State in which the dam is located, as determined by the State; and (v) poses an unacceptable risk to the public, as determined by the Administrator, in consultation with the Board. (B) Exclusion The term “eligible high hazard potential dam” does not include— (i) a licensed hydroelectric dam under a hydropower project with an authorized installed capacity of greater than 1.5 megawatts; or (ii) a dam built under the authority of the Secretary of Agriculture. (5) Federal agency The term “Federal agency” means a Federal agency that designs, finances, constructs, owns, operates, maintains, or regulates the construction, operation, or maintenance of a dam. (6) Federal Guidelines for Dam Safety The term “Federal Guidelines for Dam Safety” means the FEMA publication, numbered 93 and dated June 1979, that defines management practices for dam safety at all Federal agencies. (7) FEMA The term “FEMA” means the Federal Emergency Management Agency. (8) Hazard reduction The term “hazard reduction” means the reduction in the potential consequences to life and property of dam failure. (9) ICODS The term “ICODS” means the Interagency Committee on Dam Safety established by section 467e of this title. (10) Eligible subrecipient The term “eligible subrecipient”, in the case of a project receiving assistance under section 467f–2 of this title, includes— (A) a governmental organization; and (B) a nonprofit organization. (11) Program The term “Program” means the national dam safety program established under section 467f of this title. (12) Rehabilitation The term “rehabilitation” means the repair, replacement, reconstruction, or removal of a dam that is carried out to meet applicable State dam safety and security standards. (13) State The term “State” means each of the several States of the United States, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, the Commonwealth of the Northern Mariana Islands, and any other territory or possession of the United States. (14) State dam s...29 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 467f-2 Rehabilitation of high hazard potential dams Amends
33 U.S.C. § 467f-2 — at 467f-2(a), 467f-2(b), 467f-2(c), 467f-2(d), 467f-2(e), and 467f-2(i)(1)
The law today
(a) Establishment of program The Administrator shall establish, within FEMA, a program to provide technical, planning, design, and construction assistance in the form of grants to States with dam safety programs for rehabilitation of eligible high hazard potential dams. (b) Eligible activities A grant awarded under this section to a State may be used by the State to award grants to eligible subrecipients for— (1) repair; (2) removal; or (3) any other structural or nonstructural measures to rehabilitate an eligible high hazard potential dam. (c) Award of grants (1) Application (A) In general A State interested in receiving a grant under this section may submit to the Administrator an application for the grant. (B) Requirements An application submitted to the Administrator under this section shall be submitted at such time, be in such form, and contain such information as the Administrator may prescribe by regulation. (2) Grant (A) In general The Administrator may make a grant in accordance with this section for rehabilitation of eligible high hazard potential dams to a State that submits an application for the grant in accordance with the regulations prescribed by the Administrator. (B) Grant agreement The Administrator shall enter into a grant agreement with the State to establish the terms of the grant and the projects for which the grant is awarded, including the amount of the grant. (C) Grant assurance As part of a grant agreement under subparagraph (B), the Administrator shall require that each eligible subrecipient to which the State awards a grant under this section provides an assurance from the dam owner, with respect to the dam to be rehabilitated, that the dam owner will carry out a plan for maintenance of the dam during the expected life of the dam. (D) Limitation A State may not award a grant to an eligible subrecipient under this section that exceeds, for any 1 dam, the lesser of— (i) 12.5 percent of the total amount of funds made available to carry out this section; or (ii) $7,500,000. (d) Requirements (1) Approval A grant awarded under this section to an eligible subrecipient for a project shall be approved by the relevant State dam safety agency. (2) Eligible subrecipient requirements To receive a grant under this section, an eligible subrecipient shall, with respect to the dam to be rehabilitated by the eligible subrecipient— (A) demonstrate that the community in which the dam is located participates in, and complies with, all applicable Federal flood insurance programs, including demonstrating that such community is participating in the National Flood Insurance Program, and is not on probation, suspended, or withdrawn from such Program; (B) beginning not later than 2 years after the date on which the Administrator publishes criteria for hazard mitigation plans under paragraph (3), demonstrate that the Tribal or local government with jurisdiction over the area in which the dam is located has in place a hazard mitigation plan that— (i) includes all dam risks; and (ii) complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552); (C) for a project not including removal, obtain a commitment from the dam owner to provide operation and maintenance of the project for the expected life of the dam following completion of rehabilitation; (D) comply with such minimum eligibility requirements as the Administrator may establish to ensure that each owner and operator of a dam under a participating State dam safety program and that receives assistance under this section— (i) acts in accordance with the State dam safety program; and (ii) carries out activities relating to the public in the area around the dam in accordance with the hazard mitigation plan described in subparagraph (B); and (E) comply with section 5196(j)(9) of title 42 (as in effect on December 16, 2016) with respect to projects receiving assistance under this section in the same manner as recipients are required to comply in orde...14 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
River and harbor improvements generally · 33 U.S.C. ch. 12 2 sections
-
§ 579a Corps budgeting; project deauthorizations; comprehensive backlog report Amends
33 U.S.C. § 579a
The law today
(a) Funds to be obligated for construction to avoid deauthorization Any project authorized for construction by this Act shall not be authorized after the last day of the 5-year period beginning on November 17, 1986, unless during such period funds have been obligated for construction, including planning and designing, of such project. (b) Transmission to Congress of list of unconstructed projects or separable elements authorized but not receiving obligations during 10 fiscal years preceding transmission; two-year updates of list (1) Not later than one year after November 17, 1986, the Secretary shall transmit to Congress a list of unconstructed projects, or unconstructed separable elements of projects, which have been authorized, but have received no obligations during the 10 full fiscal years preceding the transmittal of such list. A project or separable element included in such list is not authorized after December 31, 1989, if funds have not been obligated for construction of such project or element after November 17, 1986, and before December 31, 1989. (2) Comprehensive construction backlog and operation and maintenance report.— (A) In general.— The Secretary, once every 2 years, shall compile and publish— (i) a complete list of all projects and separable elements of projects of the Corps of Engineers that are authorized for construction but have not been completed; (ii) a complete list of all feasibility studies of the Corps of Engineers that Congress has authorized the Secretary to carry out for which a Report of the Chief of Engineers has not been issued; (iii) a complete list of all environmental infrastructure projects authorized by Congress under section 219 of the Water Resources Development Act of 1992 (106 Stat. 4835); and (iv) a list of major Federal operation and maintenance needs of projects and properties under the control of the Corps of Engineers. (B) Required information.— The Secretary shall include on each list developed under clause (i), (ii), or (iii) of subparagraph (A) for each feasibility study, project, and separable element on that list— (i) the date of authorization of the feasibility study, project, or separable element, including any subsequent modifications to the original authorization; (ii) the original budget authority for the feasibility study, project, or separable element; (iii) a brief description of the feasibility study, project, or separable element; (iv) the estimated date of completion of the feasibility study, project, or separable element, assuming all capability is fully funded; (v) the estimated total cost of completion of the feasibility study, project, or separable element; (vi) the amount of funds spent on the feasibility study, project, or separable element, including Federal and non-Federal funds; (vii) the amount of appropriations estimated to be required in each fiscal year during the period of construction to complete the project or separable element by the date specified under clause (iv); (viii) the location of the feasibility study, project, or separable element; (ix) a statement from the non-Federal interest for the project or separable element indicating the non-Federal interest’s capability to provide the required local cooperation estimated to be required for the project or separable element in each fiscal year during the period of construction; (x) the benefit-cost ratio of the project or separable element, calculated using the discount rate specified by the Office of Management and Budget for purposes of preparing the President’s budget pursuant to chapter 11 of title 31; (xi) the benefit-cost ratio of the project or separable element, calculated using the discount rate utilized by the Corps of Engineers for water resources development project planning pursuant to section 1962d–17 of title 42; and (xii) the last fiscal year in which the project or separable element incurred obligations. (C) Required operation and maintenance information.— The Secretary shall ...6 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 610 Control of aquatic plant growths and invasive species Amends
33 U.S.C. § 610
The law today
(a) In general (1) In general There is hereby authorized a comprehensive program to provide for prevention, control, and progressive eradication of noxious aquatic plant growths and aquatic invasive species from the navigable waters, tributary streams, connecting channels, and other allied waters of the United States, in the combined interest of navigation, flood control, drainage, agriculture, fish and wildlife conservation, public health, and related purposes, including continued research for development of the most effective and economic control measures, to be administered by the Chief of Engineers, under the direction of the Secretary of the Army, in cooperation with other Federal and State agencies. (2) Local interests Local interests shall agree to hold and save the United States free from claims that may occur from control operations and to participate to the extent of 30 per centum of the cost of such operations. (3) Federal costs Costs for research and planning undertaken pursuant to the authorities of this section shall be borne fully by the Federal Government. (b) Authorization of appropriations (1) In general There is authorized to be appropriated to carry out this section (except for subsections (f) and (g)) $130,000,000 for each fiscal year, of which— (A) $30,000,000 shall be made available to carry out subsection (d)(1)(A)(i); (B) $30,000,000 shall be made available to carry out subsection (d)(1)(A)(ii); (C) $30,000,000 shall be made available to carry out subsection (d)(1)(A)(iii); (D) $30,000,000 shall be made available to carry out subsection (d)(1)(A)(iv); and (E) $10,000,000 shall be made available to carry out subsection (d)(1)(A)(v). (2) Other programs (A) In general There are authorized to be appropriated— (i) $10,000,000 for each of fiscal years 2025 through 2029 to carry out subsection (f); and (ii) $75,000,000 for each of fiscal years 2021 through 2029 to carry out subsection (g)(2). (B) Invasive plant species pilot program There is authorized to be appropriated to the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, $10,000,000 to carry out subsection (g)(3). (3) Control operations Any funds made available under paragraph (1) or (2)(A) to be used for control operations shall be allocated by the Chief of Engineers on a priority basis, based on the urgency and need of each area and the availability of local funds. (c) Support In carrying out the program under this section, the Secretary is encouraged to use contracts, cooperative agreements, and grants with colleges and universities and other non-Federal entities. (d) Watercraft inspection and Decontamination stations (1) In general (A) Watercraft inspection and decontamination stations In carrying out this section, the Secretary shall establish (as applicable), operate, and maintain new or existing watercraft inspection and decontamination stations— (i) to protect the Columbia River Basin; (ii) to protect the Upper Missouri River Basin; (iii) to protect the Upper Colorado River Basin and the South Platte and Arkansas River Basins; (iv) to protect the Russian River Basin, California; and (v) to protect basins and watersheds that adjoin an international border between the United States and Canada. (B) Locations The Secretary shall place watercraft inspection and decontamination stations under subparagraph (A) at locations with the highest likelihood of preventing the spread of aquatic invasive species into and out of waters of the United States, as determined by the Secretary in consultation with the Governors and entities described in paragraph (3). (C) Rapid response The Secretary shall assist States within the areas described in subparagraph (A) with rapid response to any aquatic invasive species, including quagga or zebra mussel, infestation. (2) Cost share The non-Federal share of the cost of constructing, operating, and maintaining watercraft inspection and decontamination stations describe...21 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Mississippi river commission · 33 U.S.C. ch. 13 1 section
-
§ 652 Upper Mississippi River Management Amends
33 U.S.C. § 652 — at 652(e)
The law today
(a) Short title; Congressional declaration of intent (1) This section may be cited as the “Upper Mississippi River Management Act of 1986”. (2) To ensure the coordinated development and enhancement of the Upper Mississippi River system, it is hereby declared to be the intent of Congress to recognize that system as a nationally significant ecosystem and a nationally significant commercial navigation system. Congress further recognizes that the system provides a diversity of opportunities and experiences. The system shall be administered and regulated in recognition of its several purposes. (b) Definitions For purposes of this section— (1) the terms “Upper Mississippi River system” and “system” mean those river reaches having commercial navigation channels on the Mississippi River main stem north of Cairo, Illinois; the Minnesota River, Minnesota; Black River, Wisconsin; Saint Croix River, Minnesota and Wisconsin; Illinois River and Waterway, Illinois; and Kaskaskia River, Illinois; (2) the term “Master Plan” means the comprehensive master plan for the management of the Upper Mississippi River system, dated January 1, 1982, prepared by the Upper Mississippi River Basin Commission and submitted to Congress pursuant to Public Law 95–502; (3) the term “GREAT I, GREAT II, and GRRM studies” means the studies entitled “GREAT Environmental Action Team—GREAT I—A Study of the Upper Mississippi River”, dated September 1980, “GREAT River Environmental Action Team—GREAT II—A Study of the Upper Mississippi River”, dated December 1980, and “GREAT River Resource Management Study”, dated September 1982; and (4) the term “Upper Mississippi River Basin Association” means an association of the States of Illinois, Iowa, Minnesota, Missouri, and Wisconsin, formed for the purposes of cooperative effort and united assistance in the comprehensive planning for the use, protection, growth, and development of the Upper Mississippi River System. (c) Congressional approval of Master Plan (1) Congress hereby approves the Master Plan as a guide for future water policy on the Upper Mississippi River system. Such approval shall not constitute authorization of any recommendation contained in the Master Plan. (2) Omitted. (d) Cooperative effort and mutual assistance among States (1) The consent of the Congress is hereby given to the States of Illinois, Iowa, Minnesota, Missouri, and Wisconsin, or any two or more of such States, to enter into negotiations for agreements, not in conflict with any law of the United States, for cooperative effort and mutual assistance in the comprehensive planning for the use, protection, growth, and development of the Upper Mississippi River system, and to establish such agencies, joint or otherwise, or designate an existing multi-State entity, as they may deem desirable for making effective such agreements. To the extent required by Article I, section 10 of the Constitution, such agreements shall become final only after ratification by an Act of Congress. (2) The Secretary is authorized to enter into cooperative agreements with the Upper Mississippi River Basin Association or any other agency established under paragraph (1) of this subsection to promote and facilitate active State government participation in the river system management, development, and protection. (3) For the purpose of ensuring the coordinated planning and implementation of programs authorized in subsections (e) and (h)(2) of this section, the Secretary shall enter into an interagency agreement with the Secretary of the Interior to provide for the direct participation of, and transfer of funds to, the Fish and Wildlife Service and any other agency or bureau of the Department of the Interior for the planning, design, implementation, and evaluation of such programs. (4) The Upper Mississippi River Basin Association or any other agency established under paragraph (1) of this subsection is hereby designated by Congress as the caretaker of the master plan. Any chan...8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Flood control · 33 U.S.C. ch. 15 4 sections
-
§ 701b-11 Flood protection projects Amends
33 U.S.C. § 701b-11 — at 701b-11(a)
The law today
(a) General considerations; nonstructural alternatives In the survey, planning, or design by any Federal agency of any project involving flood protection, consideration shall be given to nonstructural alternatives to prevent or reduce flood damages, with a view toward formulating the most economically, socially, and environmentally acceptable means of reducing or preventing flood damage, including— (1) floodproofing of structures, including through elevation; (2) floodplain regulation; (3) acquisition of floodplain land for recreational, fish and wildlife, and other public purposes; (4) relocation; and (5) the use of a feature described in section 2289a(a) of this title. (b) Non-Federal participation through nonstructural alternatives; limitation Where a nonstructural alternative is recommended, non-Federal participation shall be comparable to the value of lands, easements, and rights-of-way which would have been required of non-Federal interests under section 701c of this title, for structural protection measures, but in no event shall exceed 20 per centum of the project costs.2 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 701n Emergency response to natural disasters Amends
33 U.S.C. § 701n
The law today
(a) Emergency fund (1) There is authorized an emergency fund to be expended in preparation for emergency response to any natural disaster, in flood fighting and rescue operations, or in the repair or restoration of any flood control work threatened or destroyed by flood, including the strengthening, raising, extending, realigning, or other modification thereof as may be necessary in the discretion of the Chief of Engineers for the adequate functioning of the work for flood control and subject to the condition that the Chief of Engineers may include modifications to the structure or project, or in implementation of nonstructural alternatives to the repair or restoration of such flood control work if requested by the non-Federal sponsor; in the emergency protection of federally authorized hurricane or shore protection being threatened when in the discretion of the Chief of Engineers such protection is warranted to protect against imminent and substantial loss to life and property; in the repair and restoration of any federally authorized hurricane or shore protective structure or project damaged or destroyed by wind, wave, or water action of other than an ordinary nature to the pre-storm level of protection, to the design level of protection, or, notwithstanding the authorized dimensions of the structure or project, to a level sufficient to meet the authorized purpose of such structure or project, whichever provides greater protection, when, in the discretion of the Chief of Engineers, such repair and restoration is warranted for the adequate functioning of the structure or project for hurricane or shore protection, including to ensure the structure or project is functioning adequately to protect against projected changes in wave action or height or storm surge (including changes that result from relative sea level change over the useful life of the structure or project), subject to the condition that the Chief of Engineers may, if requested by the non-Federal sponsor, include modifications to the structure or project (including the addition of new project features) to address major deficiencies, increase resilience, increase benefits from the reduction of damages from inundation, wave action, or erosion, or implement nonstructural alternatives to the repair or restoration of the structure. The emergency fund may also be expended for emergency dredging for restoration of authorized project depths for Federal navigable channels and waterways made necessary by flood, drought, earthquake, or other natural disasters. In any case in which the Chief of Engineers is otherwise performing work under this section in an area for which the Governor of the affected State has requested a determination that an emergency exists or a declaration that a major disaster exists under the Disaster Relief and Emergency Assistance Act [42 U.S.C. 5121 et seq.], the Chief of Engineers is further authorized to perform on public and private lands and waters for a period of ten days following the Governor’s request any emergency work made necessary by such emergency or disaster which is essential for the preservation of life and property, including, but not limited to, channel clearance, emergency shore protection, clearance and removal of debris and wreckage endangering public health and safety, and temporary restoration of essential public facilities and services. The Chief of Engineers, in the exercise of his discretion, is further authorized to provide emergency supplies of clean water, on such terms as he determines to be advisable, to any locality which he finds is confronted with a source of contaminated water causing or likely to cause a substantial threat to the public health and welfare of the inhabitants of the locality. The appropriation of such moneys for the initial establishment of this fund and for its replenishment on an annual basis, is authorized: Provided, That pending the appropriation of sums to such emergency fund, the Secretary of...25 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 701s Small flood control projects; appropriations; amount limitation for single locality; conditions Amends
33 U.S.C. § 701s
The law today
The Secretary of the Army is authorized to allot from any appropriations heretofore or hereafter made for flood control, not to exceed $90,000,000 for any one fiscal year, for the implementation of small structural and nonstructural projects, and projects that use natural features or nature-based features (as those terms are defined in section 2289a(a) of this title), for flood control and related purposes not specifically authorized by Congress, which come within the provisions of section 701a of this title, when in the opinion of the Chief of Engineers such work is advisable. The amount allotted for a project shall be sufficient to complete Federal participation in the project. Not more than $15,000,000 shall be allotted under this section for a project at any single locality. The provisions of local cooperation specified in section 701c of this title shall apply. The work shall be complete in itself and not commit the United States to any additional improvement to insure its successful operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports.10 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 709a Information on floods and flood damage Amends
33 U.S.C. § 709a — at 709a(a)
The law today
(a) Compilation and dissemination (1) In general In recognition of the increasing use and development of the flood plains of the rivers of the United States and of the need for information on flood hazards to serve as a guide to such development, and as a basis for avoiding future flood hazards by regulation of use by States and political subdivisions thereof, and to assure that Federal departments and agencies may take proper cognizance of flood hazards, the Secretary of the Army, through the Chief of Engineers, is hereby authorized to compile and disseminate information on floods and flood damages, including identification of areas subject to inundation by floods of various magnitudes and frequencies, identification of areas subject to floods due to accumulated snags and other debris, and general criteria for guidance of Federal and non-Federal interests and agencies in the use of flood plain areas; and to provide advice to other Federal agencies and local interests for their use in planning to ameliorate the flood hazard, to avoid repetitive flooding impacts, to anticipate, prepare, and adapt to changing climatic conditions and extreme weather events, and to withstand, respond to, and recover rapidly from disruption due to the flood hazards. (2) Surveys and guides Surveys and guides will be made for States and political subdivisions thereof only upon the request of a State or a political subdivision thereof, and upon approval by the Chief of Engineers, and such information and advice provided them only upon such request and approval. (3) Identification of assistance (A) In general To the maximum extent practicable, in providing assistance under this subsection, the Secretary shall identify and communicate to States and non-Federal interests specific opportunities to partner with the Corps of Engineers to address flood hazards. (B) Coordination The Secretary shall coordinate activities under this paragraph with activities described in section 1962d–16 of title 42. (b) Flood prevention coordination The Secretary shall coordinate with the Administrator of the Federal Emergency Management Agency and the heads of other Federal agencies to ensure that flood control projects and plans are complementary and integrated to the extent practicable and appropriate. (c) Fees The Secretary of the Army is authorized to establish and collect fees from Federal agencies and private persons for the purpose of recovering the cost of providing services pursuant to this section. Funds collected pursuant to this section shall be deposited into the account of the Treasury of the United States entitled “Contributions and Advances, Rivers and Harbor, Corps of Engineers (8862)” and shall be available until expended to carry out this section. No fees shall be collected from State, regional, or local governments or other non-Federal public agencies for services provided pursuant to this section, but the Secretary of the Army may accept funds voluntarily contributed by such entities for the purpose of expanding the scope of the services requested by the entities. (d) Institutions of higher education Notwithstanding section 4141 of title 10, in carrying out this section, the Secretary may work with an institution of higher education, as determined appropriate by the Secretary. (e) Fiscal year limitation on expenditures The Secretary of the Army is authorized to expend not to exceed $50,000,000 per fiscal year for the compilation and dissemination of information under this section.11 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Saint lawrence seaway · 33 U.S.C. ch. 19 Amends the act as a whole
Water resources development · 33 U.S.C. ch. 36 18 sections Amends the act as a whole
-
§ 2213 Flood control and other purposes Amends
33 U.S.C. § 2213 — at 2213(j)(1)
The law today
(a) Flood control (1) General rule The non-Federal interests for a project with costs assigned to flood control (other than a nonstructural project) shall— (A) pay 5 percent of the cost of the project assigned to flood control during construction of the project; (B) provide all lands, easements, rights-of-way, and dredged material disposal areas required only for flood control and perform all related necessary relocations; and (C) provide that portion of the joint costs of lands, easements, rights-of-way, dredged material disposal areas, and relocations which is assigned to flood control. (2) 35 percent minimum contribution If the value of the contributions required under paragraph (1) of this subsection is less than 35 percent of the cost of the project assigned to flood control, the non-Federal interest shall pay during construction of the project such additional amounts as are necessary so that the total contribution of the non-Federal interests under this subsection is equal to 35 percent of the cost of the project assigned to flood control. (3) 50 percent maximum The non-Federal share under paragraph (1) shall not exceed 50 percent of the cost of the project assigned to flood control. The preceding sentence does not modify the requirement of paragraph (1)(A) of this subsection. (4) Deferred payment of amount exceeding 30 percent If the total amount of the contribution required under paragraph (1) of this subsection exceeds 30 percent of the cost of the project assigned to flood control, the non-Federal interests may pay the amount of the excess to the Secretary over a 15-year period (or such shorter period as may be agreed to by the Secretary and the non-Federal interests) beginning on the date construction of the project or separable element is completed, at an interest rate determined pursuant to section 2216 of this title. The preceding sentence does not modify the requirement of paragraph (1)(A) of this subsection. (b) Projects using nonstructural, natural, or nature-based features (1) In general The non-Federal share of the cost of a flood risk management or hurricane and storm damage risk reduction measure using a nonstructural feature, or a natural feature or nature-based feature (as those terms are defined in section 2289a(a) of this title), shall be 35 percent of the cost of such measures. The non-Federal interests for any such measures shall be required to provide all lands, easements, rights-of-way, dredged material disposal areas, and relocations necessary for the project, but shall not be required to contribute any amount in cash during construction for a nonstructural feature if the costs of land, easements, rights-of-way, dredged material disposal areas, and relocations for such feature are estimated to exceed 35 percent. (2) Non-Federal contribution in excess of 35 percent At any time during construction of a project, if the Secretary determines that the costs of land, easements, rights-of-way, dredged material disposal areas, and relocations for the project, in combination with other costs contributed by the non-Federal interests, will exceed 35 percent, any additional costs for the project (not to exceed 65 percent of the total costs of the project) shall be a Federal responsibility and shall be contributed during construction as part of the Federal share. (c) Other purposes The non-Federal share of the cost assigned to other project purposes shall be as follows: (1) hydroelectric power: 100 percent, except that the marketing of such power and the recovery of costs of constructing, operating, maintaining, and rehabilitating such projects shall be in accordance with existing law: Provided, That after November 17, 1986, the Secretary shall not submit to Congress any proposal for the authorization of any water resources project that has a hydroelectric power component unless such proposal contains the comments of the appropriate Power Marketing Administrator designated pursuant to section 7152 of title 4...13 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2231 Study of water resources development projects by non-Federal interests Amends
33 U.S.C. § 2231
The law today
(a) Submission to Secretary (1) In general A non-Federal interest may undertake and submit to the Secretary— (A) a federally authorized feasibility study of a proposed water resources development project; or (B) upon the determination of the Secretary that the modifications are consistent with the authorized purposes of the project, a feasibility study on modifications to a water resources development project constructed by the Corps of Engineers or constructed by a non-Federal interest pursuant to section 2232 of this title. (2) Guidelines To assist non-Federal interests, the Secretary shall issue guidelines for the formulation of feasibility studies of water resources development projects undertaken by non-Federal interests that— (A) provide clear, concise, and transparent guidance for the non-Federal interest to use in developing a feasibility study that complies with requirements that would apply to a feasibility study undertaken by the Secretary; (B) provide sufficient information for the formulation of the studies, including processes and procedures related to reviews and assistance under subsection (e); (C) provide guidance to a non-Federal interest on obtaining support from the Secretary to complete elements of a feasibility study that may be considered inherently governmental and required to be done by a Federal agency; and (D) provide contacts for employees of the Corps of Engineers that a non-Federal interest may use to initiate coordination with the Secretary and identify at what stages coordination may be beneficial. (3) Determination If a non-Federal interest requests to undertake a feasibility study on a modification to a constructed water resources development project under paragraph (1)(B), the Secretary shall expeditiously provide to the non-Federal interest the determination required under such paragraph with respect to whether conceptual modifications, as presented by the non-Federal interest, are consistent with the authorized purposes of the project. (b) Review by Secretary (1) In general The Secretary shall review each feasibility study received under subsection (a)(1) for the purpose of determining whether or not the study, and the process under which the study was developed, each comply with Federal laws and regulations applicable to feasibility studies of water resources development projects. (2) Timing The Secretary may not submit to Congress an assessment of a feasibility study under this section until such time as the Secretary— (A) determines that the feasibility study complies with all of the requirements that would apply to a feasibility study undertaken by the Secretary; and (B) completes all of the Federal analyses, reviews, and compliance processes under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), that would be required with respect to the proposed project if the Secretary had undertaken the feasibility study. (3) Initiation of review (A) Request (i) Submission The non-Federal interest may submit to the Secretary a request that the Secretary initiate the analyses, reviews, and compliance processes described in paragraph (2)(B) with respect to the proposed project prior to the non-Federal interest’s submission of a feasibility study under subsection (a)(1). (ii) Effect Receipt by the Secretary of a request submitted under clause (i) shall be considered the receipt of a proposal or application that will lead to a major Federal action that is subject to the requirements of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) that would be required if the Secretary were to undertake the feasibility study. (B) Deadline Not later than 10 days after the Secretary receives a study submission under subsection (a) or receives a request under subparagraph (A), the Secretary shall begin the required analyses, reviews, and compliance processes. (C) Additional information required The Secretary shall notify a non-Federal interest if, upon ...12 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2232 Construction of water resources development projects by non-Federal interests Amends
33 U.S.C. § 2232 — at 2232(c)(1) and 2232(f)
The law today
(a) Water resources development project defined In this section, the term “water resources development project” means a project recommendation that results from— (1) a feasibility report, as such term is defined in section 2282d(f) 1 of this title; (2) a completed feasibility study developed under section 2231 of this title; or (3) a final feasibility study for water resources development and conservation and other purposes that is specifically authorized by Congress to be carried out by the Secretary. (b) Authority (1) In general A non-Federal interest may carry out a federally authorized water resources development project, or separable element thereof— (A) in accordance with a plan approved by the Secretary for the project or separable element; and (B) subject to any conditions that the Secretary may require, including any conditions specified under section 2231(c)(3) of this title. (2) Conditions Before carrying out a water resources development project, or separable element thereof, under this section, a non-Federal interest shall— (A) obtain any permit or approval required in connection with the project or separable element under Federal or State law, except as provided in paragraph (3); and (B) ensure that a final environmental impact statement or environmental assessment, as appropriate, for the project or separable element has been filed. (3) Permit exception (A) In general For a project described in subsection (a)(1) or subsection (a)(3), or a separable element thereof, with respect to which a written agreement described in subparagraph (B) has been entered into, a non-Federal interest that carries out a project under this section shall not be required to obtain any Federal permits or approvals that would not be required if the Secretary carried out the project or separable element unless significant new circumstances or information relevant to environmental concerns or compliance have arisen since development of the project recommendation. (B) Written agreement For purposes of this paragraph, a written agreement shall provide that the non-Federal interest shall comply with the same legal and technical requirements that would apply if the project or separable element were carried out by the Secretary, including all mitigation required to offset environmental impacts of the project or separable element as determined by the Secretary. (C) Certifications Notwithstanding subparagraph (A), if a non-Federal interest carrying out a project under this section would, in the absence of a written agreement entered into under this paragraph, be required to obtain a certification from a State under Federal law to carry out the project, such certification shall still be required if a written agreement is entered into with respect to the project under this paragraph. (4) Data sharing (A) In general If a non-Federal interest for a water resources development project begins to carry out that water resources development project under this section, the non-Federal interest may request that the Secretary transfer to the non-Federal interest all relevant data and documentation under the control of the Secretary with respect to that water resources development project. (B) Deadline Except as provided in subparagraph (C), the Secretary shall transfer the data and documentation requested by a non-Federal interest under subparagraph (A) not later than the date that is 90 days after the date on which the non-Federal interest so requests such data and documentation. (C) Limitation Nothing in this paragraph obligates the Secretary to share any data or documentation that the Secretary considers to be proprietary information. (c) Studies and engineering (1) In general When requested by a non-Federal interest carrying out a project or separable element of a project under this section, the Secretary shall undertake all necessary studies, engineering, and technical assistance on construction for any project or separable element of a project under...12 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2238 Authorization of appropriations Amends
33 U.S.C. § 2238 — at 2238(c)(3), 2238(e)(2)(A)(ii), and 2238(f)
The law today
(a) Trust fund There are authorized to be appropriated out of the Harbor Maintenance Trust Fund, established by section 9505 of title 26, for each fiscal year such sums as may be necessary to pay— (1) 100 percent of the eligible operations and maintenance costs of those portions of the Saint Lawrence Seaway operated and maintained by the Great Lakes St. Lawrence Seaway Development Corporation for such fiscal year; and (2) up to 100 percent of the eligible operations and maintenance costs assigned to commercial navigation of all harbors and inland harbors within the United States. (b) General fund There are authorized to be appropriated out of the general fund of the Treasury of the United States for each fiscal year such sums as may be necessary to pay the balance of all eligible operations and maintenance costs not provided by payments from the Harbor Maintenance Trust Fund under this section. (c) Operation and maintenance of harbor projects (1) In general To the maximum extent practicable, the Secretary shall make expenditures to pay for operation and maintenance costs of the harbors and inland harbors referred to in subsection (a)(2), including expenditures of funds appropriated from the Harbor Maintenance Trust Fund, based on an equitable allocation of funds among all such harbors and inland harbors. (2) Criteria (A) In general In determining an equitable allocation of funds under paragraph (1), the Secretary shall— (i) consider the information obtained in the assessment conducted under subsection (e); (ii) consider the national and regional significance of harbor operations and maintenance; and (iii) as appropriate, consider national security and military readiness needs. (B) Limitation The Secretary shall not allocate funds under paragraph (1) based solely on the tonnage transiting through a harbor. (3) Emerging harbor projects (A) Allocation Notwithstanding any other provision of this subsection, in making expenditures under paragraph (1) for each fiscal year, the Secretary shall allocate for operation and maintenance costs of emerging harbor projects an amount that is not less than 10 percent of the funds made available under this section for fiscal year 2012 to pay the costs described in subsection (a)(2). (B) Additional uses at emerging harbors (i) Uses In each fiscal year, the Secretary may use not more than $5,000,000 of funds allocated for emerging harbor projects under paragraph (1) to pay for the costs of up to 10 projects for maintenance dredging of a marina or berthing area, in an emerging harbor, that includes an area that is located adjacent to, or is accessible by, a Federal navigation project, subject to clauses (ii) and (iii) of this subparagraph. (ii) Eligible emerging harbors The Secretary may use funds as authorized under clause (i) at an emerging harbor that— (I) supports commercial activities, including commercial fishing operations, commercial fish processing operations, recreational and sport fishing, and commercial boat yards; or (II) supports activities of the Secretary of the department in which the Coast Guard is operating. (iii) Cost-sharing requirements The Secretary shall require a non-Federal interest to contribute not less than 25 percent of the costs for maintenance dredging of that portion of a maintenance dredging project described in clause (i) that is located outside of the Federal navigation project, which may be provided as an in-kind contribution, including through the use of dredge equipment owned by non-Federal interest to carry out such activities. (4) Management of Great Lakes Navigation System To sustain effective and efficient operation and maintenance of the Great Lakes Navigation System, including any navigation feature in the Great Lakes that is a Federal responsibility with respect to operation and maintenance, the Secretary shall manage all of the individually authorized projects in the Great Lakes Navigation System as components of a single, comprehensive system, rec...27 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2238c Additional measures at donor ports and energy transfer ports Amends
33 U.S.C. § 2238c — at 2238c(f) and 2238c(a)
The law today
(a) Definitions In this section: (1) Cargo container The term “cargo container” means a cargo container that is 1 Twenty-foot Equivalent Unit. (2) Discretionary cargo The term “discretionary cargo” means maritime cargo for which the United States port of unlading is different than the United States port of entry. (3) Donor port (A) In general The term “donor port” means a port— (i) that is subject to the harbor maintenance fee under section 24.24 of title 19, Code of Federal Regulations (or a successor regulation); (ii) at which the total amount of harbor maintenance taxes collected (including the estimated taxes related to domestic cargo and cruise passengers) comprise not less than $15,000,000 annually of the total funding of the Harbor Maintenance Trust Fund on an average annual basis for the previous 3 fiscal years; (iii) that received less than 25 percent of the total amount of harbor maintenance taxes collected (including the estimated taxes related to domestic cargo and cruise passengers) at that port in the previous 3 fiscal years; and (iv) that is located in a State in which more than 2,000,000 cargo containers were unloaded from or loaded on to vessels on an average annual basis for the previous 3 fiscal years. (B) Calculation For the purpose of calculating the percentage described in subparagraph (A)(iii), payments described under subsection (c)(1) shall not be included. (4) Energy commodity The term “energy commodity” includes— (A) petroleum products; (B) natural gas; (C) coal; (D) wind and solar energy components; and (E) biofuels. (5) Energy transfer port The term “energy transfer port” means a port— (A) that is subject to the harbor maintenance fee under section 24.24 of title 19, Code of Federal Regulations (or any successor regulation); and (B) (i) at which energy commodities comprised greater than 25 percent of all commercial activity by tonnage on an average annual basis for the previous 3 fiscal years; and (ii) through which more than 40,000,000 tons of cargo were transported on an average annual basis for the previous 3 fiscal years. (6) Expanded uses The term “expanded uses” has the meaning given the term in section 2238(f) of this title. (7) Harbor maintenance tax The term “harbor maintenance tax” has the meaning given the term in section 2238(f) of this title. (8) Harbor maintenance trust fund The term “Harbor Maintenance Trust Fund” means the Harbor Maintenance Trust Fund established by section 9505 of title 26. (9) Medium-sized donor port The term “medium-sized donor port” means a port— (A) that is subject to the harbor maintenance fee under section 24.24 of title 19, Code of Federal Regulations (or a successor regulation); (B) at which the total amount of harbor maintenance taxes collected (including the estimated taxes related to domestic cargo and cruise passengers) comprise annually more than $5,000,000 but less than $15,000,000 of the total funding of the Harbor Maintenance Trust Fund on an average annual basis for the previous 3 fiscal years; (C) that received less than 25 percent of the total amount of harbor maintenance taxes collected (including the estimated taxes related to domestic cargo and cruise passengers) at that port in the previous 3 fiscal years; and (D) that is located in a State in which more than 2,000,000 cargo containers were unloaded from or loaded onto vessels on an average annual basis for the previous 3 fiscal years. (b) Authority (1) In general Subject to the availability of appropriations, the Secretary may provide to donor ports, medium-sized donor ports, and energy transfer ports amounts in accordance with this section. (2) Limitations Amounts provided under this section— (A) for energy transfer ports shall be divided equally among all States with an energy transfer port; (B) shall be made available to a port as either a donor port, medium-sized donor port, or an energy transfer port, and no port may receive amounts from more than 1 designation; and (C) for donor po...9 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2263a Aquatic invasive species research Amends
33 U.S.C. § 2263a
The law today
(a) In general As part of the ongoing activities of the Engineer Research and Development Center to address the spread and impacts of aquatic invasive species, the Secretary shall undertake research on the prevention, management, and eradication of aquatic invasive species, including Asian carp, elodea, hydrilla, quagga mussels, and zebra mussels. (b) Locations In carrying out subsection (a), the Secretary shall work with Corps of Engineers district offices representing diverse geographical regions of the continental United States that are impacted or could be impacted in the future by aquatic invasive species, such as the Atlantic, Pacific, Arctic, and Gulf Coasts, the Great Lakes, and reservoirs operated and maintained by the Secretary. (c) Report Not later than 180 days after October 23, 2018, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report recommending a plan to address the spread and impacts of aquatic invasive species.4 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2269 Tribal partnership program Amends
33 U.S.C. § 2269
The law today
(a) Definitions In this section: (1) Indian tribe The terms “Indian tribe” and “Indian Tribe” have the meanings given the terms “Indian tribe” has the meaning given the term 1 in section 5304 of title 25. (2) Inter-tribal consortium The term “inter-tribal consortium” has the meaning given the term in section 3202 of title 25. (3) Tribal organization The term “Tribal organization” has the meaning given the term in section 5304 of title 25. (b) Program (1) In general In cooperation with Indian tribes, inter-tribal consortiums, Tribal organizations, and the heads of other Federal agencies, the Secretary may carry out water-related planning activities, or activities relating to the study, design, and construction of water resources development projects, that— (A) will substantially benefit Indian tribes, inter-tribal consortiums, or Tribal organizations; and (B) are located primarily within Indian country (as defined in section 1151 of title 18, and including lands that are within the jurisdictional area of an Oklahoma Indian tribe, as determined by the Secretary of the Interior, and are recognized by the Secretary of the Interior as eligible for trust land status under part 151 of title 25, Code of Federal Regulations) or in proximity to Alaska Native villages. (2) Authorized activities An activity conducted under paragraph (1) may address— (A) projects for flood or hurricane and storm damage reduction, including erosion control and stormwater management (including management of stormwater that flows at a rate of less than 800 cubic feet per second for the 10-percent flood), environmental restoration and protection, and preservation of cultural and natural resources; (B) watershed assessments and planning activities; (C) technical assistance to an Indian Tribe, an inter-tribal consortium, or a Tribal organization, including— (i) assistance for planning to ameliorate flood hazards, to avoid repetitive flood impacts, to anticipate, prepare, and adapt to changing hydrological and climatic conditions and extreme weather events, and to withstand, respond to, and recover rapidly from disruption due to flood hazards; and (ii) the provision of, and integration into planning of, hydrologic, economic, and environmental data and analyses; (D) projects that improve emergency response capabilities and provide increased access to infrastructure that may be utilized in the event of a severe weather event or other natural disaster; and (E) such other projects as the Secretary, in cooperation with Indian Tribes, inter-tribal consortiums, Tribal organizations, and the heads of other Federal agencies, determines to be appropriate. (3) Feasibility study and reports (A) In general On the request of an Indian tribe, an inter-tribal consortium, or a Tribal organization, the Secretary shall conduct a study on, and provide to the Indian tribe, inter-tribal consortium, or Tribal organization a report describing, the feasibility of a water resources development project described in paragraph (1). (B) Recommendation A report under subparagraph (A) may, but shall not be required to, contain a recommendation on a specific water resources development project. (C) Initial costs The first $200,000 of the costs of a study under this section shall be at Federal expense. (4) Design and construction (A) In general The Secretary may carry out the design and construction of a water resources development project, or separable element of a project, described in paragraph (1) that the Secretary determines is feasible if the Federal share of the cost of the project or separable element is not more than $28,500,000. (B) Specific authorization If the Federal share of the cost of the project or separable element described in subparagraph (A) is more than $26,000,000, the Secretary may only carry out the project or separable element if Congress enacts a law authorizing the Secretary to carry out the project or separable element. (5) Project justification Notwithstanding an...20 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2282 Feasibility reports Amends
