B.C. Reg. 78/2023: Amendments to the Dormancy and Shutdown Regulation and 3 others
Made under the Oil and Gas Activities Act
How does this rule affect your organization? One Click reads it against your profile and tells you, on Canada Federal Legislative Tracking. See plans →
Get alerted when the next rule lands
New rules land on their own schedule. Pick how you want to hear about them — we email you when one appears.
Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.
The rule, in full
3,591 words as published, March 28, 2023. View the original →
B.C. Reg. 78/2023, deposited March 27, 2023, under the OIL AND GAS ACTIVITIES ACT [sections 106, 111 and 112]. Regulation of the Board of the Oil and Gas Commission, dated March 23, 2023. The board of the Oil and Gas Commission orders that, effective January 1, 2024, (a) the Dormancy and Shutdown Regulation, B.C. Reg. 112/2019, is amended as set out in the attached Schedule 1, (b) the Drilling and Production Regulation, B.C. Reg. 282/2010, is amended as set out in the attached Schedule 2, and (c) the Oil and Gas Processing Facility Regulation, B.C. Reg 48/2021, is amended as set out in the attached Schedule 3. — C. HAYMAN, Chair, Board of Directors. Schedule 1 1 The heading to Division 1 of Part 1 of the Dormancy and Shutdown Regulation, B.C. Reg. 112/2019, is repealed and the following substituted: Division 1 – Definitions and Application . 2 Section 1 is amended by repealing the definition of "facility". 3 The following section is added in Division 1 of Part 1:
Application
1.1 (1) This regulation does not apply in relation to the following: (a) a processing facility as defined in section 1 of the Oil and Gas Processing Facility Regulation; (b) an LNG facility as defined in section 1 of the Liquefied Natural Gas Facility Regulation. (2) For certainty, this regulation applies in relation to a facility whether or not the facility is associated with a well. Schedule 2 1 The heading to Part 1 of the Drilling and Production Regulation, B.C. Reg. 282/2010, is repealed and the following substituted: Part 1 – Definitions and Application . 2 Section 1 is amended (a) by repealing the definition of "facility", and (b) by adding the following definition: "production tank" means a tank used to receive and store produced or waste liquids at a facility, but does not include a tank used to receive and store liquids only during maintenance operations or process upsets; . 3 The following section is added in Part 1:
Application
1.1 Subject to section 22 of the Oil and Gas Processing Facility Regulation, this regulation does not apply in relation to the following: (a) a processing facility as defined in section 1 of the Oil and Gas Processing Facility Regulation; (b) an LNG facility as defined in section 1 of the Liquefied Natural Gas Facility Regulation. 4 Section 4 (1) is amended by repealing paragraph (m.1) and substituting the following: (m.1) section 41.1; . 5 Section 41 is amended by adding the following subsection: (4.01) A well permit holder must ensure that the emissions of gas from a surface casing vent flow do not exceed 100 m3 per day. 6 Section 41.1 is amended (a) in subsection (1) by adding the following definition: "water source well" has the same meaning as in section 1 of the Petroleum and Natural Gas Act. , and (b) by repealing subsections (2) to (7) and substituting the following: (2) Subject to subsections (7) to (9), a facility permit holder must, each calendar year, carry out at least the following surveys of the facility, including, without limitation, any pneumatic devices at the facility: (a) the number of comprehensive surveys determined in accordance with subsection (3), if the facility is one of the following: (i) a gas processing plant; (ii) a compressor station; (iii) a battery, other than a satellite battery; (iv) a processing battery; (v) a natural gas liquid fractionation facility; (vi) a compressor dehydrator facility; (b) one comprehensive survey, if the facility is one of the following and is pressurized 91 days or more in the calendar year: (i) an injection or disposal facility that processes or uses natural gas; (ii) a tank terminal that processes or uses natural gas; (iii) a pump station that processes or uses natural gas; (iv) a satellite battery; (v) a gas dehydrator facility; (c) one screening survey, if the facility is a gas sales meter facility and is pressurized 91 days or more in the calendar year. (3) The number of comprehensive surveys of a facility referred to in subsection (2) (a) required in a calendar year is the number set out in column 2 of the following table opposite the number of days the facility is pressurized in the calendar year set out in column 1: Column 1 Days pressurized per calendar year | Column 2 Surveys required per calendar year 0 – 30 | 0 31 – 121 | 1 122 – 243 | 2 244 – 365 | 3 (4) The facility permit holder of a facility referred to in subsection (2) must (a) maintain a record of the number of days that the facility was pressurized in each calendar year, and (b) submit the record to the commission by March 31 of the calendar year after the calendar year to which the record relates. (5) Subject to subsections (7) to (9), the well permit holder of a well, other than a water source well, a water injection well or a water disposal well, that is pressurized 91 days or more in a calendar year must carry out at least the following surveys of the well in the calendar year: (a) one comprehensive survey, if the well (i) has a production tank, or (ii) is producing from an unconventional zone listed in Schedule 2; (b) in any other case, one screening survey. (6) Subject to subsections (7) to (9), a survey required under this section must be carried out no sooner than the following interval after the previous required survey: (a) in the case of a facility described in subsection (2) (a), 60 days; (b) in the case of a facility described in subsection (2) (b) or (c) or a well described in subsection (5) (a) or (b), 9 months. (7) A permit holder who carries out a comprehensive survey of a facility under subsection (2) (a) or (b) or a well under subsection (5) (a) must at the same time carry out a comprehensive survey of each other facility and well of the permit holder that is located at the same site. (8) A permit holder who carries out a screening survey of a facility referred to in subsection (2) (c) must at the same time carry out a screening survey of each other facility, and each well, of the permit holder that is located at the same site. (9) A requirement for a permit holder to carry out a screening survey of a facility or well under this section is met if the permit holder carries out a comprehensive survey of the facility or well. (10) If a leak is detected at a facility or well during a comprehensive survey required under this section, the permit holder of the facility or well must measure the leak unless (a) it is unsafe to measure the leak, (b) the leak is inaccessible, or (c) the leak flow rate is outside the range of the measurement device. (11) If a leak referred to in subsection (10) cannot be measured, the permit holder must quantify the leak rate using an engineering estimate or by applying an emission factor. (12) A facility permit holder must (a) repair a leak detected at a facility during a survey required under this section as follows: (i) if the repair does not require equipment to be shut down, within 30 days of detection; (ii) if the repair requires equipment to be shut down, as soon as practicable, but no later than the next turnaround for the facility, and (b) if the leak is repaired more than 30 days after detection, maintain, for at least 2 years from the date of the repair, a record of the reasons for the repair timeline. (13) A well permit holder must repair a leak detected at a well during a survey required under this section within 30 days of detection. (14) A permit holder must (a) prepare a leak detection and repair report for each survey carried out during a calendar year of a well or facility of the permit holder, and (b) submit the report to the commission by March 31 of the calendar year after the calendar year to which the report relates. (15) A leak detection and repair report must include the following information: (a) the site identification number provided to the permit holder by the commission; (b) if more than one survey of the well or facility per year is required under this section, the survey sequence number; (c) the number of days the facility or well was pressurized during the calendar year; (d) the date the survey was carried out; (e) the name of the company that carried out the survey; (f) whether the survey was a comprehensive survey or a screening survey; (g) if the survey was a comprehensive survey, the make and model of the detection instrument used; (h) the name, job title and business contact information, including email address and telephone number, of the individual primarily responsible for submitting the report; (i) for each leak detected, the following: (i) a unique leak identifier; (ii) the type of equipment component at which the leak was detected; (iii) whether the leak was identified in a previous survey and not repaired; (iv) whether the leak contained hydrogen sulphide; (v) quantification of the leak rate in m3/hour; (vi) the method used to quantify the leak rate; (vii) if the leak rate was measured, the make and model of the device used to measure the leak; (viii) if the leak rate was quantified using an engineering estimate or by applying an emission factor, the reason that the leak was not measured; (ix) if the leak was repaired, the date and method of repair. (16) A permit holder must maintain, for at least 7 years from the date a leak detection and repair report is submitted, records respecting the information included in the report, including, without limitation, the following: (a) for each individual who participated in carrying out the survey, a record of the individual’s training relating to carrying out surveys under this section; (b) a record of the repair of each leak; (c) for each leak that was not repaired within 30 days of detection, a record of the reason for the repair timeline. 7 Section 44 is amended (a) by renumbering the section as section 44 (1), (b) by adding the following after subsection (1) (b): (b.1) if the hydrogen sulphide content of the gas to be flared does not exceed one mole percent, that unsupervised flare stacks where continuous flaring will occur are (i) equipped with a continuous monitoring device that monitors whether a flame is present, or (ii) inspected at least every 7 days to determine whether a flame is present; , and (c) by adding the following after subsection (1): (2) A permit holder must maintain records of inspections under subsection (1) (b.1) (ii). 8 Section 52.01 is repealed. 9 Section 52.02 is amended (a) in subsection (1) by striking out "who operates" and substituting "of", (b) by repealing subsection (1) (a) and substituting the following: (a) the equipment is operated at least 95% of the time that the facility is in operation, , and (c) in subsection (2) by striking out "who operates" and substituting "of". 10 Section 52.03 is amended (a) in subsections (1) and (2) by striking out "who operates" and substituting "of" and by striking out "tanks" and substituting "uncontrolled production tanks", and (b) by repealing subsections (3) and (4) and substituting the following: (3) A facility permit holder of a facility that includes an uncontrolled production tank must (a) maintain a record of the volume, in m3, of natural gas emitted from the production tank during each calendar month in each calendar year, and (b) submit the record to the commission by March 31 of the calendar year after the calendar year to which the record relates. (4) A facility permit holder of a facility that includes an uncontrolled production tank must maintain, for at least 7 years from the date a record is submitted under subsection (3), all records of equipment and methods used to quantify the volume of natural gas reported. 11 Section 52.04 is repealed and the following substituted: 52.04 (1) In this section, "average vent gas rate", in relation to a fleet of reciprocating compressors, means the rate calculated in accordance with the following formula: where n | = | the number of reciprocating compressors in the fleet; v | = | the vent gas volume, in m3, for the calendar year for each reciprocating compressor; t | = | the number of hours per calendar year that each reciprocating compressor is pressurized; c | = | the number of pressurized throws for each reciprocating compressor; "fleet of reciprocating compressors", in relation to a facility permit holder, means all of the following reciprocating compressors used at facilities of the facility permit holder, whether or not under the same permit: (a) reciprocating compressors that (i) are rated at 75 kW or more, (ii) are pressurized for 450 hours or more per year, and (iii) were installed before January 1, 2021; (b) reciprocating compressors that (i) have fewer than 4 throws, (ii) are rated at 75 kW or more, (iii) are pressurized for 450 hours or more per year, and (iv) were installed on or after January 1, 2021. (2) A facility permit holder of a facility that uses a reciprocating compressor described in paragraph (a) or (b) in the definition of "fleet of reciprocating compressors" in subsection (1) or a centrifugal compressor described in subsection (8) must, at least once each calendar year, measure the volume of natural gas emitted from each compressor seal during a 15-minute period that is representative of the normal operating conditions of the compressor. (3) A facility permit holder of a facility that uses a reciprocating compressor described in subsection (4) must ensure that emissions of gas from the compressor seals (a) are routed to hydrocarbon gas conservation equipment, or (b) subject to sections 42 to 44, are flared. (4) Subsection (3) applies in relation to a reciprocating compressor that (a) has 4 or more throws, (b) is rated at 75 kW or more, (c) is pressurized for 450 hours or more per year, and (d) was installed on or after January 1, 2021. (5) A facility permit holder who uses a fleet of reciprocating compressors must ensure that (a) the venting of seal gas from each throw does not exceed 5 m3 per hour, and (b) the average vent gas rate for the fleet for each calendar year does not exceed 0.83 m3 per hour per throw. (6) A facility permit holder who uses a fleet of reciprocating compressors must (a) maintain a record of the average vent gas rate for the fleet for each calendar year, and (b) submit the record to the commission by March 31 of the calendar year after the calendar year to which the record relates. (7) A facility permit holder who uses a fleet of reciprocating compressors must maintain, for at least 7 years from the date a record is submitted under subsection (6) (b), records of the following information for each reciprocating compressor within the fleet: (a) the facility identification number provided to the permit holder by the commission; (b) a unique compressor identifier; (c) the compressor power rating, in kW; (d) the date the compressor was installed; (e) the number of throws; (f) the number of hours the compressor was pressurized; (g) the date each compressor seal was tested; (h) the equipment used for each compressor seal test; (i) equipment calibration records for the equipment used; (j) the date each compressor seal was installed; (k) the results of each compressor seal test by volume, in m3, of natural gas emissions. (8) A facility permit holder of a facility that uses a centrifugal compressor that is rated at 75 kw or more and is pressurized for 450 hours or more per year must ensure that the vent gas rate for the compressor is lower than the following: (a) if the compressor was installed before January 1, 2021, 10.20 m3 per hour per compressor body; (b) if the compressor was installed on or after January 1, 2021, 3.40 m3 per hour per compressor body. (9) A facility permit holder of a facility that uses a centrifugal compressor described in subsection (8) must (a) prepare a compressor seal test report for the compressor each calendar year, and (b) submit the report to the commission by March 31 of the calendar year after the calendar year to which the report relates. (10) A compressor seal test report under subsection (9) must include the following information: (a) the facility identification number provided to the permit holder by the commission; (b) a unique compressor identifier; (c) the number of compressor bodies; (d) whether each seal type is wet or dry; (e) the results of each compressor seal test by volume, in m3, of natural gas emissions. (11) A facility permit holder of a facility that uses a centrifugal compressor described in subsection (8) must maintain, for at least 7 years from the date a compressor seal test report is submitted under subsection (9) (b), records respecting the information included in the report, including, without limitation, the following: (a) the date each compressor seal was tested; (b) the equipment used for each compressor seal test; (c) equipment calibration records for the equipment used; (d) the date each compressor seal was installed. 12 Section 52.05 is amended (a) in subsection (2) by striking out "who operates" and substituting "of", (b) in subsections (3) and (4) striking out "Beginning on January 1, 2022, a facility permit holder who operates" and substituting "A facility permit holder of", (c) in subsection (5) by striking out "Subject to subsection (6), a facility permit holder who operates" and substituting "A facility permit holder of", (d) by repealing subsection (6), and (e) by adding the following subsections: (7) A facility permit holder who uses, in accordance with the requirements set out in subsection (4) (b), a pneumatic device that emits natural gas must maintain a record of the signed statement referred to in subsection (4) (b) (i) for at least 7 years from the date of the statement. (8) An official may grant to a permit holder an exemption in writing from the application of one or more of subsections (2), (3) or (4) if the official is satisfied that, in the circumstances, (a) compliance with the provision or provisions is not reasonably practicable, or (b) the exemption is in the public interest. (9) In granting an exemption under subsection (8), an official may impose any conditions on the exemption that the official considers necessary. (10) This section does not apply in relation to a pneumatic device that uses propane. 13 Section 52.06 is amended (a) in subsection (1) by striking out "who operates" and substituting "of", (b) in subsection (2) by striking out "Beginning on January 1, 2021, a facility permit holder who operates" and substituting "A facility permit holder of", and (c) by adding the following subsection: (3) This section does not apply in relation to a pneumatic pump that uses propane. 14 Section 52.07 is amended (a) in subsection (1) by striking out "Beginning on January 1, 2022, a facility permit holder who operates" and substituting "A facility permit holder of", and (b) in subsection (2) by striking out "Beginning on January 1, 2022, a permit holder who operates" and substituting "A facility permit holder of". 15 Section 52.08 is amended (a) in subsections (1) to (3) by striking out "who operates" and substituting "of", and (b) in subsection (3) (b) by striking out "July 1" and substituting "March 31". 16 Sections 52.09 and 52.10 are amended by striking out "who operates" and substituting "of". 17 Section 52.11 is repealed. 18 Section 52.12 is amended (a) by striking out "who operates" and substituting "of", and (b) in paragraphs (a) and (b) by striking out "section 52.04 (7) (c)" and substituting "section 52.04 (7) (k) and (10) (e)". 19 The following Division is added to Part 7: Division 3 – Records and Reports
Records and reports
52.13 The following records and reports under this Part are prescribed for the purposes of section 38 (1) (a) of the Act: (a) a record or report required to be submitted or maintained under section 41.1; (b) a record required to be maintained under section 44 (2); (c) a record or report required to be submitted or maintained under Division 2 of Part 7. Schedule 3 1 Section 21 of the Oil and Gas Processing Facility Regulation, B.C. Reg. 48/2021, is amended by adding the following subsection: (4) A processing facility permit holder must ensure that an unsupervised flare stack at a gas processing plant where continuous flaring will occur is (a) equipped with a continuous monitoring device that monitors whether a flame is present, or (b) inspected at least every 7 days to determine whether a flame is present. 2 Section 22 is amended (a) in subsection (1) by striking out "sections" and substituting "provisions" and by striking out "gas processing facility" and substituting "gas processing plant", (b) by repealing subsection (1) (b) and (c) and substituting the following: (b) Division 2 [natural gas emissions] of Part 7; (c) section 52.13 (a) and (c) [records and reports]. , and (c) by repealing subsection (2). 3 Section 26 (d) is amended by adding "and inspections required under section 21 (4) (b)" after "section 21 (3) [venting and flaring]".