Minister of Post-Secondary Education and Future Skills Regulation

B.C. Reg. 111/2026: Amendments to the Minister’s Skilled Trades BC Regulation

Made under the Skilled Trades Bc Act

How does this rule affect your organization? One Click reads it against your profile and tells you, on Canada Federal Legislative Tracking. See plans →

Get alerted when the next rule lands

New rules land on their own schedule. Pick how you want to hear about them — we email you when one appears.

Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.

The rule, in full

406 words as published, July 14, 2026. View the original →

B.C. Reg. 111/2026, deposited July 6, 2026, under the SKILLED TRADES BC ACT [sections 27 (2) and 50 (1)]. Ministerial Order M268/2026, dated July 6, 2026. I, Jessie Sunner, Minister of Post-Secondary Education and Future Skills, order that the Minister’s Skilled Trades BC Regulation, B.C. Reg. 256/2022, is amended as set out in the attached Schedule. — J. SUNNER, Minister of Post-Secondary Education and Future Skills.

Schedule

1 Section 4 of the Minister’s Skilled Trades BC Regulation, B.C. Reg. 256/2022, is amended by striking out ", effective December 1, 2023". 2 Section 2 of the Schedule is amended (a) by renumbering the section as section 2 (1), (b) in subsection (1) by adding "following" after "each of the" and by striking out "trades set out in this schedule" and substituting "trades", and (c) by adding the following subsection: (2) The applicable scope of work set out in this Schedule applies in respect of each of the following skilled trades certification trades, effective July 5, 2027: (a) tower crane operator; (b) mobile crane operator. 3 The following sections are added to the Schedule:

Tower crane operator

11 (1) In this section: "luffing boom" means a boom that is raised and lowered about a pivot point to change the load radius; "tower crane" means a tower crane that (a) uses a horizontal, articulated or luffing boom to lift, position and place loads, and (b) is one of the following: (i) a tower crane erected on site from component parts; (ii) a self-erecting tower crane with a lift capacity of more than 10 t. (2) The prescribed scope of work for a tower crane operator consists of the following: (a) operating a tower crane to lift, position and place loads; (b) performing pre-operational equipment checks and limit tests in respect of a tower crane.

Mobile crane operator

12 (1) In this section, "mobile crane" means a crane that (a) is friction-driven or hydraulic-driven, (b) uses a lattice boom or hydraulic boom to lift, position and place loads, (c) has a lift capacity of more than 80 t, and (d) is mounted on a self-propelled crawler or wheel-mounted mobile base. (2) The prescribed scope of work for a mobile crane operator consists of the following: (a) operating a mobile crane to lift, position and place loads; (b) performing pre-operational equipment checks in respect of a mobile crane; (c) stabilizing a mobile crane prior to lifting a load.