Transportation Department Docket FAA-2016-5307 Proposed Rule

2016-08111: Airworthiness Directives; General Electric Company Turbofan Engines

Comment Period Closed

Public comment closed .

Get alerted when the next rule lands

New rules open for comment on their own schedule. Pick how you want to hear about them — we email you when one appears.

Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.

Create a free account & build one →

Summary

We propose to adopt a new airworthiness directive (AD) for all General Electric Company (GE) GE90-76B, GE90-77B, GE90-85B, GE90-90B, and GE90-94B turbofan engines with high-pressure compressor (HPC) stage 8-10 spool, part numbers (P/Ns) 1694M80G04, 1844M90G01, or 1844M90G02, installed. This proposed AD was prompted by reports of cracks found on the seal teeth of the HPC stage 8-10 spool. This proposed AD would require eddy current inspections (ECIs) or fluorescent penetrant inspections (FPIs) of the HPC stage 8-10 spool seal teeth and removing from service those parts that fail inspection. We are proposing this AD to prevent failure of the HPC stage 8-10 spool, uncontained rotor release, damage to the engine, and damage to the airplane.

The agency’s own summary, as published.

What this changes

Amends 1 part of the Code of Federal Regulations — the standing rules this notice rewrites.

Don't miss the comment window

One Click Politics alerts you on every deadline, hearing, and rule change.

See all rules with comments due soon →