New Jersey 222nd Legislature Status: Introduced Sponsors 3 D

A 4531 — Establishes alternative compliance standards for development of electric vehicle supply equipment and Make-Ready parking spaces based on charging capacity.

Last action — APP

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed General Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the General Assembly. Introduced March 10, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

In plain language

The bill establishes alternative compliance standards for electric vehicle charging infrastructure development.

This bill allows developers to meet electric vehicle supply equipment requirements using alternative standards based on charging capacity rather than just the number of parking spaces. It is aimed at facilitating more effective electric vehicle charging infrastructure development.

What this means for you
  • Small Business: This bill may provide flexibility for small businesses in meeting electric vehicle charging infrastructure requirements.

Summary

Electric vehicle supply equip-estab alternative compliance standards for devel

Bill Text

What changed in the latest version

74 added · 60 removed

Plain-language change summary

The amendment to the bill changes the definition of a compliance method related to electric vehicle charging from a "power allocation method" to an "alternative compliance method." The new definition focuses on total electric vehicle charging capacity, specifying that it can only be used if the charging equipment provides a minimum output of 50 kilowatts per charging port. This change may affect how developers and owners meet requirements for electric vehicle supply equipment installation.

→
Previous
Latest
A4531 1R [First Reprint] ASSEMBLY, No.
A4531 2R [Second Reprint] ASSEMBLY, No.
KARABINCHAK District 18 (Middlesex)         SYNOPSIS      Establishes alternative compliance standards for development of electric vehicle supply equipment and Make-Ready parking spaces based on charging capacity.
KARABINCHAK District 18 (Middlesex) Senator  PATRICK J.
  CURRENT VERSION OF TEXT      As reported by the Assembly Transportation and Independent Authorities Committee on March 16, 2026, with amendments.
DIEGNAN, JR.
District 18 (Middlesex) Senator  BENJIE E.
WIMBERLY District 35 (Bergen and Passaic)         SYNOPSIS      Establishes alternative compliance standards for development of electric vehicle supply equipment and Make-Ready parking spaces based on charging capacity.
  CURRENT VERSION OF TEXT      As amended by the Senate on May 28, 2026.
     a.     P.L.2021, c.171 (C.40:55D-66.18 et seq.) establishes requirements for the installation of electric vehicle supply equipment and Make-Ready parking spaces in connection with certain development approvals.
     a.    P.L.2021, c.171 (C.40:55D-66.18 et seq.) establishes requirements for the installation of electric vehicle supply equipment and Make-Ready parking spaces in connection with certain development approvals.
     c.     Different categories of development and parking facilities involve varying parking durations and charging needs.
     c.    Different categories of development and parking facilities involve varying parking durations and charging needs.
     e.     Therefore, the Legislature determines it is in the public interest to authorize an alternative method of compliance, based on total electric vehicle charging capacity, as determined in accordance with uniform, Statewide standards, while preserving existing statutory requirements and ensuring uniform, Statewide standards.
     e.    Therefore, the Legislature determines it is in the public interest to authorize an alternative method of compliance, based on total electric vehicle charging capacity, as determined in accordance with uniform, Statewide standards, while preserving existing statutory requirements and ensuring uniform, Statewide standards.
        2.   As used in P.L.    , c.    (C.        ) (pending before the Legislature as this bill):        "Charging capacity" means the total rated electrical output in kilowatts available for electric vehicle charging at a site or parking facility.
       2.    As used in P.L.    , c.    (C.        ) (pending before the Legislature as this bill):
      1["Power allocation method" means a compliance method based on total charging capacity rather than the number of electric vehicle supply equipped parking spaces.]1       "Electric vehicle supply equipment" or "EVSE" means the equipment, including the cables, cords, conductors, connectors, couplers, enclosures, attachment plugs, power outlets, power electronics, transformer, switchgear, switches and controls, network interfaces, point-of-sale equipment, and associated apparatus designed and used for the purpose of transferring energy from the electric supply system to a plug-in electric vehicle.  "EVSE" may deliver either alternating current or, consistent with fast charging equipment standards, direct current electricity.  "EVSE" is synonymous with "electric vehicle charging station."       "Make-Ready" means the pre-wiring of electrical infrastructure at a parking space, or set of parking spaces, to facilitate easy and cost-efficient future installation of EVSE 1,1 including, but not limited to, Level Two EVSE and direct current fast chargers (DCFC).  1"1 Make-Ready 1"1 includes expenses related to service panels, junction boxes, conduit, wiring, and other components necessary to make a particular location able to accommodate EVSE on a "plug and play" basis.  For the purpose of this definition, Level 2 EVSE operates on a 40 to amp breaker on a 208 or 240 volt AC circuit.  DCFC operates on a 60 amp or higher breaker on a 480 volt or higher three phase circuit with special grounding equipment.  DCFC stations can also be referred to as rapid charging stations.
      2"Alternative compliance method" means a compliance method based on total electric vehicle charging capacity rather than the number of parking spaces equipped with electric vehicle supply equipment.  This method may be used only where the electric vehicle supply equipment utilized provides a rated charging output of not less than 50 kilowatts per charging port.2      "Charging capacity" means the total rated electrical output in kilowatts available for electric vehicle charging at a site or parking facility.
      1"Power allocation method" means a compliance method based on total charging capacity rather than the number of electric vehicle supply equipped parking spaces.1        3.    Notwithstanding the provisions of subsections a.
     1["Power allocation method" means a compliance method based on total charging capacity rather than the number of electric vehicle supply equipped parking spaces.]1      "Electric vehicle supply equipment" or "EVSE" means the equipment, including the cables, cords, conductors, connectors, couplers, enclosures, attachment plugs, power outlets, power electronics, transformer, switchgear, switches and controls, network interfaces, point-of-sale equipment, and associated apparatus designed and used for the purpose of transferring energy from the electric supply system to a plug-in electric vehicle.
and b.
 "EVSE" may deliver either alternating current or, consistent with fast charging equipment standards, direct current electricity.
of section 3 of P.L.2021, c.171 (C.40:55D-66.20), a developer or owner subject to the requirements of that section may satisfy the requirements for the installation of electric vehicle supply equipment or Make-Ready parking spaces by either:
 "EVSE" is synonymous with "electric vehicle charging station."      "Make-Ready" means the pre-wiring of electrical infrastructure at a parking space, or set of parking spaces, to facilitate easy and cost-efficient future installation of EVSE 1,1 including, but not limited to, Level Two EVSE and direct current fast chargers (DCFC).  1"1 Make-Ready 1"1 includes expenses related to service panels, junction boxes, conduit, wiring, and other components necessary to make a particular location able to accommodate EVSE on a "plug and play" basis.
     a.     complying with the applicable requirements based on the number of parking spaces prepared with electric vehicle supply equipment or Make-Ready equipment, as otherwise provided by law;
 For the purpose of this definition, Level 2 EVSE operates on a 40 to 100 amp breaker on a 208 or 240 volt AC circuit.  DCFC operates on a 60 amp or higher breaker on a 480 volt or higher three phase circuit with special grounding equipment.
 DCFC stations can also be referred to as rapid charging stations.
     2[1"Power allocation method" means a compliance method based on total charging capacity rather than the number of electric vehicle supply equipped parking spaces.1]2        3.    Notwithstanding the provisions of 2[subsections a.
and] subsection2 b.
of section 3 of P.L.2021, c.171 (C.40:55D-66.20), a developer or owner 2of a gasoline service station or retail establishment that is located on a highway that is part of the National Highway System but is not part of the Interstate System, or within three miles driving distance of a limited access highway exit or interchange2 subject to the requirements of that section may satisfy the requirements for the installation of electric vehicle supply equipment or Make-Ready parking spaces by either:
     a.    complying with the applicable requirements based on the number of parking spaces prepared with electric vehicle supply equipment or Make-Ready equipment, as otherwise provided by law;
     (1)   minimum electric vehicle charging capacity requirements, which may be determined based on:
     (1)  minimum electric vehicle charging capacity requirements, which may be determined based on:
and      (b)   the category or use of the development or parking facility, including but not limited to retail, multifamily residential, office, mixed-use, or other nonresidential uses;
and      (b)  the category or use of the development or parking facility, including but not limited to retail, multifamily residential, office, mixed-use, or other nonresidential uses;
     (2)   equivalency standards for different types of electric vehicle supply equipment, based on rated charging capacity and other relevant technical characteristics;
     (2)  equivalency standards for different types of electric vehicle supply equipment, based on rated charging capacity and other relevant technical characteristics;
     (3)   standards addressing accessibility requirements applicable to electric vehicle charging infrastructure;
     (3)  standards addressing accessibility requirements applicable to electric vehicle charging infrastructure;
     (4)   standards addressing safety considerations, including electrical, fire, and traffic circulation safety;
     (4)  standards addressing safety considerations, including electrical, fire, and traffic circulation safety;
     (5)   standards permitting phased installation of electric vehicle supply equipment or charging capacity over time, consistent with existing statutory timelines;
     (5)  standards permitting phased installation of electric vehicle supply equipment or charging capacity over time, consistent with existing statutory timelines;
and      (6)   standards addressing future expansion capability, including electrical capacity, conduit, and infrastructure planning.
and      (6)  standards addressing future expansion capability, including electrical capacity, conduit, and infrastructure planning.
     c.     A municipality or local land use board shall not impose requirements related to electric vehicle charging capacity, electric vehicle supply equipment type, or compliance methodology that are additional to, or inconsistent with, the alternative compliance standards established pursuant to this section.
     c.    A municipality or local land use board shall not impose requirements related to electric vehicle charging capacity, electric vehicle supply equipment type, or compliance methodology that are additional to, or inconsistent with, the alternative compliance standards established pursuant to this section.
     c.     The alternative compliance method authorized by P.L.    , c.    (C.        ) (pending before the Legislature as this bill) shall affect only the manner in which compliance with electric vehicle charging infrastructure requirements is measured and shall not be construed to increase, decrease, or otherwise modify minimum parking requirements applicable to a development or parking facility.
     c.    The alternative compliance method authorized by P.L.    , c.    (C.        ) (pending before the Legislature as this bill) shall affect only the manner in which compliance with electric vehicle charging infrastructure requirements is measured and shall not be construed to increase, decrease, or otherwise modify minimum parking requirements applicable to a development or parking facility.
     c.     Nothing in P.L.    , c.    (C.        ) (pending before the Legislature as this bill) shall be construed to limit the authority of the Department of Community Affairs to adopt or enforce standards necessary to ensure compliance with accessibility, safety, and construction requirements applicable to electric vehicle supply equipment and associated infrastructure.
     c.    Nothing in P.L.    , c.    (C.        ) (pending before the Legislature as this bill) shall be construed to limit the authority of the Department of Community Affairs to adopt or enforce standards necessary to ensure compliance with accessibility, safety, and construction requirements applicable to electric vehicle supply equipment and associated infrastructure.
     c.     Nothing in this section shall be construed to expand or diminish municipal authority beyond that otherwise provided by law.
     c.    Nothing in this section shall be construed to expand or diminish municipal authority beyond that otherwise provided by law.
View plain text versions (3)

Action History

  1. APP

  2. PA PBH

  3. R/A 2RAC

  4. PS

  5. SUB FOR

  6. SA 2RS

  7. R/S SWR 2RS

  8. PA

  9. REP 2RA

  10. REP/ACA REF ASL

  11. INT 1RA REF ATR

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

5 sponsors · 0 co-sponsors · 117 not signed on · 18 voted No

Sponsors (5)

Co-sponsors (0)

None.

Not signed on (117)

117 members have not signed on to this bill.

Show all 117 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Committee ATR

Passed 12 Yea · 2 Nay · 1 Other
Party YeaNayPresentNot Voting
Democratic 10000
Republican 2201
Total 12201
% of votes cast 80%13%0%7%
How each member voted (15)
Member Party Vote
Clinton Calabrese Democrat Yea
Linda S. Carter Democrat Yea
Robert J. Karabinchak Democrat Yea
James J. Kennedy Democrat Yea
Andrew Macurdy Democrat Yea
William F. Moen Jr. Democrat Yea
Chigozie U. Onyema Democrat Yea
William B. Sampson IV Democrat Yea
Balvir Singh Democrat Yea
Jerry Walker Democrat Yea
Robert D. Clifton Republican Yea
Aura K. Dunn Republican Yea
Michael Inganamort Republican Not Voting
Antwan L. McClellan Republican Nay
Gregory P. McGuckin Republican Nay

Official roll call →

Floor vote

Passed 26 Yea · 14 Nay
Party YeaNayPresentNot Voting
Republican 11400
Democratic 25000
Total 261400
% of votes cast 65%35%0%0%
How each member voted (40)
Member Party Vote
James Beach Democrat Yea
Renee C. Burgess Democrat Yea
John J. Burzichelli Democrat Yea
Nilsa I. Cruz-Perez Democrat Yea
Joseph P. Cryan Democrat Yea
Patrick J. Diegnan Jr. Democrat Yea
Vin Gopal Democrat Yea
Linda R. Greenstein Democrat Yea
Gordon M. Johnson Democrat Yea
Joseph A. Lagana Democrat Yea
John F. McKeon Democrat Yea
Angela V. McKnight Democrat Yea
Paul D. Moriarty Democrat Yea
Raj Mukherji Democrat Yea
M. Teresa Ruiz Democrat Yea
Paul A. Sarlo Democrat Yea
Nicholas P. Scutari Democrat Yea
Troy Singleton Democrat Yea
Bob Smith Democrat Yea
Brian P. Stack Democrat Yea
Britnee N. Timberlake Democrat Yea
Shirley K. Turner Democrat Yea
Joseph F. Vitale Democrat Yea
Benjie E. Wimberly Democrat Yea
Andrew Zwicker Democrat Yea
Carmen F. Amato Jr. Republican Nay
Jon M. Bramnick Republican Nay
Anthony M. Bucco Republican Nay
Kristin M. Corrado Republican Nay
Owen Henry Republican Nay
James W. Holzapfel Republican Yea
Declan J. O'Scanlon Jr. Republican Nay
Joseph Pennacchio Republican Nay
Vincent J. Polistina Republican Nay
Holly T. Schepisi Republican Nay
Robert W. Singer Republican Nay
Parker Space Republican Nay
Douglas J. Steinhardt Republican Nay
Michael L. Testa Jr. Republican Nay
Latham Tiver Republican Nay

Official roll call →

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does A 4531 do?
Electric vehicle supply equip-estab alternative compliance standards for devel
Who sponsors A 4531?
A 4531 is sponsored by Diegnan, Patrick J., Wimberly, Benjie E., Clinton Calabrese (Democrat), Linda S. Carter (Democrat), and Robert J. Karabinchak (Democrat).
What is the current status of A 4531?
This bill has been introduced in the General Assembly. Introduced March 10, 2026. It must pass committee before a floor vote.
Where can I track A 4531?
Track A 4531 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on A 4531

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of A 4531

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →