New Jersey 222nd Legislature Status: Introduced 3 D cosponsors

A 4531 — Establishes alternative compliance standards for development of electric vehicle supply equipment and Make-Ready parking spaces based on charging capacity.

Last action — APP

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed General Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the General Assembly. Introduced March 10, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Odds of enactment

Low chance

Based on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Advancing 36% · moderate confidence
  • Introduced

    Current position in the legislative process.

  • 5 sponsors

    5 primary, 0 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (3 D).

  • Cleared a recorded vote

    Passed 3 recorded votes so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

In plain language

This bill establishes alternative standards for electric vehicle charging infrastructure development.

The bill creates alternative compliance standards for developing electric vehicle supply equipment and associated parking spaces. These standards are based on the charging capacity of the equipment.

What this means for you
  • Consumers: This means better access to electric vehicle charging stations as infrastructure development becomes more flexible.
  • Environment: This means increased support for electric vehicle adoption, contributing to environmental sustainability.
  • Small Business: This means potential opportunities for small businesses to install compliant charging stations with alternative standards.

Summary

Electric vehicle supply equip-estab alternative compliance standards for devel

Bill Text

What changed in the latest version

74 added · 60 removed

Plain-language change summary

The amendment to the bill changes the definition of a compliance method related to electric vehicle charging from a "power allocation method" to an "alternative compliance method." The new definition focuses on total electric vehicle charging capacity, specifying that it can only be used if the charging equipment provides a minimum output of 50 kilowatts per charging port. This change may affect how developers and owners meet requirements for electric vehicle supply equipment installation.

→
Previous
Latest
A4531 1R [First Reprint] ASSEMBLY, No.
A4531 2R [Second Reprint] ASSEMBLY, No.
KARABINCHAK District 18 (Middlesex)         SYNOPSIS      Establishes alternative compliance standards for development of electric vehicle supply equipment and Make-Ready parking spaces based on charging capacity.
KARABINCHAK District 18 (Middlesex) Senator  PATRICK J.
  CURRENT VERSION OF TEXT      As reported by the Assembly Transportation and Independent Authorities Committee on March 16, 2026, with amendments.
DIEGNAN, JR.
District 18 (Middlesex) Senator  BENJIE E.
WIMBERLY District 35 (Bergen and Passaic)         SYNOPSIS      Establishes alternative compliance standards for development of electric vehicle supply equipment and Make-Ready parking spaces based on charging capacity.
  CURRENT VERSION OF TEXT      As amended by the Senate on May 28, 2026.
     a.     P.L.2021, c.171 (C.40:55D-66.18 et seq.) establishes requirements for the installation of electric vehicle supply equipment and Make-Ready parking spaces in connection with certain development approvals.
     a.    P.L.2021, c.171 (C.40:55D-66.18 et seq.) establishes requirements for the installation of electric vehicle supply equipment and Make-Ready parking spaces in connection with certain development approvals.
     c.     Different categories of development and parking facilities involve varying parking durations and charging needs.
     c.    Different categories of development and parking facilities involve varying parking durations and charging needs.
     e.     Therefore, the Legislature determines it is in the public interest to authorize an alternative method of compliance, based on total electric vehicle charging capacity, as determined in accordance with uniform, Statewide standards, while preserving existing statutory requirements and ensuring uniform, Statewide standards.
     e.    Therefore, the Legislature determines it is in the public interest to authorize an alternative method of compliance, based on total electric vehicle charging capacity, as determined in accordance with uniform, Statewide standards, while preserving existing statutory requirements and ensuring uniform, Statewide standards.
        2.   As used in P.L.    , c.    (C.        ) (pending before the Legislature as this bill):        "Charging capacity" means the total rated electrical output in kilowatts available for electric vehicle charging at a site or parking facility.
       2.    As used in P.L.    , c.    (C.        ) (pending before the Legislature as this bill):
      1["Power allocation method" means a compliance method based on total charging capacity rather than the number of electric vehicle supply equipped parking spaces.]1       "Electric vehicle supply equipment" or "EVSE" means the equipment, including the cables, cords, conductors, connectors, couplers, enclosures, attachment plugs, power outlets, power electronics, transformer, switchgear, switches and controls, network interfaces, point-of-sale equipment, and associated apparatus designed and used for the purpose of transferring energy from the electric supply system to a plug-in electric vehicle.  "EVSE" may deliver either alternating current or, consistent with fast charging equipment standards, direct current electricity.  "EVSE" is synonymous with "electric vehicle charging station."       "Make-Ready" means the pre-wiring of electrical infrastructure at a parking space, or set of parking spaces, to facilitate easy and cost-efficient future installation of EVSE 1,1 including, but not limited to, Level Two EVSE and direct current fast chargers (DCFC).  1"1 Make-Ready 1"1 includes expenses related to service panels, junction boxes, conduit, wiring, and other components necessary to make a particular location able to accommodate EVSE on a "plug and play" basis.  For the purpose of this definition, Level 2 EVSE operates on a 40 to amp breaker on a 208 or 240 volt AC circuit.  DCFC operates on a 60 amp or higher breaker on a 480 volt or higher three phase circuit with special grounding equipment.  DCFC stations can also be referred to as rapid charging stations.
      2"Alternative compliance method" means a compliance method based on total electric vehicle charging capacity rather than the number of parking spaces equipped with electric vehicle supply equipment.  This method may be used only where the electric vehicle supply equipment utilized provides a rated charging output of not less than 50 kilowatts per charging port.2      "Charging capacity" means the total rated electrical output in kilowatts available for electric vehicle charging at a site or parking facility.
      1"Power allocation method" means a compliance method based on total charging capacity rather than the number of electric vehicle supply equipped parking spaces.1        3.    Notwithstanding the provisions of subsections a.
     1["Power allocation method" means a compliance method based on total charging capacity rather than the number of electric vehicle supply equipped parking spaces.]1      "Electric vehicle supply equipment" or "EVSE" means the equipment, including the cables, cords, conductors, connectors, couplers, enclosures, attachment plugs, power outlets, power electronics, transformer, switchgear, switches and controls, network interfaces, point-of-sale equipment, and associated apparatus designed and used for the purpose of transferring energy from the electric supply system to a plug-in electric vehicle.
and b.
 "EVSE" may deliver either alternating current or, consistent with fast charging equipment standards, direct current electricity.
of section 3 of P.L.2021, c.171 (C.40:55D-66.20), a developer or owner subject to the requirements of that section may satisfy the requirements for the installation of electric vehicle supply equipment or Make-Ready parking spaces by either:
 "EVSE" is synonymous with "electric vehicle charging station."      "Make-Ready" means the pre-wiring of electrical infrastructure at a parking space, or set of parking spaces, to facilitate easy and cost-efficient future installation of EVSE 1,1 including, but not limited to, Level Two EVSE and direct current fast chargers (DCFC).  1"1 Make-Ready 1"1 includes expenses related to service panels, junction boxes, conduit, wiring, and other components necessary to make a particular location able to accommodate EVSE on a "plug and play" basis.
     a.     complying with the applicable requirements based on the number of parking spaces prepared with electric vehicle supply equipment or Make-Ready equipment, as otherwise provided by law;
 For the purpose of this definition, Level 2 EVSE operates on a 40 to 100 amp breaker on a 208 or 240 volt AC circuit.  DCFC operates on a 60 amp or higher breaker on a 480 volt or higher three phase circuit with special grounding equipment.
 DCFC stations can also be referred to as rapid charging stations.
     2[1"Power allocation method" means a compliance method based on total charging capacity rather than the number of electric vehicle supply equipped parking spaces.1]2        3.    Notwithstanding the provisions of 2[subsections a.
and] subsection2 b.
of section 3 of P.L.2021, c.171 (C.40:55D-66.20), a developer or owner 2of a gasoline service station or retail establishment that is located on a highway that is part of the National Highway System but is not part of the Interstate System, or within three miles driving distance of a limited access highway exit or interchange2 subject to the requirements of that section may satisfy the requirements for the installation of electric vehicle supply equipment or Make-Ready parking spaces by either:
     a.    complying with the applicable requirements based on the number of parking spaces prepared with electric vehicle supply equipment or Make-Ready equipment, as otherwise provided by law;
     (1)   minimum electric vehicle charging capacity requirements, which may be determined based on:
     (1)  minimum electric vehicle charging capacity requirements, which may be determined based on:
and      (b)   the category or use of the development or parking facility, including but not limited to retail, multifamily residential, office, mixed-use, or other nonresidential uses;
and      (b)  the category or use of the development or parking facility, including but not limited to retail, multifamily residential, office, mixed-use, or other nonresidential uses;
     (2)   equivalency standards for different types of electric vehicle supply equipment, based on rated charging capacity and other relevant technical characteristics;
     (2)  equivalency standards for different types of electric vehicle supply equipment, based on rated charging capacity and other relevant technical characteristics;
     (3)   standards addressing accessibility requirements applicable to electric vehicle charging infrastructure;
     (3)  standards addressing accessibility requirements applicable to electric vehicle charging infrastructure;
     (4)   standards addressing safety considerations, including electrical, fire, and traffic circulation safety;
     (4)  standards addressing safety considerations, including electrical, fire, and traffic circulation safety;
     (5)   standards permitting phased installation of electric vehicle supply equipment or charging capacity over time, consistent with existing statutory timelines;
     (5)  standards permitting phased installation of electric vehicle supply equipment or charging capacity over time, consistent with existing statutory timelines;
and      (6)   standards addressing future expansion capability, including electrical capacity, conduit, and infrastructure planning.
and      (6)  standards addressing future expansion capability, including electrical capacity, conduit, and infrastructure planning.
     c.     A municipality or local land use board shall not impose requirements related to electric vehicle charging capacity, electric vehicle supply equipment type, or compliance methodology that are additional to, or inconsistent with, the alternative compliance standards established pursuant to this section.
     c.    A municipality or local land use board shall not impose requirements related to electric vehicle charging capacity, electric vehicle supply equipment type, or compliance methodology that are additional to, or inconsistent with, the alternative compliance standards established pursuant to this section.
     c.     The alternative compliance method authorized by P.L.    , c.    (C.        ) (pending before the Legislature as this bill) shall affect only the manner in which compliance with electric vehicle charging infrastructure requirements is measured and shall not be construed to increase, decrease, or otherwise modify minimum parking requirements applicable to a development or parking facility.
     c.    The alternative compliance method authorized by P.L.    , c.    (C.        ) (pending before the Legislature as this bill) shall affect only the manner in which compliance with electric vehicle charging infrastructure requirements is measured and shall not be construed to increase, decrease, or otherwise modify minimum parking requirements applicable to a development or parking facility.
     c.     Nothing in P.L.    , c.    (C.        ) (pending before the Legislature as this bill) shall be construed to limit the authority of the Department of Community Affairs to adopt or enforce standards necessary to ensure compliance with accessibility, safety, and construction requirements applicable to electric vehicle supply equipment and associated infrastructure.
     c.    Nothing in P.L.    , c.    (C.        ) (pending before the Legislature as this bill) shall be construed to limit the authority of the Department of Community Affairs to adopt or enforce standards necessary to ensure compliance with accessibility, safety, and construction requirements applicable to electric vehicle supply equipment and associated infrastructure.
     c.     Nothing in this section shall be construed to expand or diminish municipal authority beyond that otherwise provided by law.
     c.    Nothing in this section shall be construed to expand or diminish municipal authority beyond that otherwise provided by law.
View plain text versions (3)

Action History

  1. APP

  2. PA PBH

  3. R/A 2RAC

  4. PS

  5. SUB FOR

  6. SA 2RS

  7. R/S SWR 2RS

  8. PA

  9. REP 2RA

  10. REP/ACA REF ASL

  11. INT 1RA REF ATR

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

5 sponsors · 0 co-sponsors · 115 not signed on · 18 voted No

Sponsors (5)

Co-sponsors (0)

None.

Not signed on (115)

115 members have not signed on to this bill.

Show all 115 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 12 Yea · 2 Nay · 1 Other
Party YeaNayPresentNot Voting
Democrat 10000
Republican 2201
Total 12201
% of votes cast 80%13%0%7%
How each member voted (15)
Member Party Vote
Calabrese, Clinton Democrat Yea
Carter, Linda S. Democrat Yea
Karabinchak, Robert J. Democrat Yea
Kennedy, James J. Democrat Yea
Macurdy, Andrew Democrat Yea
Moen Jr., William F. Democrat Yea
Onyema, Chigozie U. Democrat Yea
Sampson IV, William B. Democrat Yea
Singh, Balvir Democrat Yea
Walker, Jerry Democrat Yea
Clifton, Robert D. Republican Yea
Dunn, Aura K. Republican Yea
Inganamort, Michael Republican Not Voting
McClellan, Antwan L. Republican Nay
McGuckin, Gregory P. Republican Nay

Official roll call →

Floor vote

Passed 26 Yea · 14 Nay
Party YeaNayPresentNot Voting
Republican 11400
Democrat 25000
Total 261400
% of votes cast 65%35%0%0%
How each member voted (40)
Member Party Vote
Beach, James Democrat Yea
Burgess, Renee C. Democrat Yea
Burzichelli, John J. Democrat Yea
Cruz-Perez, Nilsa I. Democrat Yea
Cryan, Joseph P. Democrat Yea
Diegnan Jr., Patrick J. Democrat Yea
Gopal, Vin Democrat Yea
Greenstein, Linda R. Democrat Yea
Johnson, Gordon M. Democrat Yea
Lagana, Joseph A. Democrat Yea
McKeon, John F. Democrat Yea
McKnight, Angela V. Democrat Yea
Moriarty, Paul D. Democrat Yea
Mukherji, Raj Democrat Yea
Ruiz, M. Teresa Democrat Yea
Sarlo, Paul A. Democrat Yea
Scutari, Nicholas P. Democrat Yea
Singleton, Troy Democrat Yea
Smith, Bob Democrat Yea
Stack, Brian P. Democrat Yea
Timberlake, Britnee N. Democrat Yea
Turner, Shirley K. Democrat Yea
Vitale, Joseph F. Democrat Yea
Wimberly, Benjie E. Democrat Yea
Zwicker, Andrew Democrat Yea
Amato Jr., Carmen F. Republican Nay
Bramnick, Jon M. Republican Nay
Bucco, Anthony M. Republican Nay
Corrado, Kristin M. Republican Nay
Henry, Owen Republican Nay
Holzapfel, James W. Republican Yea
O'Scanlon Jr., Declan J. Republican Nay
Pennacchio, Joseph Republican Nay
Polistina, Vincent J. Republican Nay
Schepisi, Holly T. Republican Nay
Singer, Robert W. Republican Nay
Space, Parker Republican Nay
Steinhardt, Douglas J. Republican Nay
Testa Jr., Michael L. Republican Nay
Tiver, Latham Republican Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does A 4531 do?
Electric vehicle supply equip-estab alternative compliance standards for devel
Who sponsors A 4531?
A 4531 is sponsored by Diegnan, Patrick J., Wimberly, Benjie E., Calabrese, Clinton (Democrat), Carter, Linda S. (Democrat), and Karabinchak, Robert J. (Democrat).
What is the current status of A 4531?
This bill has been introduced in the General Assembly. Introduced March 10, 2026. It must pass committee before a floor vote.
Where can I track A 4531?
Track A 4531 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on A 4531

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of A 4531

Last checked for changes about 1 month ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →