United States 115th Congress Status: Died Sponsors 1 D

S 398 — A bill to direct the Secretary of the Army to provide for modification of certain Federal water resources development projects on the Apalachicola, Chattahoochee, and Flint Rivers, and for other purposes.

Last action — Read twice and referred to the Committee on Environment and Public Works.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 115th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

This bill directs the U.S. Army Corps of Engineers to operate the federal water resources projects on the Apalachicola, Chattahoochee, and Flint Rivers in Alabama, Florida, and Georgia in a manner that ensures the maintenance of freshwater flows. The term "freshwater flows" is defined as the quality, quantity, timing, and variability of freshwater flows required to: (1) support and reestablish the ecological integrity of the rivers, commercial and recreational fisheries dependent on freshwater flows into Apalachicola Bay and adjacent waters, and thriving and diverse fish, wildlife, and plant populations similar to those found prior to construction of the projects; (2) restore and recover species that are endangered, threatened, or at risk; and (3) prevent significantly harmful adverse impacts to the Chattahoochee and Apalachicola River ecosystems. The Corps of Engineers must enter into an arrangement for the National Oceanic and Atmospheric Administration (NOAA) to conduct a study that evaluates existing data related to freshwater flows and provides recommendations on how to maintain such flows. The Corps shall not issue a final water control manual based on the final environmental impact statement titled "Update of the Water Control Manual for the Apalachicola-Chattahoochee-Flint River Basin in Alabama, Florida, and Georgia and a Water Supply Storage Assessment," dated December 2016, but shall: (1) issue revised water control manuals for such projects that ensure the maintenance of freshwater flows, considering the findings of NOAA's study; (2) ensure that operational modifications needed to maintain freshwater flows are achieved while providing system-wide balance in conservation storage through the maintenance of water levels in the same action zone for each of the project reservoirs; (3) enter into an arrangement for the National Academy of Sciences to carry out an independent peer review of each revised manual; and (4) obtain written approval from the Environmental Protection Agency, the U.S. Fish and Wildlife Service, NOAA, and the U.S. Geological Survey of each manual developed before a final manual may be issued.

Bill Text

Sections of law this bill changes

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Also cites: 33 U.S.C. § 2343

Action History

  1. Introduced in Senate

  2. Read twice and referred to the Committee on Environment and Public Works.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 560 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (560)

560 members have not signed on to this bill.

Show all 560 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 398 do?
This bill directs the U.S. Army Corps of Engineers to operate the federal water resources projects on the Apalachicola, Chattahoochee, and Flint Rivers in Alabama, Florida, and Georgia in a manner that ensures the maintenance of freshwater flows. The term "freshwater flows" is defined as the quality, quantity, timing, and variability of freshwater flows required to: (1) support and reestablish the ecological integrity of the rivers, commercial and recreational fisheries dependent on freshwater flows into Apalachicola Bay and adjacent waters, and thriving and diverse fish, wildlife, and plant populations similar to those found prior to construction of the projects; (2) restore and recover species that are endangered, threatened, or at risk; and (3) prevent significantly harmful adverse impacts to the Chattahoochee and Apalachicola River ecosystems. The Corps of Engineers must enter into an arrangement for the National Oceanic and Atmospheric Administration (NOAA) to conduct a study that evaluates existing data related to freshwater flows and provides recommendations on how to maintain such flows. The Corps shall not issue a final water control manual based on the final environmental impact statement titled "Update of the Water Control Manual for the Apalachicola-Chattahoochee-Flint River Basin in Alabama, Florida, and Georgia and a Water Supply Storage Assessment," dated December 2016, but shall: (1) issue revised water control manuals for such projects that ensure the maintenance of freshwater flows, considering the findings of NOAA's study; (2) ensure that operational modifications needed to maintain freshwater flows are achieved while providing system-wide balance in conservation storage through the maintenance of water levels in the same action zone for each of the project reservoirs; (3) enter into an arrangement for the National Academy of Sciences to carry out an independent peer review of each revised manual; and (4) obtain written approval from the Environmental Protection Agency, the U.S. Fish and Wildlife Service, NOAA, and the U.S. Geological Survey of each manual developed before a final manual may be issued.
Who sponsors S 398?
S 398 is sponsored by Bill Nelson (Democratic).
What is the current status of S 398?
This bill died with 115th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 398?
Track S 398 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 398

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 398

Last checked for changes 21 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →