Environmental Protection Agency Docket EPA-R10-OAR-2026-0498 Final Rule

2026-10738: Air Plan Approval; ID; Update to Materials Incorporated by Reference

Get alerted when the next rule lands

New rules open for comment on their own schedule. Pick how you want to hear about them — we email you when one appears.

Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.

Create a free account & build one →

Summary

The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Idaho State Implementation Plan (SIP). The regulations affected by this update have been previously submitted by Idaho and approved by the EPA. This update affects the materials that are available for public inspection at the EPA Regional Office and the National Archives and Records Administration (NARA). In this action, the EPA is also notifying the public that we are correcting a typographical error.

The agency’s own summary, as published.

The rule, in full

5,982 words as published, May 29, 2026. View the original →

Federal Register, Volume 91 Issue 103 (Friday, May 29, 2026) [Federal Register Volume 91, Number 103 (Friday, May 29, 2026)] [Rules and Regulations] [Pages 31932-31939] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2026-10738] ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R10-OAR-2026-0498; FRL-13207-01-R10] Air Plan Approval; ID; Update to Materials Incorporated by Reference

Agency

Environmental Protection Agency (EPA).

Action

Final rule; administrative change. -----------------------------------------------------------------------

Summary

The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Idaho State Implementation Plan (SIP). The regulations affected by this update have been previously submitted by Idaho and approved by the EPA. This update affects the materials that are available for public inspection at the EPA Regional Office and the National Archives and Records Administration (NARA). In this action, the EPA is also notifying the public that we are correcting a typographical error.

Dates

This action is effective May 29, 2026.

Addresses

The SIP materials for which incorporation by reference into 40 CFR part 52 is finalized through this action are available for inspection at the following locations: Environmental Protection Agency, Region 10, 1200 Sixth Avenue, Suite 155, Seattle, WA 98101; and www.regulations.gov. To view the materials at the Region 10 Office, the EPA requests that you email the contact listed in the FOR FURTHER INFORMATION CONTACT section to schedule your inspection. The Regional Office's official hours of business are Monday through Friday 8:30 a.m. to 4:30 p.m., excluding Federal holidays.

For Further Information Contact

Jeff Hunt, EPA Region 10, 1200 Sixth Avenue--Suite 155, Seattle, WA 98101, at (206) 553-0256, or [email protected].

Supplementary Information

I. Background

Each State has a SIP containing the control measures and strategies used to attain and maintain the national ambient air quality standards (NAAQS). The SIP is extensive, containing such elements as air pollution control regulations, emission inventories, monitoring networks, attainment demonstrations, and enforcement mechanisms. Each State must formally adopt the control measures and strategies in the SIP after the public has had an opportunity to comment on them and then submit the proposed SIP revisions to the EPA. Once these control measures and strategies are approved by EPA, and after notice and comment, they are incorporated into the federally approved SIP and are identified in part 52, ``Approval and Promulgation of Implementation Plans,'' of title 40 of the Code of Federal Regulations (40 CFR part 52). The full text of the State regulation approved by the EPA is not reproduced in its entirety in 40 CFR part 52 but is ``incorporated by reference.'' This means that the EPA has approved a given State regulation or specified changes to the given regulation with a specific effective date. The public is referred to the location of the full text version should they want to know which measures are contained in a given SIP. The information provided allows the EPA and the public to monitor the extent to which a State implements a SIP to attain and maintain the NAAQS and to take enforcement action for violations of the SIP. The SIP is a living document which the State can revise as necessary to address the unique air pollution problems in the State. Therefore, the EPA from time to time must take action on proposed revisions containing new or revised State regulations. A submission from a State can revise one or more rules in their entirety, or portions of rules. The State indicates the changes in the submission (such as by using redline/strikethrough text) and the EPA then takes action on the requested changes. The EPA establishes a docket for its actions using a unique Docket Identification Number, which is listed in each action. These dockets and the complete submission are available for viewing on www.regulations.gov. On May 22, 1997 (62 FR 27968), the EPA revised the procedures for incorporating by reference, into the Code of Federal Regulations, materials approved by the EPA into each SIP. These changes revised the format for the identification of the SIP in 40 CFR part 52, streamlined the mechanisms for announcing the EPA approval of revisions to a SIP, and streamlined the mechanisms for the EPA's updating of the IBR information contained for each SIP in 40 CFR part 52. The revised procedures also called for the EPA to maintain ``SIP Compilations'' that contain the federally approved regulations and source-specific permits submitted by each State agency. The EPA generally updates these SIP Compilations every few years. Under the revised procedures, the EPA must periodically publish an informational document in the rules section of the Federal Register notifying the public that updates have been made to a SIP Compilation for a particular state. The EPA began applying the revised IBR procedures to the Idaho SIP on January 25, 2005 (70 FR 3479) and subsequently published updates to the IBR materials in the Idaho SIP on December 28, 2012 (77 FR 76417), April 1, 2015 (80 FR 17333), July 24, 2020 (85 FR 44741), November 18, 2024 (89 FR 90592), and June 27, 2025 (90 FR 27470).

II. EPA Action

In this action, the EPA is providing notification of an update to the materials incorporated by reference into the Idaho SIP as of January 6, 2026, and identified in 40 CFR 52.670(c) and (d). This update includes SIP materials submitted by Idaho and approved by the EPA since the last IBR update. See 90 FR 27470 (June 27, 2025). This action also corrects a minor typographical error from a previous EPA approval for the P4 Production LLC, Soda Springs, Idaho facility in which we inadvertently cited the nonexistent permit condition ``13.33'' instead of the correct citation ``13.23.'' See 90 FR 42821 (September 5, 2025).

III. Good Cause Exemption

The EPA has determined that this action falls under the ``good cause'' exemption in section 553(b)(3)(B) of the Administrative Procedure Act (APA) which, upon finding ``good cause,'' authorizes agencies to dispense with public participation and section 553(d)(3) which allows an agency to make an action effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). This administrative action simply codifies provisions which are already in effect as a matter of law in Federal and approved state programs and makes a correction a table in the CFR. Under section 553 of the APA, an agency may find good cause where procedures are ``impracticable, unnecessary, or contrary to the public interest.'' Public comment for this administrative action is ``unnecessary'' and ``contrary to the public interest'' since the codification (and corrections) only reflect existing law. Immediate notice of this action in the Federal Register benefits the public by providing the public notification of the updated Idaho SIP Compilation and notification of corrections to the Idaho ``Identification of Plan'' portion of the CFR. Further, pursuant to section 553(d)(3), making this action [[Page 31933]] immediately effective benefits the public by immediately updating both the SIP Compilation and the CFR ``Identification of plan'' section (which includes table entry corrections).

IV. Incorporation by Reference

In this document, the EPA is finalizing regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, the EPA is finalizing the incorporation by reference of regulations promulgated by Idaho previously approved by the EPA and federally effective before January 6, 2026, contained in 40 CFR 52.670(c) and (d) as described in section I of this preamble. The EPA has made, and will continue to make, these materials generally available through www.regulations.gov and at the EPA Region 10 Office (please contact the person identified in the FOR FURTHER INFORMATION CONTACT section of this preamble for more information).

V. Statutory and Executive Order Reviews

Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the provisions of the Clean Air Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, the EPA's role is to approve State choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves State law as meeting Federal requirements and does not impose additional requirements beyond those imposed by State law. For that reason, this action: Is not a significant regulatory action subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Is not an Executive Order 14192 (90 FR 9065, February 6, 2025) regulatory action because this action is not significant under Executive Order 12866; Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.); Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.); Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4); Does not have federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999); Is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997) because it approves a State program; Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001); and Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act. In addition, this action is not approved to apply on any Indian reservation land or in any other area where the EPA or an Indian Tribe has demonstrated that a Tribe has jurisdiction. In those areas of Indian country, the rule does not have Tribal implications and will not impose substantial direct costs on Tribal Governments or preempt Tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). This action is subject to the Congressional Review Act, and the EPA will submit a rule report to each House of the Congress and to the Comptroller General of the United States. This action is not a ``major rule'' as defined by 5 U.S.C. 804(2). The EPA also believes that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. This is because prior EPA rulemaking actions for each individual component of the Idaho SIP Compilation previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, the EPA believes judicial review of this action under section 307(b)(1) is not available. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds. Dated: May 18, 2026. Emma Pokon, Regional Administrator, Region 10. For the reasons set forth in the preamble, 40 CFR part 52 is amended as follows: PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS 0

