Environmental Protection Agency Docket EPA-R01-OW-2017-0528 Proposed Rule

2017-20326: Ocean Disposal; Temporary Modification of an Ocean Dredged Material Disposal Site in Massachusetts Bay

Comment Period Closed

Public comment closed .

Get alerted when the next rule lands

New rules open for comment on their own schedule. Pick how you want to hear about them — we email you when one appears.

Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.

Create a free account & build one →

Summary

The Environmental Protection Agency (EPA) is proposing to approve a temporary modification of the currently-designated Massachusetts Bay Dredged Material Disposal Site (MBDS) pursuant to the Marine Protection, Research, and Sanctuaries Act, as amended (MPRSA). The purpose of this temporary site modification is to allow for the environmental restoration of a particular area adjacent to the currently-designated MBDS (Potential Restoration Area) by temporarily expanding the boundaries of the existing MBDS. The temporary expansion is a circular area that contains the Potential Restoration Area, which includes most of the historic Industrial Waste Site (IWS). Decades ago, the IWS was used for the disposal of barrels containing industrial, chemical and radioactive waste, as well as for the disposal of munitions, ordnance, construction equipment, and contaminated dredged material. The proposed modification of the disposal site boundary will enable the U.S. Army Corps of Engineers (USACE) to place suitable dredged material from Boston Harbor generated during the Deep Draft Navigation Project at the Potential Restoration Area in order to cover the barrels and other wastes disposed there in the past. The Deep Draft Navigation Project includes maintenance dredging in the inner harbor, which includes the expansion of a confined aquatic disposal (CAD) cell and will generate approximately 1 million cubic yards (cy) of dredged material, as well as improvement dredging of the main ship channel, which will generate approximately 11 million cy of dredged material. The existing MBDS will continue to be used for disposal of other dredging projects as usual. The expansion area would be permanently closed upon completion of the Boston Harbor maintenance and improvement projects, while the existing MBDS will remain open for the disposal of suitable dredged material. Like the MBDS, however, the expansion would be subject to ongoing monitoring and management to ensure continued protection of the marine environment.

The agency’s own summary, as published.

What this changes

Amends 1 part of the Code of Federal Regulations — the standing rules this notice rewrites.