Interior Department Docket BSEE-2021-0003 Final Rule

2024-24783: Oil and Gas and Sulfur Operations in the Outer Continental Shelf-High Pressure High Temperature Updates; Correction

Get alerted when the next rule lands

New rules open for comment on their own schedule. Pick how you want to hear about them — we email you when one appears.

Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.

Create a free account & build one →

Summary

BSEE is correcting a final rule that appeared in the Federal Register on August 30, 2024. BSEE is publishing a correction to fix an erroneous statement in the preamble of the final rule. BSEE inadvertently stated it did not receive public comments to an identified section of the rule. However, BSEE had received a comment associated with that section of the rule. BSEE evaluated and addressed that comment in other discussions in the preamble of the final rule.

The agency’s own summary, as published.

The rule, in full

539 words as published, October 25, 2024. View the original →

Federal Register, Volume 89 Issue 207 (Friday, October 25, 2024) [Federal Register Volume 89, Number 207 (Friday, October 25, 2024)] [Rules and Regulations] [Pages 85050-85051] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2024-24783] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF THE INTERIOR Bureau of Safety and Environmental Enforcement 30 CFR Part 250 [Docket ID: BSEE-2021-0003; EEEE500000245E1700D2 ET1SF0000.EAQ000] RIN 1014-AA49 Oil and Gas and Sulfur Operations in the Outer Continental Shelf--High Pressure High Temperature Updates; Correction

Agency

Bureau of Safety and Environmental Enforcement (BSEE), Interior.

Action

Final rule; correction. -----------------------------------------------------------------------

Summary

BSEE is correcting a final rule that appeared in the Federal Register on August 30, 2024. BSEE is publishing a correction to fix an erroneous statement in the preamble of the final rule. BSEE inadvertently stated it did not receive public comments to an identified section of the rule. However, BSEE had received a comment associated with that section of the rule. BSEE evaluated and addressed that comment in other discussions in the preamble of the final rule.

Dates

Effective October 25, 2024.

For Further Information Contact

Kirk Malstrom, Regulations and Standards Branch, (202) 258-1518, or by email: [email protected].

Supplementary Information

In FR Doc. 2024-18598 appearing on page 71088 in the Federal Register of Friday, August 30, 2024, the following corrections to the preamble are made:

1. Under the heading ``How must barrier systems be used (Sec.

250.207)'', which begins near the bottom of the third column on page 71087, the text under the subheading ``Summary of Final Rule Revisions'', which begins near the top of the first column on page 71088, is corrected to read: BSEE received and considered a comment regarding proposed Sec. 250.207 and includes the proposed language in the final rule without change. Summary of Comment: A commenter expressed concerns with the applicability of this section to existing blowout preventer barrier system requirements and asked if new and [[Page 85051]] unusual technology can be a barrier. The commenter also suggested that BSEE include capabilities for one specific type of barrier that can shear and seal pipe used for certain well operations. Response: As discussed in this section and other sections of the final rule preamble, this section would not alter or impact any existing regulations (see summary of proposed rule revisions for this section). BSEE also stated that the New or Unusual Technology Barrier Equipment Conceptual Plan requirements apply to new or unusual technology ``that is identified'' as barrier equipment (see final rule preamble section III for Sec. 250.201). Operators that use new or unusual technology identified as a barrier must comply with the applicable requirements of this final rule (e.g., see Sec. Sec. 250.201, 250.207, and 250.229). BSEE disagrees that changes to this section are necessary. This section does not identify any specific types of barriers, and BSEE's intent is not to limit the use of new or unusual technology by including specific operating capabilities that may not be applicable to all barriers (see final rule preamble section III for Sec. 250.206). This action by the Principal Deputy Assistant Secretary is taken pursuant to an existing delegation of authority. Steven H. Feldgus, Principal Deputy Assistant Secretary, Land and Minerals Management. [FR Doc. 2024-24783 Filed 10-24-24; 8:45 am] BILLING CODE P

What this changes

Amends 1 part of the Code of Federal Regulations — the standing rules this notice rewrites.

Don't miss the comment window

One Click Politics alerts you on every deadline, hearing, and rule change.

See all rules with comments due soon →