2022-23911: Airworthiness Directives; General Electric Company Turbofan Engines
Public comment closed .
Get alerted when the next rule lands
New rules open for comment on their own schedule. Pick how you want to hear about them — we email you when one appears.
Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.
Create a free account & build one →Summary
The FAA proposes to adopt a new airworthiness directive (AD) for certain General Electric Company (GE) GE90-76B, GE90-85B, GE90-90B, and GE90-94B model turbofan engines. This proposed AD was prompted by a commanded in-flight shutdown (IFSD) due to cracking and rockback of the high-pressure turbine (HPT) stage 2 nozzles resulting in blade liberation, severe rotor imbalance, and liberation of the exhaust centerbody. This proposed AD would require initial and repetitive borescope inspections (BSIs) of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles and, depending on the results of the inspections, removal and replacement of the HPT stage 2 nozzles with a part eligible for installation. As a mandatory terminating action to the repetitive BSIs of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles, this proposed AD would require replacement of the HPT stage 2 nozzles. The FAA is proposing this AD to address the unsafe condition on these products.
The agency’s own summary, as published.
What this changes
Amends 1 part of the Code of Federal Regulations — the standing rules this notice rewrites.
Rulemaking docket
We haven’t pulled this rulemaking’s full docket yet. View docket FAA-2022-1240 on Regulations.gov →
Don't miss the comment window
One Click Politics alerts you on every deadline, hearing, and rule change.
See all rules with comments due soon →