B.C. Reg. 244/2019: Reviewable Projects Transition Regulation
Made under the Environmental Assessment Act
How does this rule affect your organization? One Click reads it against your profile and tells you, on Canada Federal Legislative Tracking. See plans →
Get alerted when the next rule lands
New rules land on their own schedule. Pick how you want to hear about them — we email you when one appears.
Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.
The rule, in full
4,875 words as published, December 03, 2019. View the original →
B.C. Reg. 244/2019, deposited November 29, 2019, under the ENVIRONMENTAL ASSESSMENT ACT [section 9]. Order in Council 608/2019, approved and ordered November 29, 2019. On the recommendation of the undersigned, the Lieutenant Governor, by and with the advice and consent of the Executive Council, orders that the attached Reviewable Projects Transition Regulation is made. — G. HEYMAN, Minister of Environment and Climate Change Strategy; C. JAMES, Presiding Member of the Executive Council.
REVIEWABLE PROJECTS TRANSITION REGULATION
Definitions
1 In this regulation: "Act" means the Environmental Assessment Act; "authorization" means a certificate, bylaw, permit, licence, agreement, publication or other authorization and includes an exemption from a requirement to obtain any of them.
Transition
2 Despite anything in the Reviewable Projects Regulation, a project is not a reviewable project for the purposes of section 9 of the Act if, (a) immediately before this regulation comes into force, the project (i) is substantially started, and (ii) is not a reviewable project under the Environmental Assessment Act, S.B.C. 2002, c. 43, as it read immediately before its repeal, or (b) the project is (i) in a category described in column 1 of the following table, and (ii) has been issued, by the date this regulation comes into force, at least one of the authorizations set out in column 2 opposite the project category described in column 1: Column 1 Project Class (References in parentheses are to items in the Reviewable Projects Regulation) | Column 2 Required Authorizations 1 Organic and inorganic chemical industries (Table 1, items 1 to 10) 2 Forest products – pulp manufacturing (Table 4, item 1) 3 Forest products – integrated paper or paperboard manufacturing (Table 4, item 2) 4 Forest products – non-integrated paper and paperboard manufacturing (Table 4, item 3) 5 Forest products industries – wood preservation (Table 4, item 4) 6 Pharmaceutical products manufacturing (Table 5, item 1) 7 Artificial and synthetic fibres and filaments manufacturing (Table 5, item 2) 8 Textile and fabric finishing (Table 5, item 3) | 1 | Organic and inorganic chemical industries (Table 1, items 1 to 10) | 2 | Forest products – pulp manufacturing (Table 4, item 1) | 3 | Forest products – integrated paper or paperboard manufacturing (Table 4, item 2) | 4 | Forest products – non-integrated paper and paperboard manufacturing (Table 4, item 3) | 5 | Forest products industries – wood preservation (Table 4, item 4) | 6 | Pharmaceutical products manufacturing (Table 5, item 1) | 7 | Artificial and synthetic fibres and filaments manufacturing (Table 5, item 2) | 8 | Textile and fabric finishing (Table 5, item 3) | (a) an authorization referred to in section 6 of the Environmental Management Act, or (b) an authorization under section 30 or 31 of the Environmental Management Act. | (a) | an authorization referred to in section 6 of the Environmental Management Act, or | (b) | an authorization under section 30 or 31 of the Environmental Management Act. 1 | Organic and inorganic chemical industries (Table 1, items 1 to 10) 2 | Forest products – pulp manufacturing (Table 4, item 1) 3 | Forest products – integrated paper or paperboard manufacturing (Table 4, item 2) 4 | Forest products – non-integrated paper and paperboard manufacturing (Table 4, item 3) 5 | Forest products industries – wood preservation (Table 4, item 4) 6 | Pharmaceutical products manufacturing (Table 5, item 1) 7 | Artificial and synthetic fibres and filaments manufacturing (Table 5, item 2) 8 | Textile and fabric finishing (Table 5, item 3) (a) | an authorization referred to in section 6 of the Environmental Management Act, or (b) | an authorization under section 30 or 31 of the Environmental Management Act. 9 All other non-metallic mineral product manufacturing (Table 3, item 4) 10 Forest products – sawmills (Table 4, item 5) 11 Forest products – veneer and plywood (Table 4, items 6 and 7) 12 Forest products – particle board and fibreboard mills (Table 4, item 8) 13 Forest products – waferboard mills (Table 4, item 9) | 9 | All other non-metallic mineral product manufacturing (Table 3, item 4) | 10 | Forest products – sawmills (Table 4, item 5) | 11 | Forest products – veneer and plywood (Table 4, items 6 and 7) | 12 | Forest products – particle board and fibreboard mills (Table 4, item 8) | 13 | Forest products – waferboard mills (Table 4, item 9) | (a) an authorization referred to in section 6 of the Environmental Management Act, or (b) an authorization under section 30 or 31 of the Environmental Management Act. | (a) | an authorization referred to in section 6 of the Environmental Management Act, or | (b) | an authorization under section 30 or 31 of the Environmental Management Act. 9 | All other non-metallic mineral product manufacturing (Table 3, item 4) 10 | Forest products – sawmills (Table 4, item 5) 11 | Forest products – veneer and plywood (Table 4, items 6 and 7) 12 | Forest products – particle board and fibreboard mills (Table 4, item 8) 13 | Forest products – waferboard mills (Table 4, item 9) (a) | an authorization referred to in section 6 of the Environmental Management Act, or (b) | an authorization under section 30 or 31 of the Environmental Management Act. 14 Primary metals industries (Table 2, items 1 to 3) 15 Non-metallic mineral products – cement, glass and lime manufacturing (Table 3, items 1 to 3) 16 Tire manufacturing – (Table 5, item 4) 17 Leather and hide finishing – (Table 5, item 5) 18 Lead-acid battery manufacturing – (Table 5, item 6) | 14 | Primary metals industries (Table 2, items 1 to 3) | 15 | Non-metallic mineral products – cement, glass and lime manufacturing (Table 3, items 1 to 3) | 16 | Tire manufacturing – (Table 5, item 4) | 17 | Leather and hide finishing – (Table 5, item 5) | 18 | Lead-acid battery manufacturing – (Table 5, item 6) | (a) an authorization referred to in section 6 of the Environmental Management Act, or (b) an authorization under section 30 or 31 of the Environmental Management Act. | (a) | an authorization referred to in section 6 of the Environmental Management Act, or | (b) | an authorization under section 30 or 31 of the Environmental Management Act. 14 | Primary metals industries (Table 2, items 1 to 3) 15 | Non-metallic mineral products – cement, glass and lime manufacturing (Table 3, items 1 to 3) 16 | Tire manufacturing – (Table 5, item 4) 17 | Leather and hide finishing – (Table 5, item 5) 18 | Lead-acid battery manufacturing – (Table 5, item 6) (a) | an authorization referred to in section 6 of the Environmental Management Act, or (b) | an authorization under section 30 or 31 of the Environmental Management Act. 19 Coal mines (Table 6, item 1) 20 Mineral mines (Table 6, item 2) 21 Sand and gravel operations (Table 6, item 3) 22 Placer mines (Table 6, item 4) 23 Construction stone and industrial mineral quarries (Table 6, item 5) | 19 | Coal mines (Table 6, item 1) | 20 | Mineral mines (Table 6, item 2) | 21 | Sand and gravel operations (Table 6, item 3) | 22 | Placer mines (Table 6, item 4) | 23 | Construction stone and industrial mineral quarries (Table 6, item 5) | (a) a permit issued under section 10 or 11 of the Mines Act, excluding any permit to carry out exploration activities as defined in the Health Safety and Reclamation Code for Mines in British Columbia. | (a) | a permit issued under section 10 or 11 of the Mines Act, excluding any permit to carry out exploration activities as defined in the Health Safety and Reclamation Code for Mines in British Columbia. 19 | Coal mines (Table 6, item 1) 20 | Mineral mines (Table 6, item 2) 21 | Sand and gravel operations (Table 6, item 3) 22 | Placer mines (Table 6, item 4) 23 | Construction stone and industrial mineral quarries (Table 6, item 5) (a) | a permit issued under section 10 or 11 of the Mines Act, excluding any permit to carry out exploration activities as defined in the Health Safety and Reclamation Code for Mines in British Columbia. 24 Transmission lines (Table 7, item 2) 25 Transmission pipelines (Table 8, item 4) | 24 | Transmission lines (Table 7, item 2) | 25 | Transmission pipelines (Table 8, item 4) | (a) a permit under section 25 of the Oil and Gas Activities Act, (b) a licence of occupation under section 39 of the Land Act, (c) a right of way or easement under section 40 of the Land Act or (d) a right relating to the acquisition of, or access through or over, any private land. | (a) | a permit under section 25 of the Oil and Gas Activities Act, | (b) | a licence of occupation under section 39 of the Land Act, | (c) | a right of way or easement under section 40 of the Land Act or | (d) | a right relating to the acquisition of, or access through or over, any private land. 24 | Transmission lines (Table 7, item 2) 25 | Transmission pipelines (Table 8, item 4) (a) | a permit under section 25 of the Oil and Gas Activities Act, (b) | a licence of occupation under section 39 of the Land Act, (c) | a right of way or easement under section 40 of the Land Act or (d) | a right relating to the acquisition of, or access through or over, any private land. 26 Energy storage facilities (Table 8, item 1) 27 Oil refineries (Table 8, item 2) 28 Natural gas processing plants (Table 8, item 3) | 26 | Energy storage facilities (Table 8, item 1) | 27 | Oil refineries (Table 8, item 2) | 28 | Natural gas processing plants (Table 8, item 3) | (a) a permit under section 25 of the Oil and Gas Activities Act, (b) an authorization referred to in section 6 of the Environmental Management Act, or (c) an authorization under section 30 or 31 of the Environmental Management Act. | (a) | a permit under section 25 of the Oil and Gas Activities Act, | (b) | an authorization referred to in section 6 of the Environmental Management Act, or | (c) | an authorization under section 30 or 31 of the Environmental Management Act. 26 | Energy storage facilities (Table 8, item 1) 27 | Oil refineries (Table 8, item 2) 28 | Natural gas processing plants (Table 8, item 3) (a) | a permit under section 25 of the Oil and Gas Activities Act, (b) | an authorization referred to in section 6 of the Environmental Management Act, or (c) | an authorization under section 30 or 31 of the Environmental Management Act. 29 Power plants (the part of Table 7, item 1 that pertains to thermal electric power plants) | 29 | Power plants (the part of Table 7, item 1 that pertains to thermal electric power plants) | (a) an authorization referred to in section 6 of the Environmental Management Act, or (b) an authorization under section 30 or 31 of the Environmental Management Act. | (a) | an authorization referred to in section 6 of the Environmental Management Act, or | (b) | an authorization under section 30 or 31 of the Environmental Management Act. 29 | Power plants (the part of Table 7, item 1 that pertains to thermal electric power plants) (a) | an authorization referred to in section 6 of the Environmental Management Act, or (b) | an authorization under section 30 or 31 of the Environmental Management Act. 30 Power plants (the part of Table 7, item 1 that pertains to hydroelectric power plants) | 30 | Power plants (the part of Table 7, item 1 that pertains to hydroelectric power plants) | (a) a licence or permit issued under the Water Sustainability Act. | (a) | a licence or permit issued under the Water Sustainability Act. 30 | Power plants (the part of Table 7, item 1 that pertains to hydroelectric power plants) (a) | a licence or permit issued under the Water Sustainability Act. 31 Power plants (the part of Table 7, item 1 that pertains to land-based wind generating projects) | 31 | Power plants (the part of Table 7, item 1 that pertains to land-based wind generating projects) | (a) a licence of occupation under section 39 of the Land Act, (b) a right of way or easement under section 40 of the Land Act, (c) a right relating to the acquisition of, or access through or over, any private land, (d) a change to the boundary or area of a tree farm licence, first nations woodland licence, or woodlot licence in accordance with sections 39.1, 43.57 and 47.1 of the Forest Act, or (e) the disposition of land under the Land Act in accordance with section 5 of the Forest Act. | (a) | a licence of occupation under section 39 of the Land Act, | (b) | a right of way or easement under section 40 of the Land Act, | (c) | a right relating to the acquisition of, or access through or over, any private land, | (d) | a change to the boundary or area of a tree farm licence, first nations woodland licence, or woodlot licence in accordance with sections 39.1, 43.57 and 47.1 of the Forest Act, or | (e) | the disposition of land under the Land Act in accordance with section 5 of the Forest Act. 31 | Power plants (the part of Table 7, item 1 that pertains to land-based wind generating projects) (a) | a licence of occupation under section 39 of the Land Act, (b) | a right of way or easement under section 40 of the Land Act, (c) | a right relating to the acquisition of, or access through or over, any private land, (d) | a change to the boundary or area of a tree farm licence, first nations woodland licence, or woodlot licence in accordance with sections 39.1, 43.57 and 47.1 of the Forest Act, or (e) | the disposition of land under the Land Act in accordance with section 5 of the Forest Act. 32 Power plants (the part of Table 7, item 1 that pertains to in-stream tidal or tidal power projects and wind generating facilities with at least one turbine located in water) | 32 | Power plants (the part of Table 7, item 1 that pertains to in-stream tidal or tidal power projects and wind generating facilities with at least one turbine located in water) | (a) if land below the natural boundary of a marine coastline or marine estuary is to be occupied, used or directly disturbed, (i) a lease issued under section 38 of the Land Act with respect to that land, or (ii) a licence of occupation issued under section 39 of the Land Act with respect to that land. | (a) | if land below the natural boundary of a marine coastline or marine estuary is to be occupied, used or directly disturbed, | (i) | a lease issued under section 38 of the Land Act with respect to that land, or | (ii) | a licence of occupation issued under section 39 of the Land Act with respect to that land. 32 | Power plants (the part of Table 7, item 1 that pertains to in-stream tidal or tidal power projects and wind generating facilities with at least one turbine located in water) (a) | if land below the natural boundary of a marine coastline or marine estuary is to be occupied, used or directly disturbed, (i) | a lease issued under section 38 of the Land Act with respect to that land, or (ii) | a licence of occupation issued under section 39 of the Land Act with respect to that land. 33 Dams (Table 9, item 1) 34 Dikes (Table 9, item 2) 35 Water diversion projects (Table 9, item 3) 36 Groundwater extraction projects (Table 9, item 4) 37 Shoreline modification projects (Table 9, item 5) | 33 | Dams (Table 9, item 1) | 34 | Dikes (Table 9, item 2) | 35 | Water diversion projects (Table 9, item 3) | 36 | Groundwater extraction projects (Table 9, item 4) | 37 | Shoreline modification projects (Table 9, item 5) | (a) a permit or licence issued under the Water Sustainability Act, or (b) if land below the natural boundary of a stream, estuary or marine coastline is to be occupied, used or directly disturbed, (i) a lease issued under section 38 of the Land Act with respect to that land, or (ii) a licence of occupation issued under section 39 of the Land Act with respect to that land. | (a) | a permit or licence issued under the Water Sustainability Act, or | (b) | if land below the natural boundary of a stream, estuary or marine coastline is to be occupied, used or directly disturbed, | (i) | a lease issued under section 38 of the Land Act with respect to that land, or | (ii) | a licence of occupation issued under section 39 of the Land Act with respect to that land. 33 | Dams (Table 9, item 1) 34 | Dikes (Table 9, item 2) 35 | Water diversion projects (Table 9, item 3) 36 | Groundwater extraction projects (Table 9, item 4) 37 | Shoreline modification projects (Table 9, item 5) (a) | a permit or licence issued under the Water Sustainability Act, or (b) | if land below the natural boundary of a stream, estuary or marine coastline is to be occupied, used or directly disturbed, (i) | a lease issued under section 38 of the Land Act with respect to that land, or (ii) | a licence of occupation issued under section 39 of the Land Act with respect to that land. 38 Hazardous waste facilities (Table 10, item 1) | 38 | Hazardous waste facilities (Table 10, item 1) | (a) a permit under section 14 of the Environmental Management Act, or (b) applicable of the plans referred to in section 4 of the Hazardous Waste Regulation, B.C. Reg. 63/88, under the Environmental Management Act. | (a) | a permit under section 14 of the Environmental Management Act, or | (b) | applicable of the plans referred to in section 4 of the Hazardous Waste Regulation, B.C. Reg. 63/88, under the Environmental Management Act. 38 | Hazardous waste facilities (Table 10, item 1) (a) | a permit under section 14 of the Environmental Management Act, or (b) | applicable of the plans referred to in section 4 of the Hazardous Waste Regulation, B.C. Reg. 63/88, under the Environmental Management Act. 39 Solid waste management facilities (Table 11, item 1) 40 Local government liquid waste management facilities (Table 12, item 1) | 39 | Solid waste management facilities (Table 11, item 1) | 40 | Local government liquid waste management facilities (Table 12, item 1) | (a) an authorization referred to in section 6 of the Environmental Management Act, (b) an authorization under section 30 or 31 of the Environmental Management Act, (c) an operational certificate under section 28 of the Environmental Management Act, or (d) an exemption referred to in section 5 of the Municipal Wastewater Regulation, B.C. Reg. 87/2012. | (a) | an authorization referred to in section 6 of the Environmental Management Act, | (b) | an authorization under section 30 or 31 of the Environmental Management Act, | (c) | an operational certificate under section 28 of the Environmental Management Act, or | (d) | an exemption referred to in section 5 of the Municipal Wastewater Regulation, B.C. Reg. 87/2012. 39 | Solid waste management facilities (Table 11, item 1) 40 | Local government liquid waste management facilities (Table 12, item 1) (a) | an authorization referred to in section 6 of the Environmental Management Act, (b) | an authorization under section 30 or 31 of the Environmental Management Act, (c) | an operational certificate under section 28 of the Environmental Management Act, or (d) | an exemption referred to in section 5 of the Municipal Wastewater Regulation, B.C. Reg. 87/2012. 41 Railways (Table 13, item 2) 42 Airports (Table 13, item 5 ) | 41 | Railways (Table 13, item 2) | 42 | Airports (Table 13, item 5 ) | (a) a licence of occupation under section 39 of the Land Act, (b) a right of way or easement under section 40 of the Land Act, or (c) a right relating to the acquisition of, or access through or over, any private land. | (a) | a licence of occupation under section 39 of the Land Act, | (b) | a right of way or easement under section 40 of the Land Act, or | (c) | a right relating to the acquisition of, or access through or over, any private land. 41 | Railways (Table 13, item 2) 42 | Airports (Table 13, item 5 ) (a) | a licence of occupation under section 39 of the Land Act, (b) | a right of way or easement under section 40 of the Land Act, or (c) | a right relating to the acquisition of, or access through or over, any private land. 43 Ferry terminal (Table 13, item 3) 44 Marine port projects (Table 13, item 4) | 43 | Ferry terminal (Table 13, item 3) | 44 | Marine port projects (Table 13, item 4) | (a) a right relating to the acquisition of, or access through or over, any private land, or (b) if land below the natural boundary of a marine coastline or marine estuary is to be occupied, used or directly disturbed, (i) a lease issued under section 38 of the Land Act with respect to that land, or (ii) a licence of occupation issued under section 39 of the Land Act with respect to that land. | (a) | a right relating to the acquisition of, or access through or over, any private land, or | (b) | if land below the natural boundary of a marine coastline or marine estuary is to be occupied, used or directly disturbed, | (i) | a lease issued under section 38 of the Land Act with respect to that land, or | (ii) | a licence of occupation issued under section 39 of the Land Act with respect to that land. 43 | Ferry terminal (Table 13, item 3) 44 | Marine port projects (Table 13, item 4) (a) | a right relating to the acquisition of, or access through or over, any private land, or (b) | if land below the natural boundary of a marine coastline or marine estuary is to be occupied, used or directly disturbed, (i) | a lease issued under section 38 of the Land Act with respect to that land, or (ii) | a licence of occupation issued under section 39 of the Land Act with respect to that land. 45 Resort development – not golf, marina or ski (the parts of Table 14, item 1 that pertain to resorts – not golf, marina or ski, that are located partially or entirely on Crown land) 46 Golf resorts (the parts of Table 14, item 2 that pertain to golf resorts that are located partially or entirely on Crown land) 47 Marina resorts (the parts of Table 14, item 3 that pertain to marina resorts that are located partially or entirely on Crown land) 48 Ski resorts (the parts of Table 14, item 4 that pertain to ski resorts that are located partially or entirely on Crown land) | 45 | Resort development – not golf, marina or ski (the parts of Table 14, item 1 that pertain to resorts – not golf, marina or ski, that are located partially or entirely on Crown land) | 46 | Golf resorts (the parts of Table 14, item 2 that pertain to golf resorts that are located partially or entirely on Crown land) | 47 | Marina resorts (the parts of Table 14, item 3 that pertain to marina resorts that are located partially or entirely on Crown land) | 48 | Ski resorts (the parts of Table 14, item 4 that pertain to ski resorts that are located partially or entirely on Crown land) | (a) Master Development Agreement entered into with the government, (b) Operating Agreement entered into with the government, or (c) approval of an All Season Resort Policy Master Plan or a Resort Master Plan in accordance with the All-Seasons Resort Policy. | (a) | Master Development Agreement entered into with the government, | (b) | Operating Agreement entered into with the government, or | (c) | approval of an All Season Resort Policy Master Plan or a Resort Master Plan in accordance with the All-Seasons Resort Policy. 45 | Resort development – not golf, marina or ski (the parts of Table 14, item 1 that pertain to resorts – not golf, marina or ski, that are located partially or entirely on Crown land) 46 | Golf resorts (the parts of Table 14, item 2 that pertain to golf resorts that are located partially or entirely on Crown land) 47 | Marina resorts (the parts of Table 14, item 3 that pertain to marina resorts that are located partially or entirely on Crown land) 48 | Ski resorts (the parts of Table 14, item 4 that pertain to ski resorts that are located partially or entirely on Crown land) (a) | Master Development Agreement entered into with the government, (b) | Operating Agreement entered into with the government, or (c) | approval of an All Season Resort Policy Master Plan or a Resort Master Plan in accordance with the All-Seasons Resort Policy. 49 Resort development – not golf, marina or ski (the parts of Table 14, item 1 that pertain to resorts – not golf, marina or ski – that are located entirely on private land) 50 Golf resorts (the parts of Table 14, item 2 that pertain to golf resorts that are located entirely on private land) 51 Marina resorts (the parts of Table 14, item 3 that pertain to marina resorts that are located entirely on private land) 52 Ski resorts (the parts of Table 14, item 4 that pertain to ski resorts that are located entirely on private land) | 49 | Resort development – not golf, marina or ski (the parts of Table 14, item 1 that pertain to resorts – not golf, marina or ski – that are located entirely on private land) | 50 | Golf resorts (the parts of Table 14, item 2 that pertain to golf resorts that are located entirely on private land) | 51 | Marina resorts (the parts of Table 14, item 3 that pertain to marina resorts that are located entirely on private land) | 52 | Ski resorts (the parts of Table 14, item 4 that pertain to ski resorts that are located entirely on private land) | (a) an authorization referred to in section 6 of the Environmental Management Act, or (b) an authorization under section 30 or 31 of the Environmental Management Act. | (a) | an authorization referred to in section 6 of the Environmental Management Act, or | (b) | an authorization under section 30 or 31 of the Environmental Management Act. 49 | Resort development – not golf, marina or ski (the parts of Table 14, item 1 that pertain to resorts – not golf, marina or ski – that are located entirely on private land) 50 | Golf resorts (the parts of Table 14, item 2 that pertain to golf resorts that are located entirely on private land) 51 | Marina resorts (the parts of Table 14, item 3 that pertain to marina resorts that are located entirely on private land) 52 | Ski resorts (the parts of Table 14, item 4 that pertain to ski resorts that are located entirely on private land) (a) | an authorization referred to in section 6 of the Environmental Management Act, or (b) | an authorization under section 30 or 31 of the Environmental Management Act. 53 Public highways (Table 13, item 1) | 53 | Public highways (Table 13, item 1) | (a) an authorization by the government to expend funds on the project, or (b) publication by the government of intention to obtain services for the construction of the project. | (a) | an authorization by the government to expend funds on the project, or | (b) | publication by the government of intention to obtain services for the construction of the project. 53 | Public highways (Table 13, item 1) (a) | an authorization by the government to expend funds on the project, or (b) | publication by the government of intention to obtain services for the construction of the project.