2020-00010: Airworthiness Directives; General Electric Company Turbofan Engines
Public comment closed .
Get alerted when the next rule lands
New rules open for comment on their own schedule. Pick how you want to hear about them — we email you when one appears.
Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.
Create a free account & build one →Summary
The FAA proposes to supersede Airworthiness Directive (AD) 2005-23-09, which applies to all General Electric Company (GE) CF6- 80E1A1, -80E1A2, -80E1A3, -80E1A4, and -80E1A4/B model turbofan engines. AD 2005-23-09 requires initial and repetitive fluorescent- penetrant inspections (FPI) of certain areas of high-pressure compressor (HPC) cases, part number (P/N) 1509M97G07 and P/N 2083M69G03. Since the FAA issued AD 2005-23-09, GE performed an updated lifing analysis on the HPC case. As a result, GE found additional locations on the cases requiring FPI, revised the inspection interval for performing FPI of the existing location, and added an additional P/ N HPC case that requires inspection. This proposed AD would require an update of the Airworthiness Limitations Section (ALS) of GE Engine Manual GEK99376 and the operator's existing continuous airworthiness maintenance program (CAMP). The FAA is proposing this AD to address the unsafe condition on these products.
The agency’s own summary, as published.
What this changes
Amends 1 part of the Code of Federal Regulations — the standing rules this notice rewrites.
Rulemaking docket
We haven’t pulled this rulemaking’s full docket yet. View docket FAA-2019-0800 on Regulations.gov →
Don't miss the comment window
One Click Politics alerts you on every deadline, hearing, and rule change.
See all rules with comments due soon →