Environmental Protection Agency Docket EPA-HQ-OAR-2019-0338 Proposed Rule

2019-17822: Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction On or Before July 17, 2014, and Have Not Been Modified or Reconstructed Since July 17, 2014

Comment Period Closed

Public comment closed .

Get alerted when the next rule lands

New rules open for comment on their own schedule. Pick how you want to hear about them — we email you when one appears.

Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.

Create a free account & build one →

Summary

In this action, the U.S. Environmental Protection Agency (EPA) proposes a federal plan to implement the Emission Guidelines and Compliance Times for Municipal Solid Waste Landfills (2016 MSW Landfills EG) for existing MSW landfills located in states and Indian country where state plans or tribal plans are not in effect. This proposed MSW Landfills Federal Plan includes the same elements as required for a state plan: Identification of legal authority and mechanisms for implementation; inventory of designated facilities; emissions inventory; emission limits; compliance schedules; a process for the EPA or state review of design plans for site-specific gas collection and control systems (GCCS); testing, monitoring, reporting and record keeping requirements; public hearing requirements; and progress reporting requirements. Additionally, this action summarizes implementation and delegation of authority of the MSW Landfills Federal Plan.

The agency’s own summary, as published.

What this changes

Amends 1 part of the Code of Federal Regulations — the standing rules this notice rewrites.

Don't miss the comment window

One Click Politics alerts you on every deadline, hearing, and rule change.

See all rules with comments due soon →