Oregon 2019 Regular Session Status: Died Sponsors 2 R

SB 503 — Relating to the use of hydroelectric energy to comply with a renewable portfolio standard.

Last action — In committee upon adjournment.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 2019 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active: its legislative session has ended, so there is no live prognosis. It would have to be introduced again in a later session to move.

In plain language

The bill allows hydroelectric energy to count toward renewable energy standards.

This legislation specifies that electricity from hydroelectric facilities can be used to meet renewable portfolio standards. The bill aims to recognize hydroelectric energy as a valid source for compliance.

Summary

Specifies that electricity generated by hydroelectric facility or other equipment that generates electricity through use of hydroelectric energy may be used to comply with renewable portfolio standard.

Bill Text

We don't have the full text on file for this bill yet.

Read SB 503 on the official Oregon source →

How this bill changes current law

9 changes Share ↗

AI-generated reading aid from the bill's amendatory text — verify against the official bill.

The bill expands the eligibility of hydroelectric facilities for compliance with renewable portfolio standards in Oregon.

  • ORS 469A.020

    hydroelectric → hydroelectric facility or any other equipment that generates electricity through the use of hydroelectric energy

    The definition is broadened to include all hydroelectric facilities and related equipment beyond those operational after 1995.

  • ORS 469A.020

    Electricity from a hydroelectric facility that became operational before January 1, 1995, may be used to comply with a renewable portfolio standard if the electricity is attributable to efficiency upgrades made on or after January 1, 1995. If an efficiency upgrade is made to a Bonneville Power Administration facility, only that portion of the electricity generation attributable to Oregon’s share of the electricity may be used to comply with a renewable portfolio standard.

    The specific criteria for hydroelectric facilities operational before 1995 is removed, making it easier for older facilities to comply.

  • ORS 469A.025

    Electricity generated by a hydroelectric facility may be used to comply with a renewable portfolio standard only if:

    Conditions for hydroelectric energy compliance under renewable portfolio standards are removed.

  • ORS 469A.025

    The facility is located outside any protected area designated by the Pacific Northwest Electric Power and Conservation Planning Council as of July 23, 1999, or any area protected under the federal Wild and Scenic Rivers Act, P.L. 90-542, or the Oregon Scenic Waterways Act, ORS 390.805 to 390.925; or

    Restrictions based on facility location are no longer applicable for compliance.

  • ORS 469A.025

    The electricity is attributable to efficiency upgrades made to the facility on or after January 1, 1995.

    Conditions based on efficiency upgrades are removed for hydroelectric energy compliance.

  • ORS 469A.025

    Electricity generated from hydrogen gas, including electricity generated by hydrogen power stations using anhydrous ammonia as a fuel source, may be used to comply with a renewable portfolio standard if:

    Criteria related to hydrogen gas sources for compliance are clarified and streamlined.

  • ORS 469A.027

    [(5) and (6)] → (3) and (4)

    Updates the reference to sections affected for eligibility certification.

  • ORS 469A.029

    [(5) and (6)] → (3) and (4)

    Standardizes references to qualifying regulations for registration.

  • ORS 469A.031

    [(5)] → (3)

    Clarifies which facilities can be eligible for renewable energy certificates.

Action History

  1. In committee upon adjournment.

  2. Referred to Environment and Natural Resources.

  3. Introduction and first reading. Referred to President's desk.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 0 not signed on

Sponsors (1)

Co-sponsors (1)

Not signed on (0)

None.

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 503 do?
Specifies that electricity generated by hydroelectric facility or other equipment that generates electricity through use of hydroelectric energy may be used to comply with renewable portfolio standard.
Who sponsors SB 503?
SB 503 is sponsored by Diane Linthicum (Republican) and Alan Olsen (Republican).
What is the current status of SB 503?
This bill died with 2019 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 503?
Track SB 503 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 503

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 503

Last checked for changes 4 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →