United States 119th Congress Status: Passed Senate Sponsors 2 R

S 1135 — A bill to amend the National Trails System Act to direct the Secretary of Agriculture to conduct a study on the feasibility of designating the Bonneville Shoreline Trail.

Last action — Message on Senate action sent to the House.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill has passed the Senate. Introduced March 26, 2025. It now moves to the second chamber.

Next likely step: consideration and a floor vote in the House.

In plain language

The bill directs a study on the Bonneville Shoreline Trail's designation feasibility.

This bill mandates a study to assess whether the Bonneville Shoreline Trail should be designated. The study will be overseen by the Secretary of Agriculture.

Summary

A bill to amend the National Trails System Act to direct the Secretary of the Interior to conduct a study on the feasibility of designating the Bonneville Shoreline Trail.

Bill Text

What changed in the latest version

29 added · 5 removed

Plain-language change summary

The bill now includes a provision that directs the Secretary of Agriculture to conduct a study on the feasibility of designating the Bonneville Shoreline Trail, a system of trails extending approximately 280 miles from the Idaho-Utah border to Nephi, Utah. The previous version did not specify the requirement for this study or detail the boundaries of the trail. This change clarifies the scope of the proposed study and establishes a clear direction for the Secretary of Agriculture regarding the Bonneville Shoreline Trail.

→
Previous
Latest
1135 Introduced in Senate (IS)] <DOC> 119th CONGRESS 1st Session S.
1135 Reported in Senate (RS)] <DOC> Calendar No.
473 119th CONGRESS 2d Session S.
which was read twice and referred to the Committee on Energy and Natural Resources _______________________________________________________________________ A BILL To amend the National Trails System Act to direct the Secretary of the Interior to conduct a study on the feasibility of designating the Bonneville Shoreline Trail.
which was read twice and referred to the Committee on Energy and Natural Resources July 23, 2026 Reported by Mr.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1.
Lee, with an amendment and an amendment to the title [Strike out all after the enacting clause and insert the part printed in italic] _______________________________________________________________________ A BILL To amend the National Trails System Act to direct the Secretary of the Interior to conduct a study on the feasibility of designating the Bonneville Shoreline Trail.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, <DELETED>SECTION 1.
BONNEVILLE SHORELINE TRAIL FEASIBILITY STUDY.</DELETED> <DELETED> Section 5(c) of the National Trails System Act (16 U.S.C.
1244(c)) is amended by adding at the end the following:</DELETED> <DELETED> ``(50) Bonneville shoreline trail.--The Bonneville Shoreline Trail, a system of trails and potential trails extending approximately 280 miles from the Idaho-Utah border to Nephi, Utah, following the Bonneville bench that was created by the historic Lake Bonneville.''.</DELETED> SECTION 1.
``(50) Bonneville shoreline trail.--The Bonneville Shoreline Trail, a system of trails and potential trails extending approximately 280 miles from the Idaho-Utah border to Nephi, Utah, following the Bonneville bench that was created by the historic Lake Bonneville.''.
``(50) Bonneville shoreline trail.-- ``(A) In general.--The Bonneville Shoreline Trail, a system of trails and potential trails extending approximately 280 miles from the Idaho-Utah border to Nephi, Utah, following the Bonneville bench that was created by the historic Lake Bonneville.
<all>
``(B) Requirement.--The study under this paragraph shall be conducted by the Secretary of Agriculture.''.
Amend the title so as to read:
``A bill to amend the National Trails System Act to direct the Secretary of Agriculture to conduct a study on the feasibility of designating the Bonneville Shoreline Trail.''.
Calendar No.
473 119th CONGRESS 2d Session S.
1135 _______________________________________________________________________ A BILL To amend the National Trails System Act to direct the Secretary of the Interior to conduct a study on the feasibility of designating the Bonneville Shoreline Trail.
_______________________________________________________________________ July 23, 2026 Reported with an amendment and an amendment to the title
View plain text versions (2)

Sections of law this bill changes

1 section in 1 law

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

National trails system · 16 U.S.C. ch. 27 1 section
  • § 1244 National scenic and national historic trails Amends

    16 U.S.C. § 1244 — at 1244(c)

    The law today

    (a) Establishment and designation; administration National scenic and national historic trails shall be authorized and designated only by Act of Congress. There are hereby established the following National Scenic and National Historic Trails: (1) The Appalachian National Scenic Trail, a trail of approximately two thousand miles extending generally along the Appalachian Mountains from Mount Katahdin, Maine, to Springer Mountain, Georgia. Insofar as practicable, the right-of-way for such trail shall comprise the trail depicted on the maps identified as “Nationwide System of Trails, Proposed Appalachian Trail, NST–AT–101–May 1967”, which shall be on file and available for public inspection in the office of the Director of the National Park Service. Where practicable, such rights-of-way shall include lands protected for it under agreements in effect as of October 2, 1968, to which Federal agencies and States were parties. The Appalachian Trail shall be administered primarily as a footpath by the Secretary of the Interior, in consultation with the Secretary of Agriculture. (2) The Pacific Crest National Scenic Trail, a trail of approximately two thousand three hundred fifty miles, extending from the Mexican-California border northward generally along the mountain ranges of the west coast States to the Canadian-Washington border near Lake Ross, following the route as generally depicted on the map, identified as “Nationwide System of Trails, Proposed Pacific Crest Trail, NST–PC–103–May 1967” which shall be on file and available for public inspection in the office of the Chief of the Forest Service. The Pacific Crest Trail shall be administered by the Secretary of Agriculture, in consultation with the Secretary of the Interior. (3) The Oregon National Historic Trail, a route of approximately two thousand miles extending from near Independence, Missouri, to the vicinity of Portland, Oregon, following a route as depicted on maps identified as “Primary Route of the Oregon Trail 1841–1848”, in the Department of the Interior’s Oregon Trail study report dated April 1977, and which shall be on file and available for public inspection in the office of the Director of the National Park Service. The trail shall be administered by the Secretary of the Interior. No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the trail except with the consent of the owner of the land or interest in land. The authority of the Federal Government to acquire fee title under this paragraph shall be limited to an average of not more than ¼ mile on either side of the trail. (4) The Mormon Pioneer National Historic Trail, a route of approximately one thousand three hundred miles extending from Nauvoo, Illinois, to Salt Lake City, Utah, following the primary historical route of the Mormon Trail as generally depicted on a map, identified as, “Mormon Trail Vicinity Map, figure 2” in the Department of the Interior Mormon Trail study report dated March 1977, and which shall be on file and available for public inspection in the office of the Director, National Park Service, Washington, D.C. The trail shall be administered by the Secretary of the Interior. No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the trail except with the consent of the owner of the land or interest in land. The authority of the Federal Government to acquire fee title under this paragraph shall be limited to an average of not more than ¼ mile on either side of the trail. (5) The Continental Divide National Scenic Trail, a trail of approximately thirty-one hundred miles, extending from the Montana-Canada border to the New Mexico-Mexico border, following the approximate route depicted on the map, identified as “Proposed Continental Divide National Scenic Trail” in the Department of the Interior Continental Divide Trail ...

    133 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

How this bill changes current law

1 change Share ↗

Compared against current U.S. Code AI-generated reading aid — verify against the official bill.

The bill adds the Bonneville Shoreline Trail to the National Trails System Act and requires a feasibility study on its designation, transferring the study responsibility from the Secretary of the Interior to the Secretary of Agriculture.

  • 16 U.S.C. 1244(c)

    (50) Bonneville shoreline trail.-- (A) In general.--The Bonneville Shoreline Trail, a system of trails and potential trails extending approximately 280 miles from the Idaho-Utah border to Nephi, Utah, following the Bonneville bench that was created by the historic Lake Bonneville. (B) Requirement.--The study under this paragraph shall be conducted by the Secretary of Agriculture.

    This change establishes the Bonneville Shoreline Trail as a recognized trail and assigns the study for its designation to the Secretary of Agriculture.

Action History

  1. Received in the House.

  2. Held at the desk.

  3. Message on Senate action sent to the House.

  4. Passed/agreed to in Senate: Passed Senate with an amendment and an amendment to the Title by Unanimous Consent.

  5. Passed Senate with an amendment and an amendment to the Title by Unanimous Consent.

  6. Committee on Energy and Natural Resources. Reported by Senator Lee with an amendment in the nature of a substitute and an amendment to the title. Without written report.

  7. Committee on Energy and Natural Resources. Reported by Senator Lee with an amendment in the nature of a substitute and an amendment to the title. Without written report.

  8. Placed on Senate Legislative Calendar under General Orders. Calendar No. 473.

  9. Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.

  10. Committee on Energy and Natural Resources Subcommittee on National Parks. Hearings held. With printed Hearing: S.Hrg. 119-238.

  11. Introduced in Senate

  12. Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 537 not signed on

Sponsors (1)

Co-sponsors (1)

Not signed on (537)

537 members have not signed on to this bill.

Show all 537 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Lobbying on this bill

From the reports lobbyists file with Congress. A report shows the bill was lobbied, not that anyone met a member about it.

5 lobbying reports for 1 client name S 1135, the latest filed July 13, 2026.

Counted from reports filed March 26, 2025 through June 3, 2027: a report names a bill by its number, not its Congress, so we count those filed within about two years of when this bill began.

See who's lobbying on S 1135

The clients and their firms, what they reported spending, the issues and the agencies and chambers they lobbied, and former officials among the lobbyists, on any paid plan.

See plans

Source: U.S. Senate Office of Public Records, LDA.gov, retrieved August 29, 2026. Senate Office of Public Records cannot vouch for the data or analyses derived from these data after the data have been retrieved from LDA.gov.

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 1135 do?
A bill to amend the National Trails System Act to direct the Secretary of the Interior to conduct a study on the feasibility of designating the Bonneville Shoreline Trail.
Who sponsors S 1135?
S 1135 is sponsored by Mike Lee (Republican) and John R. Curtis (Republican).
What is the current status of S 1135?
This bill has passed the Senate. Introduced March 26, 2025. It now moves to the second chamber.
Where can I track S 1135?
Track S 1135 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 1135

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 1135

Last checked for changes 3 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →