HR 4401 — Bridge Investment and Modernization Act of 2025
Last action — Referred to the Subcommittee on Highways and Transit.
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
2In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill is in committee in the House. Introduced July 15, 2025. It must pass committee before a floor vote.
Next likely step: a committee vote, then a floor vote in the House.
Summary
To amend title 23, United States Code, to reauthorize the bridge investment program, to remove certain considerations under the bridge investment program, and for other purposes.
Bill Text
- Introduced Introduced in House Current html July 15, 2025
Sections of law this bill changes
1 section in 1 lawFrom the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).
Federal-aid highways · 23 U.S.C. ch. 1 1 section
-
§ 124 Bridge investment program Amends
23 U.S.C. § 124 — at 124(c)(5)
The law today
(a) Definitions.— In this section: (1) Eligible project.— (A) In general.— The term “eligible project” means a project to replace, rehabilitate, preserve, or protect 1 or more bridges on the National Bridge Inventory under section 144(b). (B) Inclusions.— The term “eligible project” includes— (i) a bundle of projects described in subparagraph (A), regardless of whether the bundle of projects meets the requirements of section 144(j)(5); and (ii) a project to replace or rehabilitate culverts for the purpose of improving flood control and improved habitat connectivity for aquatic species. (2) Large project.— The term “large project” means an eligible project with total eligible project costs of greater than $100,000,000. (3) Program.— The term “program” means the bridge investment program established by subsection (b)(1). (b) Establishment of Bridge Investment Program.— (1) In general.— There is established a bridge investment program to provide financial assistance for eligible projects under this section. (2) Goals.— The goals of the program shall be— (A) to improve the safety, efficiency, and reliability of the movement of people and freight over bridges; (B) to improve the condition of bridges in the United States by reducing— (i) the number of bridges— (I) in poor condition; or (II) in fair condition and at risk of falling into poor condition within the next 3 years; (ii) the total person miles traveled over bridges— (I) in poor condition; or (II) in fair condition and at risk of falling into poor condition within the next 3 years; (iii) the number of bridges that— (I) do not meet current geometric design standards; or (II) cannot meet the load and traffic requirements typical of the regional transportation network; and (iv) the total person miles traveled over bridges that— (I) do not meet current geometric design standards; or (II) cannot meet the load and traffic requirements typical of the regional transportation network; and (C) to provide financial assistance that leverages and encourages non-Federal contributions from sponsors and stakeholders involved in the planning, design, and construction of eligible projects. (c) Grant Authority.— (1) In general.— In carrying out the program, the Secretary may award grants, on a competitive basis, in accordance with this section. (2) Grant amounts.— Except as otherwise provided, a grant under the program shall be— (A) in the case of a large project, in an amount that is— (i) adequate to fully fund the project (in combination with other financial resources identified in the application); and (ii) not less than $50,000,000; and (B) in the case of any other eligible project, in an amount that is— (i) adequate to fully fund the project (in combination with other financial resources identified in the application); and (ii) not less than $2,500,000. (3) Maximum amount.— Except as otherwise provided, for an eligible project receiving assistance under the program, the amount of assistance provided by the Secretary under this section, as a share of eligible project costs, shall be— (A) in the case of a large project, not more than 50 percent; and (B) in the case of any other eligible project, not more than 80 percent. (4) Federal share.— (A) Maximum federal involvement.— Federal assistance other than a grant under the program may be used to satisfy the non-Federal share of the cost of a project for which a grant is made, except that the total Federal assistance provided for a project receiving a grant under the program may not exceed the Federal share for the project under section 120. (B) Off-system bridges.— In the case of an eligible project for an off-system bridge (as defined in section 133(f)(1))— (i) Federal assistance other than a grant under the program may be used to satisfy the non-Federal share of the cost of a project; and (ii) notwithstanding subparagraph (A), the total Federal assistance provided for the project shall not exceed 90 percent of the total eligible project ...1 other bill also changes this section · Follow it → Official text at uscode.house.gov ↗
Compared against current U.S. Code AI-generated reading aid — verify against the official bill.
This bill reauthorizes the bridge investment program and removes certain considerations for grant awards.
-
23 U.S.C. § 124(c)(5)
subparagraph (B)This removes specific consideration factors for grant awards under the bridge investment program.
-
Section 11101(b)(1)(A) of the Infrastructure Investment and Jobs Act
``(i) the number and percentage of bridges within the same State as the eligible project that are in poor condition;``This deletes a consideration related to state bridges in poor condition from the bridge investment program's criteria.
-
Section 11101(b)(1)(A) of the Infrastructure Investment and Jobs Act
``(ii) the extent to which the eligible project demonstrates cost savings by bundling multiple bridge projects;``This deletes a consideration involving cost savings through bundling from the evaluation criteria.
-
Section 11101(b)(1)(A) of the Infrastructure Investment and Jobs Act
``(iii) geographic diversity among grant recipients, including the need for a balance between the needs of rural and urban communities;``This removes the geographical diversity consideration from the selection criteria.
-
Section 11101(b)(1)(A) of the Infrastructure Investment and Jobs Act
``(iv) the extent to which a bridge that would be assisted with a grant—``This initiates the removal of a set of considerations regarding specific bridge conditions from the program.
-
Section 11101(b)(1)(A) of the Infrastructure Investment and Jobs Act
``(v) the extent to which the eligible project demonstrates partnerships with other public and private entities, including the use of innovative financing mechanisms.``This deletes the consideration of partnerships and financing innovations from the grant award criteria.
-
Section 11101(b)(1)(A) of the Infrastructure Investment and Jobs Act
``(vi) the extent to which the eligible project would reduce Federal liability associated with underperforming bridges;``This removes consideration of Federal liability reduction from the selection process.
Action History
-
Referred to the Subcommittee on Highways and Transit.
-
Introduced in House
-
Introduced in House
-
Referred to the House Committee on Transportation and Infrastructure.
Sponsors
- Mike Ezell · Cosponsor
- Barry Moore · Cosponsor
- Zachary Nunn · Cosponsor
- Jr. Robert P. Bresnahan · Cosponsor
- Shomari Figures · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 4 co-sponsors · 534 not signed on
Sponsors (1)
- Shomari Figures Democratic
Co-sponsors (4)
- Mike Ezell Republican
- Barry Moore Republican
- Zachary Nunn Republican
- Robert P. Bresnahan, Jr. Republican
Not signed on (534)
534 members have not signed on to this bill.
Show all 534 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
Frequently asked questions
- What does HR 4401 do?
- To amend title 23, United States Code, to reauthorize the bridge investment program, to remove certain considerations under the bridge investment program, and for other purposes.
- Who sponsors HR 4401?
- HR 4401 is sponsored by Mike Ezell (Republican), Barry Moore (Republican), Zachary Nunn (Republican), Robert P. Bresnahan, Jr. (Republican), and Shomari Figures (Democratic).
- What is the current status of HR 4401?
- This bill is in committee in the House. Introduced July 15, 2025. It must pass committee before a floor vote.
- Where can I track HR 4401?
- Track HR 4401 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HR 4401
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HR 4401
Last checked for changes 17 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →