British Columbia Assessment Authority Regulation

B.C. Reg. 300/2020: Amendments to the Telecommunications Corporations Valuation Regulation

Made under the Assessment Act

How does this rule affect your organization? One Click reads it against your profile and tells you, on Canada Federal Legislative Tracking. See plans →

Get alerted when the next rule lands

New rules land on their own schedule. Pick how you want to hear about them — we email you when one appears.

Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.

The rule, in full

371 words as published, December 22, 2020. View the original →

B.C. Reg. 300/2020, deposited December 21, 2020, under the ASSESSMENT ACT [section 21 (1)]. Regulation of the British Columbia Assessment Authority, dated December 21, 2020. The British Columbia Assessment Authority orders that the Telecommunications Corporations Valuation Regulation, B.C. Reg. 226/86, is amended as set out in the attached Schedule. — S. BISHOP, Chair, Board of Directors.

Schedule

1 Section 2 of the Telecommunications Corporations Valuation Regulation, B.C. Reg. 226/86, is amended by striking out "2020" and substituting "2021". 2 Section 3 is amended by striking out "$511" and substituting "$529". 3 Section 4 (2) is amended by repealing Tables 1 and 3 and substituting the following:

Table 1 – Base Fibre Costs

Fibre Count | Single Armoured $ per Kilometre | Double Armoured $ per Kilometre | Aerial $ per Kilometre | Submarine $ per Kilometre 0 to 6 fibres | 310 | 460 | 310 | 2 330 7 to 12 fibres | 650 | 960 | 650 | 6 180 13 to 24 fibres | 740 | 1 010 | 740 | 6 320 25 to 48 fibres | 1 070 | 1 530 | 1 270 | 7 660 49 to 96 fibres | 1 810 | 2 280 | 2 020 | 8 250 97 to 144 fibres | 2 170 | 2 550 | 2 380 145 to 216 fibres | 2 550 | 2 870 | 2 710 217 to 288 fibres | 3 990 | 4 310 | 4 140 289 to 432 fibres | 5 680 433 to 864 fibres | 10 680

Table 3 – Base Installation Costs

Installation Type | $ per Kilometre Aerial | 5 350 Ploughed cable no conduit | 6 910 Ploughed cable and 2 conduits | 9 570 Pulled through existing conduit | 3 610 Submarine | 41 130 Trenched cable and 2 conduits | 59 100 Trenched 2 conduits no cable | 56 580 Ploughed 2 conduits no cable | 8 680 Conduit | 2 440 Submarine mobilization charge | 4 500 4 Section 9 is amended by striking out "$390" and substituting "$407". 5 Section 11.1 is repealed. 6 Appendix A is repealed and the attached Appendix A substituted.

Appendix A