Energy Department Proposed Rule

2016-06509: Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities

Comment Period Closed

Public comment closed .

Get alerted when the next rule lands

New rules open for comment on their own schedule. Pick how you want to hear about them — we email you when one appears.

Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.

Create a free account & build one →

Summary

The Federal Energy Regulatory Commission (Commission) proposes to revise the pro forma Small Generator Interconnection Agreement (SGIA). The pro forma SGIA establishes the terms and conditions under which public utilities must provide interconnection service to small generating facilities of no larger than 20 megawatts. In this Notice of Proposed Rulemaking, the Commission proposes to modify the pro forma SGIA to require newly interconnecting small generating facilities to ride through abnormal frequency and voltage events and not disconnect during such events. The Commission already requires generators interconnecting under the Large Generator Interconnection Agreement to have this capability, and it would be unduly discriminatory not to also impose these requirements on small generating facilities. The Commission believes that small generating facilities should now have ride through requirements comparable to large generating facilities.

The agency’s own summary, as published.

What this changes

Amends 1 part of the Code of Federal Regulations — the standing rules this notice rewrites.

Don't miss the comment window

One Click Politics alerts you on every deadline, hearing, and rule change.

See all rules with comments due soon →