33 U.S.C. § 2282
The law today
(a) Preparation of reports (1) In general In the case of any water resources project-related study authorized to be undertaken by the Secretary that results in recommendations concerning a project or the operation of a project and that requires specific authorization by Congress in law or otherwise, the Secretary shall prepare a feasibility report, subject to section 2215 of this title. (2) Contents of feasibility reports A feasibility report shall describe, with reasonable certainty, the economic, environmental, and social benefits and detriments of the recommended plan and alternative plans considered by the Secretary and the engineering features (including hydrologic and geologic information), the public acceptability, and the purposes, scope, and scale of the recommended plan. A feasibility report shall also include the views of other Federal agencies and non-Federal agencies with regard to the recommended plan, a description of a nonstructural alternative to the recommended plan when such plan does not have significant nonstructural features, and a description of the Federal and non-Federal participation in such plan, and shall demonstrate that States, other non-Federal interests, and Federal agencies have been consulted in the development of the recommended plan. A feasibility report shall include a preliminary analysis of the Federal interest and the costs, benefits, and environmental impacts of the project. (3) Applicability This subsection shall not apply to— (A) any study with respect to which a report has been submitted to Congress before November 17, 1986; (B) any study for a project, which project is authorized for construction by this Act and is not subject to section 903(b); 1 (C) any study for a project which does not require specific authorization by Congress in law or otherwise; and (D) general studies not intended to lead to recommendation of a specific water resources project. (4) Feasibility report defined In this subsection, the term “feasibility report” means each feasibility report, and any associated environmental impact statement and mitigation plan, prepared by the Corps of Engineers for a water resources project. The term includes a project implementation report prepared under title VI of the Water Resources Development Act of 2000 (114 Stat. 2680–2694), a general reevaluation report, and a limited reevaluation report. (b) Federal interest determination (1) In general (A) Identification As part of the submission of a work plan to Congress pursuant to the joint explanatory statement for an annual appropriations Act or as part of the submission of a spend plan to Congress for a supplemental appropriations Act under which the Corps of Engineers receives funding, the Secretary shall identify the studies in the plan— (i) for which the Secretary plans to prepare a feasibility report under subsection (a) that will benefit— (I) an economically disadvantaged community (as defined by the Secretary under section 160 of the Water Resources Development Act of 2020 (33 U.S.C. 2201 note)); or (II) a community other than a community described in subclause (I); and (ii) that are designated as a new start under the work plan. (B) Determination (i) In general After identifying the studies under subparagraph (A) and subject to subparagraph (C), the Secretary shall, with the consent of the applicable non-Federal interest for the study, first determine the Federal interest in carrying out the study and the projects that may be proposed in the study. (ii) Feasibility cost share agreement The Secretary may make a determination under clause (i) prior to the execution of a feasibility cost share agreement between the Secretary and the non-Federal interest. (C) Limitation For each fiscal year, the Secretary may not make a determination under subparagraph (B) for more than 20 studies identified under subparagraph (A)(i)(II). (D) Application (i) In general Subject to clause (ii) and with the consent of the non-Federal intere...10 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2282c Vertical integration and acceleration of studies Amends
33 U.S.C. § 2282c
The law today
(a) In general To the extent practicable, a feasibility study initiated by the Secretary, after June 10, 2014, under section 2282(a) of this title shall— (1) result in the completion of a final feasibility report not later than 4 years after the date on which the Secretary determines the Federal interest for purposes of the report pursuant to section 2282(b) of this title; (2) have a maximum total cost of $5,000,000; and (3) ensure that personnel from the district, division, and headquarters levels of the Corps of Engineers concurrently conduct the review required under that section. (b) Extension If the Secretary determines that a feasibility study described in subsection (a) will not be conducted in accordance with subsection (a), the Secretary, not later than 30 days after the date of making the determination, shall— (1) prepare an updated feasibility study schedule and cost estimate; (2) notify the non-Federal feasibility cost-sharing partner that the feasibility study has been delayed; and (3) provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives as to the reasons the requirements of subsection (a) are not attainable. (c) Exception (1) In general The Secretary may extend the timeline of a study by a period not to exceed 3 years, if the Secretary determines that the feasibility study is too complex to comply with the requirements of subsection (a). (2) Factors In making a determination that a study is too complex to comply with the requirements of subsection (a), the Secretary shall consider— (A) the type, size, location, scope, and overall cost of the project; (B) whether the project will use any innovative design or construction techniques; (C) whether the project will require significant action by other Federal, State, or local agencies; (D) whether there is significant public dispute as to the nature or effects of the project; and (E) whether there is significant public dispute as to the economic or environmental costs or benefits of the project. (3) Notification Each time the Secretary makes a determination under this subsection, the Secretary shall provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives as to the results of that determination, including an identification of the specific 1 or more factors used in making the determination that the project is complex. (d) Reviews Not later than 90 days after the date of the initiation of a study described in subsection (a) for a project, the Secretary shall— (1) take all steps necessary to initiate the process for completing federally mandated reviews that the Secretary is required to complete as part of the study, including the environmental review process under section 1005; (2) convene a meeting of all Federal, tribal, and State agencies identified under section 2348(e) of this title that may be required by law to conduct or issue a review, analysis, or opinion on or to make a determination concerning a permit or license for the study; and (3) take all steps necessary to provide information that will enable required reviews and analyses related to the project to be conducted by other agencies in a thorough and timely manner. (e) Interim report Not later than 18 months after June 10, 2014, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that describes— (1) the status of the implementation of the planning process under this section, including the number of participating projects; (2) a review of project delivery schedules, including a description of any delays on those studies participating in the planning process under this section; and (3) any recommendations for additi...8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2282d Annual report to Congress Amends
33 U.S.C. § 2282d
The law today
(a) In general Not later than February 1 of each year, the Secretary shall develop and submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives an annual report, to be entitled “Report to Congress on Future Water Resources Development”, that identifies the following: (1) Feasibility reports Each feasibility report that meets the criteria established in subsection (c)(1)(A). (2) Proposed feasibility studies Any proposed feasibility study submitted to the Secretary by a non-Federal interest pursuant to subsection (b) that meets the criteria established in subsection (c)(1)(A). (3) Proposed modifications Any proposed modification to an authorized water resources development project or feasibility study that meets the criteria established in subsection (c)(1)(A) that— (A) is submitted to the Secretary by a non-Federal interest pursuant to subsection (b); or (B) is identified by the Secretary for authorization. (4) Programmatic modifications Any programmatic modification for an environmental infrastructure assistance program. (b) Requests for proposals (1) Publication Not later than May 1 of each year, the Secretary shall publish in the Federal Register a notice requesting proposals from non-Federal interests for proposed feasibility studies, proposed modifications to authorized water resources development projects and feasibility studies, and proposed modifications for an environmental infrastructure program to be included in the annual report. (2) Deadline for requests The Secretary shall include in each notice required by this subsection a requirement that non-Federal interests submit to the Secretary any proposals described in paragraph (1) by not later than 120 days after the date of publication of the notice in the Federal Register in order for the proposals to be considered for inclusion in the annual report. (3) Notification On the date of publication of each notice required by this subsection, the Secretary shall— (A) make the notice publicly available, including on the Internet; and (B) provide written notification of the publication to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives. (c) Contents (1) Feasibility reports, proposed feasibility studies, and proposed modifications (A) Criteria for inclusion in report The Secretary shall include in the annual report only those feasibility reports, proposed feasibility studies, and proposed modifications to authorized water resources development projects and feasibility studies that— (i) are related to the missions and authorities of the Corps of Engineers; (ii) require specific congressional authorization, including by an Act of Congress; (iii) have not been congressionally authorized; (iv) have not been included in any previous annual report; and (v) if authorized, could be carried out by the Corps of Engineers. (B) Description of benefits (i) Description The Secretary shall describe in the annual report, to the extent applicable and practicable, for each proposed feasibility study and proposed modification to an authorized water resources development project or feasibility study included in the annual report, the benefits, as described in clause (ii), of each such study or proposed modification (including the water resources development project that is the subject of the proposed feasibility study or the proposed modification to an authorized feasibility study). (ii) Benefits The benefits (or expected benefits, in the case of a proposed feasibility study) described in this clause are benefits to— (I) the protection of human life and property; (II) improvement to transportation; (III) the national, regional, or local economy; (IV) the environment; or (V) the national security interests of the United States. (C) Identification of other factors The Secretary shall identify in th...10 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2310 Cost sharing for Territories and Indian tribes Amends
33 U.S.C. § 2310 — at 2310(b)
The law today
(a) In general The Secretary shall waive local cost-sharing requirements up to $200,000 for all studies and projects— (1) in American Samoa, Guam, the Northern Mariana Islands, the Virgin Islands, Puerto Rico, and the Trust Territory of the Pacific Islands; (2) for any Indian tribe or tribal organization (as those terms are defined in section 5304 of title 25); and (3) for any organization that— (A) is composed primarily of people who are— (i) recognized and defined under Federal law as indigenous people of the United States; and (ii) from a specific community; and (B) assists in the social, cultural, and educational development of such people in that community. (b) Inflation adjustment The Secretary shall adjust the dollar amount specified in subsection (a) on an annual basis for inflation. (c) Inclusion For purposes of this section, the term “study” includes a watershed assessment. (d) Application The Secretary shall apply the waiver amount described in subsection (a) to reduce only the non-Federal share of study and project costs.16 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2321b Expediting hydropower at Corps of Engineers facilities Amends
33 U.S.C. § 2321b
The law today
(a) Policy Congress declares that it is the policy of the United States that— (1) the development of non-Federal hydroelectric power at Corps of Engineers water resources development projects, including locks and dams, shall be given priority; (2) Corps of Engineers approval of non-Federal hydroelectric power at Corps of Engineers water resources development projects, including permitting required under section 408 of this title, shall be completed by the Corps of Engineers in a timely and consistent manner; and (3) approval of hydropower at Corps of Engineers water resources development projects shall in no way diminish the other priorities and missions of the Corps of Engineers, including authorized project purposes and habitat and environmental protection. (b) Implementation of policy The Secretary shall— (1) ensure that the policy described in subsection (a) is implemented nationwide in an efficient, consistent, and coordinated manner; and (2) assess opportunities— (A) to increase the development of hydroelectric power at existing water resources development projects of the Corps of Engineers with hydroelectric facilities; and (B) to develop new hydroelectric power at existing nonpowered water resources development projects of the Corps of Engineers. (c) Report Not later than 2 years after June 10, 2014, and biennially thereafter, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that, at a minimum, shall include— (1) a description of initiatives carried out by the Secretary to encourage the development of hydroelectric power by non-Federal entities at Corps of Engineers water resources development projects and to meet the requirements of subsection (b); (2) a list of all new hydroelectric power activities by non-Federal entities approved at Corps of Engineers water resources development projects in that fiscal year, including the length of time the Secretary needed to approve those activities; (3) a description of the status of each pending application from non-Federal entities for approval to develop hydroelectric power at Corps of Engineers water resources development projects; (4) a description of any benefits or impacts to the environment, recreation, or other uses associated with Corps of Engineers water resources development projects at which non-Federal entities have developed hydroelectric power in the previous fiscal year; and (5) the total annual amount of payments or other services provided to the Corps of Engineers, the Treasury, and any other Federal agency as a result of approved non-Federal hydropower projects at Corps of Engineers water resources development projects. (d) Reviewing hydropower at Corps of Engineers facilities (1) Definition of eligible non-Federal interest In this subsection, the term “eligible non-Federal interest” means a non-Federal interest that owns or operates an existing non-Federal hydropower facility at a Corps of Engineers water resources development project. (2) Evaluation (A) In general On the written request of an eligible non-Federal interest, the Secretary shall conduct an evaluation to consider operational changes at the applicable project to facilitate production of non-Federal hydropower, consistent with authorized project purposes. The Secretary shall solicit input from interested stakeholders as part of the evaluation. (B) Deadline Not later than 180 days after the date on which the Secretary receives a written request under subparagraph (A), the Secretary shall provide to the non-Federal interest a written response to inform the non-Federal interest— (i) that the Secretary has approved the request to conduct an evaluation; or (ii) of any additional information necessary for the Secretary to approve the request to conduct an evaluation. (3) Operational changes An operational change referred to in paragraph ...8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2324 Reduced pricing for certain water supply storage Amends
33 U.S.C. § 2324
The law today
(a) Provision of storage space If a low income community requests the Secretary to provide water supply storage space in a water resources development project operated by the Secretary and if the amount of space requested is available or could be made available through reallocation of water supply storage space in the project or through modifications to operation of the project, the Secretary may provide such space to the community at a price determined under subsection (c). (b) Maximum amount of storage space The maximum amount of water supply storage space which may be provided to a community under this section may not exceed an amount of water supply storage space sufficient to yield 3,000,000 gallons of water per day. (c) Price The Secretary shall provide water supply storage space under this section at a price which is the greater of— (1) the updated construction cost of the project allocated to provide such amount of water supply storage space or $100 per acre foot of storage space, whichever is less; and (2) the value of the benefits which are lost as a result of providing such water supply storage space. (d) Determinations For purposes of subsection (c), the determinations of updated construction costs and value of benefits lost shall be made by the Secretary on the basis of the most recent information available. (e) Inflation adjustment of dollar amount The $100 amount set forth in subsection (c) shall be adjusted annually by the Secretary for changes in the Consumer Price Index of All Urban Consumers published by the Bureau of Labor Statistics. (f) Non-Federal responsibilities Nothing in this section shall be construed as affecting the responsibility of non-Federal interests to provide operation and maintenance costs assigned to water supply storage provided under this section. (g) “Low income community” defined The term “low income community” means— (1) a community with a population of less than 20,000 which is located in a county with a per capita income less than the per capita income of two-thirds of the counties in the United States; or (2) a regional water system that serves a population of less than 100,000, for which the per capita income is less than the per capita income of not less than 50 percent of the counties in the United States.2 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2326 Regional sediment management Amends
33 U.S.C. § 2326 — at 2326(d)
The law today
(a) In general (1) Sediment use (A) Sediment from Federal water resources projects For sediment obtained through or used in the construction, operation, or maintenance of an authorized Federal water resources project, including a project authorized for flood control, the Secretary shall develop, at Federal expense, regional sediment management plans and carry out projects at locations identified in plans developed under this section, or identified jointly by the non-Federal interest and the Secretary, for use in the construction, repair, modification, or rehabilitation of projects, including projects for the beneficial use of dredged materials described in section 1122 of the Water Resources Development Act of 2016 (33 U.S.C. 2326 note),1 associated with Federal water resources projects for purposes listed in paragraph (3). (B) Sediment from other Federal sources and non-Federal sources For purposes of projects carried out under this section, the Secretary may include sediment from other Federal sources and non-Federal sources, subject to the requirement that any sediment obtained from a non-Federal source shall not be obtained at Federal expense. (2) Cooperation The Secretary shall develop plans under this subsection in cooperation with the appropriate Federal, State, regional, and local agencies. (3) Purposes for sediment use in projects The purposes of using sediment for the construction, repair, modification, or rehabilitation of Federal water resources projects are— (A) to reduce storm damage to property; (B) to protect, restore, and create aquatic and ecologically related habitats, including wetlands; and (C) to transport and place suitable sediment for the purposes of improving environmental conditions in marsh and littoral systems, stabilizing stream channels, enhancing shorelines, and supporting State and local risk management adaptation strategies. (4) Reducing costs To reduce or avoid Federal costs, the Secretary shall consider the beneficial use of dredged material in a manner that contributes to the maintenance of sediment resources in the nearby coastal system. (b) Secretarial findings Subject to subsection (c), projects carried out under subsection (a) may be carried out in any case in which the Secretary finds that— (1) the environmental, economic, and social benefits of the project, both monetary and nonmonetary, justify the cost of the project; and (2) the project will not result in environmental degradation. (c) Determination of project costs (1) Costs of construction (A) In general Costs associated with construction of a project under this section or identified in a regional sediment management plan shall be limited solely to construction costs that are in excess of the costs necessary to carry out the dredging for construction, operation, or maintenance of an authorized Federal water resources project in the most cost-effective way, consistent with economic, engineering, and environmental criteria. (B) Cost sharing (i) In general Except as provided in clause (ii), the non-Federal share of the construction cost of a project under this section shall be determined as provided in subsections (a) through (d) of section 2213 of this title. (ii) Special rule Construction of a project under this section for one or more of the purposes of protection, restoration, or creation of aquatic and ecologically related habitat, the cost of which does not exceed $750,000 and which is located in a disadvantaged community as determined by the Secretary, may be carried out at Federal expense. (C) Total cost The total Federal costs associated with construction of a project under this section may not exceed $15,000,000. (2) Operation, maintenance, replacement, and rehabilitation costs Operation, maintenance, replacement, and rehabilitation costs associated with a project under this section are the responsibility of the non-Federal interest. (d) Selection of dredged material disposal method for purposes related to environmental...10 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2326a Dredged material disposal facility partnerships Amends
33 U.S.C. § 2326a — at 2326a(a)
The law today
(a) Additional capacity or replacement capacity (1) Provided by Secretary (A) In general Subject to subparagraph (B), at the request of a non-Federal interest with respect to a project, the Secretary may— (i) provide additional capacity at a dredged material disposal facility constructed by the Secretary beyond the capacity that would be required for project purposes; or (ii) permit the use of dredged material disposal facility capacity required for project purposes by the non-Federal interest if the Secretary determines that replacement capacity can be constructed at the facility or another facility or site before such capacity is needed for project purposes. (B) Agreement Before the Secretary takes an action under subparagraph (A), the non-Federal interest shall agree to pay— (i) all costs associated with the construction of the additional capacity or replacement capacity in advance of construction of such capacity; and (ii) in the case of use by a non-Federal interest of dredged material disposal capacity required for project purposes under subparagraph (A)(ii), any increase in the cost of operation and maintenance of the project that the Secretary determines results from the use of the project capacity by the non-Federal interest in advance of each cycle of dredging. (C) Credit In the event the Secretary determines that the cost to operate or maintain the project decreases as a result of use by the non-Federal interest of dredged material disposal capacity required for project purposes under subparagraph (A)(ii), the Secretary, at the request of the non-Federal interest, shall credit the amount of the decrease toward any cash contribution of the non-Federal interest required thereafter for construction, operation, or maintenance of the project, or of another navigation project. (2) Cost recovery authority The non-Federal interest may recover the costs assigned to the additional capacity under paragraph (1)(A)(i) through fees assessed on third parties whose dredged material is deposited at the facility and who enter into agreements with the non-Federal interest for the use of the facility. The amount of such fees may be determined by the non-Federal interest. (3) Special rule for designation of replacement capacity facility or site (A) In general Subject to such terms and conditions as the Secretary determines to be necessary or advisable, an agreement under paragraph (1)(B) for use permitted under paragraph (1)(A)(ii) shall reserve to the non-Federal interest— (i) the right to submit to the Secretary for approval at a later date an alternative to the facility or site designated in the agreement for construction of replacement capacity; and (ii) the right to construct the replacement capacity at the alternative facility or site at the expense of the non-Federal interest. (B) Requirement The Secretary shall not reject a site for the construction of replacement capacity under paragraph (1)(A)(ii) that is submitted by the non-Federal interest for approval by the Secretary before the date of execution of the agreement under paragraph (1)(B), or thereafter, unless the Secretary— (i) determines that the site is environmentally unacceptable, geographically unacceptable, or technically unsound; and (ii) provides a written basis for the determination under clause (i) to the non-Federal interest. (4) Public comment The Secretary shall afford the public an opportunity to comment on the determinations required under this subsection for a use permitted under paragraph (1)(A)(ii). (b) Non-Federal use of disposal facilities (1) In general (A) Non-Federal use The Secretary— (i) at the request of a non-Federal entity, may permit the use of any dredged material disposal facility under the jurisdiction of, or managed by, the Secretary by the non-Federal entity if the Secretary determines that such use will not reduce the availability of the facility for the authorized water resources development project on a channel in the vicinity of the ...5 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2326b Sediment management Amends
33 U.S.C. § 2326b
The law today
(a) In general The Secretary may enter into cooperation agreements with non-Federal interests with respect to navigation projects, or other appropriate non-Federal entities, for the development of long-term management strategies for controlling sediments at such projects. (b) Contents of strategies Each strategy developed under subsection (a) shall— (1) include assessments of sediment rates and composition, sediment reduction options, dredging practices, long-term management of any dredged material disposal facilities, remediation of such facilities, and alternative disposal and reuse options; (2) include a timetable for implementation of the strategy; and (3) incorporate relevant ongoing planning efforts, including remedial action planning, dredged material management planning, harbor and waterfront development planning, and watershed management planning. (c) Consultation In developing strategies under subsection (a), the Secretary shall consult with interested Federal agencies, States, and Indian tribes and provide an opportunity for public comment. (d) Dredged material disposal (1) Study The Secretary shall conduct a study to determine the feasibility of constructing and operating an underwater confined dredged material disposal site in the Port of New York-New Jersey that could accommodate as much as 250,000 cubic yards of dredged material for the purpose of demonstrating the feasibility of an underwater confined disposal pit as an environmentally suitable method of containing certain sediments. (2) Report The Secretary shall transmit to Congress a report on the results of the study conducted under paragraph (1), together with any recommendations of the Secretary that may be developed in a strategy under subsection (a). (e) Great Lakes tributary model (1) In general In consultation and coordination with the Great Lakes States, the Secretary shall develop a tributary sediment transport model for each major river system or set of major river systems depositing sediment into a Great Lakes federally authorized commercial harbor, channel maintenance project site, or Area of Concern identified under the Great Lakes Water Quality Agreement of 1978. Such model may be developed as a part of a strategy developed under subsection (a). (2) Requirements for models In developing a tributary sediment transport model under this subsection, the Secretary shall build on data and monitoring information generated in earlier studies and programs of the Great Lakes and their tributaries. (3) Report Not later than December 31, 2003, the Secretary shall transmit to Congress a report on the Secretary’s activities under this subsection. (f) “Great Lakes States” defined In this section, the term “Great Lakes States” means the States of Illinois, Indiana, Michigan, Minnesota, New York, Ohio, Pennsylvania, and Wisconsin. (g) Coastal mapping The Secretary shall develop and carry out a plan for the recurring mapping of coastlines that are experiencing rapid change, including such coastlines in— (1) Alaska; (2) Hawaii; and (3) any territory or possession of the United States. (h) Authorization of appropriations (1) In general There is authorized to be appropriated to the Secretary to carry out this section $5,000,000 for each of fiscal years 1998 through 2001. (2) Great Lakes tributary model In addition to amounts made available under paragraph (1), there is authorized to be appropriated to carry out subsection (e) $5,000,000 for each of fiscal years 2002 through 2012. (3) Coastal mapping In addition to amounts made available under paragraph (1), there is authorized to be appropriated to carry out subsection (g) with respect to Alaska, Hawaii, and the territories and possessions of the United States, $10,000,000, to remain available until expended.2 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2330 Aquatic ecosystem restoration Amends
33 U.S.C. § 2330
The law today
(a) General authority (1) In general The Secretary may carry out a project to restore and protect an aquatic ecosystem or estuary if the Secretary determines that the project— (A) (i) will improve the quality of the environment and is in the public interest; or (ii) will improve the elements and features of an estuary (as defined in section 2902 of this title); and (B) is cost-effective. (2) Dam removal A project under this section may include removal of a dam. (3) Anadromous fish habitat and passage (A) Measures A project under this section may include measures to improve habitat or passage for anadromous fish, including— (i) installing fish bypass structures on small water diversions; (ii) modifying tide gates; and (iii) restoring or reconnecting floodplains and wetlands that are important for anadromous fish habitat or passage. (B) Benefits A project that includes measures under this paragraph shall be formulated to maximize benefits for the anadromous fish species benefitted by the project. (4) Drought resilience A project under this section may include measures that enhance drought resilience through the restoration of wetlands or the removal of invasive species. (b) Cost sharing (1) In general Non-Federal interests shall provide 35 percent of the cost of construction of any project carried out under this section, including provision of all lands, easements, rights-of-way, and necessary relocations. (2) Form Before October 1, 2003, the Federal share of the cost of a project under this section may be provided in the form of reimbursements of project costs. (3) Anadromous fish Notwithstanding paragraph (1), for projects carried out under subsection (a)(3), the non-Federal interest shall provide 15 percent of the cost of construction, including provision of all lands, easements, rights-of-way, and necessary relocations. (c) Agreements (1) In general Construction of a project under this section shall be initiated only after a non-Federal interest has entered into a binding agreement with the Secretary to pay the non-Federal share of the costs of construction required by this section and to pay 100 percent of any operation, maintenance, and replacement and rehabilitation costs with respect to the project in accordance with regulations prescribed by the Secretary. (2) Nonprofit entities Notwithstanding section 1962d–5b of title 42, for any project carried out under this section, a non-Federal interest may include a nonprofit entity, with the consent of the affected local government. (d) Cost limitation Not more than $15,000,000 in Federal funds may be allotted under this section for a project at any single locality. (e) Use of natural and nature-based features In carrying out a project to restore and protect an aquatic ecosystem or estuary under subsection (a), the Secretary shall consider, and may include, with the consent of the non-Federal interest, a natural feature or nature-based feature, as such terms are defined in section 2289a of this title, if the Secretary determines that inclusion of such features is consistent with the requirements of subsection (a). (f) Funding There is authorized to be appropriated to carry out this section $75,000,000 for each fiscal year. (g) Prioritization The Secretary shall give projects that include measures described in subsection (a)(3) equal priority for implementation as other projects under this section.12 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2336 Abandoned and inactive noncoal mine restoration Amends
33 U.S.C. § 2336 — at 2336(f)
The law today
(a) In general The Secretary may provide technical, planning, and design assistance to Federal and non-Federal interests for carrying out projects to address water quality problems caused by drainage and related activities from abandoned and inactive noncoal mines. (b) Specific measures Assistance provided under subsection (a) may be in support of projects for the purposes of— (1) managing drainage from abandoned and inactive noncoal mines; (2) restoring and protecting streams, rivers, wetlands, other waterbodies, and riparian areas degraded by drainage from abandoned and inactive noncoal mines; and (3) demonstrating management practices and innovative and alternative treatment technologies to minimize or eliminate adverse environmental effects associated with drainage from abandoned and inactive noncoal mines. (c) Non-Federal share The non-Federal share of the cost of assistance under subsection (a) shall be 50 percent, except that the Federal share with respect to projects located on land owned by the United States, on land held in trust by the Secretary of the Interior on behalf of, and for the benefit of, an Indian Tribe, or on restricted land of any Indian Tribe, shall be 100 percent. (d) Effect on authority of Secretary of the Interior Nothing in this section affects the authority of the Secretary of the Interior under title IV of the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. 1231 et seq.). (e) Technology database for reclamation of abandoned mines The Secretary may provide assistance to non-Federal and nonprofit entities to develop, manage, and maintain a database of conventional and innovative, cost-effective technologies for reclamation of abandoned and inactive noncoal mine sites. Such assistance shall be provided through the Restoration of Abandoned Mine Sites Program managed by the Albuquerque District Office of the Corps of Engineers. (f) Authorization of appropriations There is authorized to be appropriated to carry out this section $50,000,000.8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
National levee safety program · 33 U.S.C. ch. 46 1 section
-
§ 3303 Inventory and inspection of levees Amends
33 U.S.C. § 3303
The law today
(a) Levee database (1) In general Not later than 1 year after December 16, 2016, the Secretary shall establish and maintain a database with an inventory of the Nation’s levees. (2) Contents The database shall include— (A) location information of all Federal levees in the Nation (including global information system information) and updated levee information provided by States, regional districts, Indian tribes, Federal agencies, and other entities; (B) utilizing such information as is available, the general condition of each levee; and (C) an estimate of the number of structures and population at risk and protected by each levee that would be adversely impacted if the levee fails or water levels exceed the height of the levee. (3) Availability of information (A) Availability to Federal, State, regional, tribal, and local governmental agencies The Secretary shall make all of the information in the database available to appropriate Federal, State, regional, tribal, and local governmental agencies. (B) Availability to the public The Secretary shall make the information in the database described in paragraph (2)(A), and such other information in the database as the Secretary determines appropriate, available to the public. (b) Inventory and inspection of levees (1) Federal levees The Secretary, at Federal expense, shall establish an inventory and conduct an inspection of all federally owned and operated levees. (2) Federally constructed, nonfederally operated and maintained levees The Secretary shall establish an inventory and conduct an inspection of all federally constructed, non-federally operated and maintained levees, at the original cost share for the project. (3) Participating levees For non-Federal levees the owners of which are participating in the emergency response to natural disasters program established under section 701n of this title, the Secretary shall establish an inventory and conduct an inspection of each such levee if the owner of the levee requests such inspection. The Federal share of the cost of an inspection under this paragraph shall be 65 percent. (c) Levee review (1) In general The Secretary shall carry out a one-time inventory and review of all levees identified in the national levee database. (2) No Federal interest The inventory and inspection under paragraph (1) does not create a Federal interest in the construction, operation, or maintenance of any levee that is included in the inventory or inspected under this subsection. (3) Review criteria In carrying out the inventory and review, the Secretary shall use the levee safety action classification criteria to determine whether a levee should be classified in the inventory as requiring a more comprehensive inspection. (4) State, regional, and tribal participation At the request of a State, regional district, or Indian tribe with respect to any levee subject to review under this subsection, the Secretary shall— (A) allow an official of the State, regional district, or Indian tribe to participate in the review of the levee; and (B) provide information to the State, regional district, or Indian tribe relating to the location, construction, operation, or maintenance of the levee. (5) Exceptions In carrying out the inventory and review under this subsection, the Secretary shall not be required to review any levee that has been inspected by a State, regional district, or Indian tribe using the same methodology described in paragraph (3) during the 1-year period immediately preceding June 10, 2014, if the Governor of the State or chief executive of the regional district or tribal government, as applicable, requests an exemption from the review. (d) Identification of deficiencies (1) In general For each levee included in an inventory established under subsection (b) or for which the Secretary has conducted a review under subsection (c), the Secretary shall— (A) identify the specific engineering and maintenance deficiencies, if any; and (B) describe the reco...7 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
National flood insurance · 42 U.S.C. ch. 50 1 section
-
§ 4131 Levee certifications Amends
42 U.S.C. § 4131
The law today
(a) Implementation of Flood Protection Structure Accreditation Task Force In carrying out section 100226 of Public Law 112–141 (42 U.S.C. 4101 note; 126 Stat. 942), the Secretary shall— (1) ensure that at least 1 program activity carried out for levee systems under the levee safety and dam safety programs of the Corps of Engineers provides adequate information to the Secretary to reach a levee accreditation decision under section 65.10 of title 44, Code of Federal Regulations (or successor regulation); (2) to the maximum extent practicable, carry out the activities referred to in paragraph (1) in alignment with the schedule established for the national flood insurance program established under chapter I of the National Flood Insurance Act of 1968 (42 U.S.C. 4011 et seq.); and (3) in the case of a levee system that is operated and maintained by the Corps of Engineers, to the maximum extent practicable, cooperate with local governments seeking a levee accreditation decision for the levee to provide information necessary to support the accreditation decision in a timely manner. (b) Accelerated levee system evaluations (1) In general On receipt of a request from a non-Federal interest, the Secretary may carry out a levee system evaluation of a federally authorized levee for purposes of the national flood insurance program established under chapter 1 1 of the National Flood Insurance Act of 1968 (42 U.S.C. 4011 et seq.) if the evaluation will be carried out earlier than such an evaluation would be carried out under subsection (a). (2) Requirements A levee system evaluation under paragraph (1) shall— (A) at a minimum, comply with section 65.10 of title 44, Code of Federal Regulations (as in effect on June 10, 2014); and (B) be carried out in accordance with such procedures as the Secretary, in consultation with the Administrator of the Federal Emergency Management Agency, may establish. (3) Funding (A) In general The Secretary may use amounts made available under section 1962d–16 of this title to carry out this subsection. (B) Cost share The Secretary shall apply the cost share under section 1962d–16(b) of this title to any activities carried out under this subsection. (C) Contributed funds Notwithstanding subparagraph (B), a non-Federal interest may fund up to 100 percent of the cost of any activity carried out under this subsection.4 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Reclamation and irrigation of lands by federal government · 43 U.S.C. ch. 12 1 section
-
§ 390b-2 Leveraging Federal infrastructure for increased water supply Amends
43 U.S.C. § 390b-2 — at 390b-2(i)
The law today
(a) In general At the request of a non-Federal interest, the Secretary may review proposals to increase the quantity of available supplies of water at a Federal water resources development project through— (1) modification of the project; (2) modification of how the project is managed; or (3) accessing water released from the project. (b) Proposals included A proposal under subsection (a) may include— (1) increasing the storage capacity of the project; (2) diversion of water released or withdrawn from the project— (A) to recharge groundwater; (B) to aquifer storage and recovery; or (C) to any other storage facility; (3) construction of facilities for delivery of water from pumping stations constructed by the Secretary; (4) construction of facilities to access water; and (5) a combination of the activities described in paragraphs (1) through (4). (c) Exclusions This section shall not apply to a proposal that— (1) reallocates existing water supply or hydropower storage; or (2) reduces water available for any authorized project purpose. (d) Other Federal projects In any case in which a proposal relates to a Federal project that is not operated by the Secretary, this section shall apply only to activities under the authority of the Secretary. (e) Review process (1) Notice On receipt of a proposal submitted under subsection (a), the Secretary shall provide a copy of the proposal to each entity described in paragraph (2) and, if applicable, the Federal agency that operates the project, in the case of a project operated by an agency other than the Department of the Army. (2) Public participation In reviewing proposals submitted under subsection (a), and prior to making any decisions regarding a proposal, the Secretary shall comply with all applicable public participation requirements under law, including consultation with— (A) affected States; (B) power marketing administrations, in the case of reservoirs with Federal hydropower projects; (C) entities responsible for operation and maintenance costs; (D) any entity that has a contractual right from the Federal Government or a State to withdraw water from, or use storage at, the project; (E) entities that the State determines hold rights under State law to the use of water from the project; and (F) units of local government with flood risk reduction responsibilities downstream of the project. (f) Authorities A proposal submitted to the Secretary under subsection (a) may be reviewed and approved, if applicable and appropriate, under— (1) the specific authorization for the water resources development project; (2) section 549a of title 33; (3) section 390b of this title; and (4) section 408 of title 33. (g) Limitations The Secretary shall not approve a proposal submitted under subsection (a) that— (1) is not supported by the Federal agency that operates the project, if that agency is not the Department of the Army; (2) interferes with an authorized purpose of the project; (3) adversely impacts contractual rights to water or storage at the reservoir; (4) adversely impacts legal rights to water under State law, as determined by an affected State; (5) increases costs for any entity other than the entity that submitted the proposal; or (6) if a project is subject to section 390b(e) of this title, makes modifications to the project that do not meet the requirements of that section unless the modification is submitted to and authorized by Congress. (h) Cost share (1) In general Except as provided in paragraph (2), 100 percent of the cost of developing, reviewing, and implementing a proposal submitted under subsection (a) shall be provided by an entity other than the Federal Government. (2) Planning assistance to states In the case of a proposal from an entity authorized to receive assistance under section 1962d–16 of title 42, the Secretary may use funds available under that section to pay 50 percent of the cost of a review of a proposal submitted under subsection (a). (3) Operation and main...5 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Also cites: 10 U.S.C. § 2667, 10 U.S.C. § 2696, 16 U.S.C. § 460d, 16 U.S.C. § 4724, 25 U.S.C. § 5304, 31 U.S.C. § 1105, 33 U.S.C. § 401, 33 U.S.C. § 403, 33 U.S.C. § 408, 33 U.S.C. § 426g, 33 U.S.C. § 426i, 33 U.S.C. § 549a and 48 more
Compared against current U.S. Code AI-generated reading aid — verify against the official bill.
The bill adds provisions to the budgetary treatment of the Harbor Maintenance Trust Fund by amending existing language in the Balanced Budget and Emergency Deficit Control Act.
-
2 U.S.C. 901
(H) Harbor maintenance activities.--If, for any fiscal year, appropriations for the Construction, Mississippi River and Tributaries, and Operation and Maintenance accounts of the Corps of Engineers are enacted that are derived from the Harbor Maintenance Trust Fund established under section 9505(a) of the Internal Revenue Code of 1986 and that the Congress designates in statute as being for harbor operations and maintenance activities, then the adjustment for that fiscal year shall be the total of such appropriations that are derived from such Fund and designated as being for harbor operations and maintenance activities, but shall not exceed the sum of-- (i) the amount deposited.
This new provision specifies how appropriations from the Harbor Maintenance Trust Fund should be treated in relation to the federal budget and provides restrictions on the amount that can be adjusted.
Action History
-
Message on House action received in Senate and at desk: House amendments to Senate bill.
-
Mr. DeFazio moved to suspend the rules and pass the bill, as amended.
-
Considered under suspension of the rules. (consideration: CR H6935-6984)
-
DEBATE - The House proceeded with forty minutes of debate on S. 1811.
-
Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote.
-
On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote. (text: CR H6935-6977)
-
Motion to reconsider laid on the table Agreed to without objection.
-
The title of the measure was amended. Agreed to without objection.
-
Referred to the Subcommittee on Water, Oceans, and Wildlife.
-
Referred to the Subcommittee on Water Resources and Environment.
-
Message on Senate action sent to the House.
-
Received in the House.
-
Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
-
Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
-
Senate Committee on Environment and Public Works discharged by Unanimous Consent.(consideration: CR S4776)
-
Senate Committee on Environment and Public Works discharged by Unanimous Consent. (consideration: CR S4776)
-
Passed/agreed to in Senate: Passed Senate without amendment by Voice Vote.(text: CR S4776)
-
Passed Senate without amendment by Voice Vote. (text: CR S4776)
-
Introduced in Senate
-
Read twice and referred to the Committee on Environment and Public Works.
Sponsors
- John Barrasso · Primary
- Thomas R. Carper · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 1 co-sponsors · 548 not signed on
Sponsors (1)
- John Barrasso Republican
Co-sponsors (1)
- Thomas R. Carper Democratic
Not signed on (548)
548 members have not signed on to this bill.
Show all 548 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Frequently asked questions
- What does S 1811 do?
- Water Resources Development Act of 2020 This bill addresses water resources infrastructure funding as well as Army Corps of Engineers projects for navigation, flood risk management, and ecosystem restoration. The bill removes from annual discretionary spending limits funds appropriated from the Harbor Maintenance Trust Fund (HMTF) for harbor operations and maintenance purposes, up to a specified amount. This allows additional funds from the HMTF to be appropriated for these purposes without these amounts counting against annual discretionary spending limits. Similarly, the bill removes from annual discretionary spending limits in FY2021-FY2030 funds appropriated for harbor maintenance activities at certain donor ports or energy transfer ports, up to a specified amount. Further, the bill expands the eligible uses of HMTF funds to include maintenance dredging at certain emerging harbors. In addition, the bill modifies cost-sharing requirements for the construction of inland waterway navigation projects. The bill also establishes various pilot programs to address issues including flood risk management and hurricane and storm damage risk reduction in rural or economically disadvantaged communities. Additionally, the bill establishes programs for controlling certain invasive species. The bill also creates a process to deauthorize certain projects that are no longer viable for construction and authorizes new projects for purposes including navigation, flood risk management, and ecosystem restoration.
- Who sponsors S 1811?
- S 1811 is sponsored by John Barrasso (Republican) and Thomas R. Carper (Democratic).
- What is the current status of S 1811?
- This bill died with 116th Congress. It reached “Passed House” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track S 1811?
- Track S 1811 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 1811
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 1811
Last checked for changes 20 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →