SB 346 — Net energy metering; solar interconnection, cost recovery.
Last action — Continued to 2025 in Commerce and Labor (14-Y 1-N)
-
✓Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House of Delegates
-
5To Executive
-
6Enacted
This bill died with 2024 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there are no live odds of enactment. It would have to be reintroduced in the current session to move again.
Summary
Net energy metering; solar interconnection;cost recovery. Provides that an electric distribution companyshall pay $1 per kilowatt per day for the costs of lost electricityproduction for any and all delays beyond the regulatory notice periodrequired by State Corporation Commission related to net energy metering. The bill requires that, for the purposes of net energy metering,an eligible customer-generator shall bear all reasonable costs ofequipment required at the eligible customer-generator's side of the meter forthe interconnection to the supplier's electric distribution system,including reasonable and prudent costs of additional controls, tests,or liability insurance. Additionally, the bill allows for cost recovery by Phase I and Phase II Utilities for electric distribution gridtransformation projects that support the interconnection of generatingfacilities using energy derived from sunlight that are owned or contractedby eligible customer-generators, subject to the Commission findingthose costs to be reasonable and prudent in accordance with existinglaw.
Bill Text
- Prefiled Prefiled and ordered printed; offered 01/10/24 24104922D Current pdf January 09, 2024
Action History
-
Continued to 2025 in Commerce and Labor (14-Y 1-N)
-
Senate committee, floor amendments and substitutes offered
-
Senate committee, floor amendments and substitutes offered
-
Senate committee, floor amendments and substitutes offered
-
Impact statement from SCC (SB346)
-
Senate committee, floor amendments and substitutes offered
-
Referred to Committee on Commerce and Labor
-
Prefiled and ordered printed; offered 01/10/24 24104922D
Sponsors
- Suhas Subramanyam · Primary
- R. Creigh Deeds · Cosponsor
- Barbara A. Favola · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 2 co-sponsors · 145 not signed on · 1 voted No
Sponsors (1)
Co-sponsors (2)
Not signed on (145)
145 members have not signed on to this bill.
Show all 145 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Unaffiliated | 14 | 1 | 0 | 0 |
| Total | 14 | 1 | 0 | 0 |
| % of votes cast | 93% | 7% | 0% | 0% |
How each member voted (15)
| Member | Party | Vote |
|---|---|---|
| Aaron R. Rouse | — | Yea |
| Bill DeSteph | — | Yea |
| Bryce E. Reeves | — | Yea |
| David W. Marsden | — | Yea |
| Ebbin, Adam P. | — | Yea |
| Jeremy S. McPike | — | Nay |
| L. Louise Lucas | — | Yea |
| Lamont Bagby | — | Yea |
| Mamie E. Locke | — | Yea |
| Mark D. Obenshain | — | Yea |
| Mark J. Peake | — | Yea |
| R. Creigh Deeds | — | Yea |
| Ryan T. McDougle | — | Yea |
| Scott A. Surovell | — | Yea |
| William M. Stanley, Jr. | — | Yea |
Subjects
Frequently asked questions
- What does SB 346 do?
- Net energy metering; solar interconnection;cost recovery. Provides that an electric distribution companyshall pay $1 per kilowatt per day for the costs of lost electricityproduction for any and all delays beyond the regulatory notice periodrequired by State Corporation Commission related to net energy metering. The bill requires that, for the purposes of net energy metering,an eligible customer-generator shall bear all reasonable costs ofequipment required at the eligible customer-generator's side of the meter forthe interconnection to the supplier's electric distribution system,including reasonable and prudent costs of additional controls, tests,or liability insurance. Additionally, the bill allows for cost recovery by Phase I and Phase II Utilities for electric distribution gridtransformation projects that support the interconnection of generatingfacilities using energy derived from sunlight that are owned or contractedby eligible customer-generators, subject to the Commission findingthose costs to be reasonable and prudent in accordance with existinglaw.
- Who sponsors SB 346?
- SB 346 is sponsored by Subramanyam, Suhas, R. Creigh Deeds, and Barbara A. Favola.
- What is the current status of SB 346?
- This bill died with 2024 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track SB 346?
- Track SB 346 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 346
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 346
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →