A 4531 — Establishes alternative compliance standards for development of electric vehicle supply equipment and Make-Ready parking spaces based on charging capacity.
Last action — APP
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed General Assembly
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill has been introduced in the General Assembly. Introduced March 10, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
In plain language
The bill establishes alternative compliance standards for electric vehicle charging infrastructure development.
This bill allows developers to meet electric vehicle supply equipment requirements using alternative standards based on charging capacity rather than just the number of parking spaces. It is aimed at facilitating more effective electric vehicle charging infrastructure development.
What this means for you
- Small Business: This bill may provide flexibility for small businesses in meeting electric vehicle charging infrastructure requirements.
Summary
Electric vehicle supply equip-estab alternative compliance standards for devel
Bill Text
What changed in the latest version
74 added · 60 removedPlain-language change summary
The amendment to the bill changes the definition of a compliance method related to electric vehicle charging from a "power allocation method" to an "alternative compliance method." The new definition focuses on total electric vehicle charging capacity, specifying that it can only be used if the charging equipment provides a minimum output of 50 kilowatts per charging port. This change may affect how developers and owners meet requirements for electric vehicle supply equipment installation.
A4531 1R2R [First[Second Reprint] ASSEMBLY, No.
KARABINCHAK District 18 (Middlesex) Senator PATRICK J. SYNOPSIS Establishes alternative compliance standards for development of electric vehicle supply equipment and Make-Ready parking spaces based on charging capacity.
DIEGNAN, CURRENTJR. VERSION OF TEXT As reported by the Assembly Transportation and Independent Authorities Committee on March 16, 2026, with amendments.
District 18 (Middlesex) Senator BENJIE E.
WIMBERLY District 35 (Bergen and Passaic) SYNOPSIS Establishes alternative compliance standards for development of electric vehicle supply equipment and Make-Ready parking spaces based on charging capacity.
CURRENT VERSION OF TEXT As amended by the Senate on May 28, 2026.
a. a. P.L.2021, c.171 (C.40:55D-66.18 et seq.) establishes requirements for the installation of electric vehicle supply equipment and Make-Ready parking spaces in connection with certain development approvals.
c. c. Different categories of development and parking facilities involve varying parking durations and charging needs.
e. e. Therefore, the Legislature determines it is in the public interest to authorize an alternative method of compliance, based on total electric vehicle charging capacity, as determined in accordance with uniform, Statewide standards, while preserving existing statutory requirements and ensuring uniform, Statewide standards.
2. 2. As used in P.L. , c. (C. ) (pending before the Legislature as this bill): bill): "Charging capacity" means the total rated electrical output in kilowatts available for electric vehicle charging at a site or parking facility.
1["Power2"Alternative allocationcompliance method" means a compliance method based on total electric vehicle charging capacity rather than the number of electricparking vehiclespaces supply equipped parkingwith spaces.]1electric "Electric vehicle supply equipment"equipment. orThis "EVSE"method meansmay thebe equipment, including the cables, cords, conductors, connectors, couplers, enclosures, attachment plugs, power outlets, power electronics, transformer, switchgear, switches and controls, network interfaces, point-of-sale equipment, and associated apparatus designed and used foronly thewhere purpose of transferring energy from the electric vehicle supply system to a plug-in electric vehicle. "EVSE" may deliver either alternating current or, consistent with fast charging equipment standards,utilized directprovides currenta electricity. rated "EVSE" is synonymous with "electric vehicle charging station."output "Make-Ready" means the pre-wiring of electrical infrastructure at a parking space, or set of parking spaces, to facilitate easy and cost-efficient future installation of EVSE 1,1 including, but not limitedless to,than Level50 Twokilowatts EVSEper andcharging directport.2 current fast"Charging chargerscapacity" (DCFC). means 1"1 Make-Ready 1"1 includes expenses related to service panels, junction boxes, conduit, wiring, and other components necessary to make a particular location able to accommodate EVSE on a "plug and play" basis. For the purposetotal ofrated thiselectrical definition,output Levelin 2kilowatts EVSEavailable operatesfor onelectric avehicle 40charging toat amp breaker on a 208site or 240parking voltfacility. AC circuit. DCFC operates on a 60 amp or higher breaker on a 480 volt or higher three phase circuit with special grounding equipment. DCFC stations can also be referred to as rapid charging stations.
1"Power1["Power allocation method" means a compliance method based on total charging capacity rather than the number of electric vehicle supply equipped parking spaces.1spaces.]1 3. "Electric Notwithstandingvehicle supply equipment" or "EVSE" means the provisionsequipment, including the cables, cords, conductors, connectors, couplers, enclosures, attachment plugs, power outlets, power electronics, transformer, switchgear, switches and controls, network interfaces, point-of-sale equipment, and associated apparatus designed and used for the purpose of subsectionstransferring a.energy from the electric supply system to a plug-in electric vehicle.
and "EVSE" b.may deliver either alternating current or, consistent with fast charging equipment standards, direct current electricity.
of "EVSE" sectionis 3synonymous with "electric vehicle charging station." "Make-Ready" means the pre-wiring of P.L.2021,electrical c.171infrastructure (C.40:55D-66.20),at a developerparking space, or ownerset subjectof parking spaces, to thefacilitate requirementseasy and cost-efficient future installation of thatEVSE 1,1 including, sectionbut maynot satisfylimited theto, requirementsLevel forTwo theEVSE installationand ofdirect electriccurrent vehiclefast supplychargers equipment(DCFC). or1"1 Make-Ready 1"1 includes Make-Readyexpenses parkingrelated spacesto byservice either:panels, junction boxes, conduit, wiring, and other components necessary to make a particular location able to accommodate EVSE on a "plug and play" basis.
For a. the complyingpurpose withof thethis applicabledefinition, requirementsLevel based2 EVSE operates on thea number40 ofto parking100 spacesamp preparedbreaker withon electrica vehicle208 supplyor equipment240 volt AC circuit. DCFC operates on a 60 amp or Make-Readyhigher equipment,breaker ason otherwisea provided480 byvolt law;or higher three phase circuit with special grounding equipment.
DCFC stations can also be referred to as rapid charging stations.
2[1"Power allocation method" means a compliance method based on total charging capacity rather than the number of electric vehicle supply equipped parking spaces.1]2 3. Notwithstanding the provisions of 2[subsections a.
and] subsection2 b.
of section 3 of P.L.2021, c.171 (C.40:55D-66.20), a developer or owner 2of a gasoline service station or retail establishment that is located on a highway that is part of the National Highway System but is not part of the Interstate System, or within three miles driving distance of a limited access highway exit or interchange2 subject to the requirements of that section may satisfy the requirements for the installation of electric vehicle supply equipment or Make-Ready parking spaces by either:
a. complying with the applicable requirements based on the number of parking spaces prepared with electric vehicle supply equipment or Make-Ready equipment, as otherwise provided by law;
(1) (1) minimum electric vehicle charging capacity requirements, which may be determined based on:
and (b) (b) the category or use of the development or parking facility, including but not limited to retail, multifamily residential, office, mixed-use, or other nonresidential uses;
(2) (2) equivalency standards for different types of electric vehicle supply equipment, based on rated charging capacity and other relevant technical characteristics;
(3) (3) standards addressing accessibility requirements applicable to electric vehicle charging infrastructure;
(4) (4) standards addressing safety considerations, including electrical, fire, and traffic circulation safety;
(5) (5) standards permitting phased installation of electric vehicle supply equipment or charging capacity over time, consistent with existing statutory timelines;
and (6) (6) standards addressing future expansion capability, including electrical capacity, conduit, and infrastructure planning.
c. c. A municipality or local land use board shall not impose requirements related to electric vehicle charging capacity, electric vehicle supply equipment type, or compliance methodology that are additional to, or inconsistent with, the alternative compliance standards established pursuant to this section.
c. c. The alternative compliance method authorized by P.L. , c. (C. ) (pending before the Legislature as this bill) shall affect only the manner in which compliance with electric vehicle charging infrastructure requirements is measured and shall not be construed to increase, decrease, or otherwise modify minimum parking requirements applicable to a development or parking facility.
c. c. Nothing in P.L. , c. (C. ) (pending before the Legislature as this bill) shall be construed to limit the authority of the Department of Community Affairs to adopt or enforce standards necessary to ensure compliance with accessibility, safety, and construction requirements applicable to electric vehicle supply equipment and associated infrastructure.
c. c. Nothing in this section shall be construed to expand or diminish municipal authority beyond that otherwise provided by law.
Action History
-
APP
-
PA PBH
-
R/A 2RAC
-
PS
-
SUB FOR
-
SA 2RS
-
R/S SWR 2RS
-
PA
-
REP 2RA
-
REP/ACA REF ASL
-
INT 1RA REF ATR
Sponsors
- Patrick J. Diegnan · Primary
- Benjie E. Wimberly · Primary
- Clinton Calabrese · Primary
- Linda S. Carter · Primary
- Robert J. Karabinchak · Primary
Sponsorship breakdown
Export CSV (upgrade) →5 sponsors · 0 co-sponsors · 117 not signed on · 18 voted No
Sponsors (5)
- Patrick J. Diegnan
- Benjie E. Wimberly
- Clinton Calabrese Democrat
- Linda S. Carter Democrat
- Robert J. Karabinchak Democrat
Co-sponsors (0)
None.
Not signed on (117)
117 members have not signed on to this bill.
Show all 117 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
Committee ATR
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 10 | 0 | 0 | 0 |
| Republican | 2 | 2 | 0 | 1 |
| Total | 12 | 2 | 0 | 1 |
| % of votes cast | 80% | 13% | 0% | 7% |
How each member voted (15)
| Member | Party | Vote |
|---|---|---|
| Clinton Calabrese | Democrat | Yea |
| Linda S. Carter | Democrat | Yea |
| Robert J. Karabinchak | Democrat | Yea |
| James J. Kennedy | Democrat | Yea |
| Andrew Macurdy | Democrat | Yea |
| William F. Moen Jr. | Democrat | Yea |
| Chigozie U. Onyema | Democrat | Yea |
| William B. Sampson IV | Democrat | Yea |
| Balvir Singh | Democrat | Yea |
| Jerry Walker | Democrat | Yea |
| Robert D. Clifton | Republican | Yea |
| Aura K. Dunn | Republican | Yea |
| Michael Inganamort | Republican | Not Voting |
| Antwan L. McClellan | Republican | Nay |
| Gregory P. McGuckin | Republican | Nay |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Republican | 1 | 14 | 0 | 0 |
| Democratic | 25 | 0 | 0 | 0 |
| Total | 26 | 14 | 0 | 0 |
| % of votes cast | 65% | 35% | 0% | 0% |
How each member voted (40)
Committee ASL
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 5 | 0 | 0 | 0 |
| Republican | 0 | 2 | 0 | 0 |
| Total | 5 | 2 | 0 | 0 |
| % of votes cast | 71% | 29% | 0% | 0% |
How each member voted (7)
| Member | Party | Vote |
|---|---|---|
| Mitchelle Drulis | Democrat | Yea |
| Robert J. Karabinchak | Democrat | Yea |
| Vincent M. Kearney | Democrat | Yea |
| Cody D. Miller | Democrat | Yea |
| Lisa Swain | Democrat | Yea |
| Alex Sauickie | Republican | Nay |
| Erik K. Simonsen | Republican | Nay |
Committees
Frequently asked questions
- What does A 4531 do?
- Electric vehicle supply equip-estab alternative compliance standards for devel
- Who sponsors A 4531?
- A 4531 is sponsored by Diegnan, Patrick J., Wimberly, Benjie E., Clinton Calabrese (Democrat), Linda S. Carter (Democrat), and Robert J. Karabinchak (Democrat).
- What is the current status of A 4531?
- This bill has been introduced in the General Assembly. Introduced March 10, 2026. It must pass committee before a floor vote.
- Where can I track A 4531?
- Track A 4531 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on A 4531
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of A 4531
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →