Energy Department Final Rule

2017-14473: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps

Get alerted when the next rule lands

New rules open for comment on their own schedule. Pick how you want to hear about them — we email you when one appears.

Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.

Create a free account & build one →

Summary

The Department of Energy (DOE) has postponed the effectiveness of certain provisions of a final rule, published in the Federal Register on January 5, 2017, that amends the test procedure and specific certification, compliance, and enforcement provisions for central air conditioners and heat pumps. Specifically, DOE postponed the effectiveness of two provisions of a recently issued rule that require outdoor unit models to be tested under the outdoor unit with no match if they meet either of the two following conditions: The outdoor unit is approved for use with a refrigerant that has a 95 [deg]F midpoint saturation absolute pressure that is +/- 18 percent of the 95 [deg]F saturation absolute pressure for HCFC-22; or the unit is shipped requiring the addition of more than two pounds of refrigerant to meet the charge required for testing under the rule and the factory charge is not equal to or greater than 70% of the outdoor unit internal volume times the liquid density of refrigerant at 95 [deg]F.

The agency’s own summary, as published.

What this changes

Amends 2 parts of the Code of Federal Regulations — the standing rules this notice rewrites.

Don't miss the comment window

One Click Politics alerts you on every deadline, hearing, and rule change.

See all rules with comments due soon →