1. The authority citation for part 52 continues to read as follows:

Authority: 42 U.S.C. 7401 et seq. Subpart N--Idaho 0

2. Amend Sec. 52.670 by:

0 a. Revising paragraph (b); 0 b. Republishing paragraph (c); and 0 c. Revising paragraph (d). The revisions and republication read as follows: Sec. 52.670 Identification of plan. * * * * * (b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to January 6, 2026, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval and notification of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after January 6, 2026, will be incorporated by reference in the next update to the SIP compilation. (2) EPA Region 10 certifies that the rules/regulations provided by the EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section. (3) Copies of the materials incorporated by reference may be inspected at the Region 10 EPA Office at 1200 Sixth Avenue, Suite 155, Seattle, WA 98101. To obtain the material, please call (206) 553-0256. You may inspect the material with an EPA approval date prior to January 6, 2026, for Idaho at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA email [email protected] or go to http://www.archives.gov/federal-register/cfr/ibr-locations.html. (c) EPA approved laws and regulations. [[Page 31934]] Table 1 to Paragraph (c)--State Regulations ---------------------------------------------------------------------------------------------------------------- State citation Title/subject State effective date EPA approval date Explanations ---------------------------------------------------------------------------------------------------------------- Rules for the Control of Air Pollution in Idaho (IDAPA 58.01.01) ---------------------------------------------------------------------------------------------------------------- 001............... Title and scope........... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 005............... Definitions............... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 006............... General definitions....... 3/28/2023........... 12/5/2024, 89 FR Except subsections 96554 006.23, 006.24, 006.25, 006.30, 006.31.b, 006.49, 006.50, 006.51. 007............... Definitions for the 3/28/2023........... 12/5/2024, 89 FR .................... purposes of sections 200 96554 through 225 and 400 through 461. 107............... Incorporations by 7/1/2024............ 12/5/2024, 89 FR Except subsections reference. 96554 107.06 through 107.16. 108............... Obligation to comply...... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 121............... Compliance requirements by 3/28/2023........... 12/5/2024, 89 FR .................... department. 96554 122............... Information orders by the 3/28/2023........... 12/5/2024, 89 FR .................... department. 96554 123............... Certification of documents 3/28/2023........... 12/5/2024, 89 FR .................... 96554 125............... False statements.......... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 126............... Tampering................. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 130............... Startup, shutdown, 7/1/2024............ 12/5/2024, 89 FR .................... scheduled maintenance, 96554 safety measures, upset and breakdown. 131............... Excess emissions.......... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 132............... Correction of condition... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 133............... Startup, shutdown and 3/28/2023........... 12/5/2024, 89 FR .................... scheduled maintenance 96554 requirements. 134............... Upset, breakdown and 3/28/2023........... 12/5/2024, 89 FR .................... safety requirements. 96554 135............... Excess emissions reports.. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 136............... Excess emissions records.. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 155............... Circumvention............. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 156............... Total compliance.......... 5/1/1994............ 1/16/2003, 68 FR .................... 2217 157............... Test methods and 3/28/2023........... 12/5/2024, 89 FR .................... procedures. 96554 164............... Polychlorinated biphenyls 3/28/2023........... 12/5/2024, 89 FR .................... (PCBs). 96554 175............... Procedures and 3/28/2023........... 12/5/2024, 89 FR .................... requirements for permits 96554 establishing a facility emissions cap. 176............... Facility emissions cap.... 3/28/2023........... 12/5/2024, 89 FR Except for 96554 provisions relating to hazardous air pollutants. 177............... Application procedures.... 4/11/2015........... 8/12/2016, 81 FR .................... 53290 178............... Standard contents of 3/28/2023........... 12/5/2024, 89 FR .................... permits establishing a 96554 facility emissions cap. 179............... Procedures for issuing 3/28/2023........... 12/5/2024, 89 FR .................... permits establishing a 96554 facility emissions cap. 180............... Revisions to permits 3/28/2023........... 12/5/2024, 89 FR .................... establishing a facility 96554 emissions cap. 181............... Notice and record-keeping 3/28/2023........... 12/5/2024, 89 FR .................... of estimates of ambient 96554 concentrations. 200............... Procedures and 3/28/2023........... 12/5/2024, 89 FR .................... requirements for permits 96554 to construct. 201............... Permit to construct 3/28/2023........... 12/5/2024, 89 FR .................... required. 96554 202............... Application procedures.... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 203............... Permit requirements for 3/28/2023........... 12/5/2024, 89 FR Except subsection new and modified 96554 203.03. stationary sources. 204............... Permit requirements for 3/28/2023........... 12/5/2024, 89 FR .................... new major facilities or 96554 major modifications in nonattainment areas. 205............... Permit requirements for 3/28/2023........... 12/5/2024, 89 FR .................... new major facilities or 96554 major modifications in attainment or unclassifiable areas. 206............... Optional offsets for 3/28/2023........... 12/5/2024, 89 FR .................... permits to construct. 96554 207............... Requirements for emission 5/1/1994............ 1/16/2003, 68 FR .................... reduction credit. 2217 208............... Demonstration of net air 3/28/2023........... 12/5/2024, 89 FR .................... quality benefit. 96554 209............... Procedure for issuing 3/28/2023........... 12/5/2024, 89 FR .................... permits. 96554 211............... Conditions for permits to 3/28/2023........... 12/5/2024, 89 FR .................... construct. 96554 212............... Relaxation of standards or 3/28/2023........... 12/5/2024, 89 FR .................... restrictions. 96554 213............... Pre-permit construction... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 220............... General exemption criteria 3/28/2023........... 12/5/2024, 89 FR .................... for permit to construct 96554 exemptions. 221............... Category I exemption...... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 222............... Category II exemption..... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 226............... Payment of fees for 3/28/2023........... 12/5/2024, 89 FR .................... permits to construct. 96554 227............... Receipt and usage of fees. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 400............... Procedures and 3/28/2023........... 12/5/2024, 89 FR .................... requirements for Tier II 96554 operating permits. [[Page 31935]] 401............... Tier II operating permit.. 3/28/2023........... 12/5/2024, 89 FR Except subsections 96554 401.01.a and 401.04. 402............... Application procedures.... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 403............... Permit requirements for 3/28/2023........... 12/5/2024, 89 FR .................... Tier II sources. 96554 404............... Procedure for issuing 3/28/2023........... 12/5/2024, 89 FR .................... permits. 96554 405............... Conditions for Tier II 3/28/2023........... 12/5/2024, 89 FR .................... operating permits. 96554 460............... Requirements for emission 3/28/2023........... 12/5/2024, 89 FR .................... reduction credit. 96554 461............... Requirements for banking 3/28/2023........... 12/5/2024, 89 FR .................... emission reduction 96554 credits (ERC's). 500............... Registration procedures 3/28/2023........... 12/5/2024, 89 FR .................... and requirements for 96554 portable equipment. 510............... Stack heights and 3/28/2023........... 12/5/2024, 89 FR .................... dispersion techniques. 96554 511............... Requirements.............. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 512............... Opportunity for public 3/28/2023........... 12/5/2024, 89 FR .................... hearing. 96554 513............... Approval of field studies 3/28/2023........... 12/5/2024, 89 FR .................... and fluid models. 96554 514............... No restriction on actual 3/28/2023........... 12/5/2024, 89 FR .................... stack height. 96554 550............... Air quality episodes...... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 556............... Criteria for declaring air 3/28/2023........... 12/5/2024, 89 FR .................... quality episodes. 96554 557............... Requirements during air 3/28/2023........... 12/5/2024, 89 FR .................... quality episodes. 96554 558............... Notification of air 3/28/2023........... 12/5/2024, 89 FR .................... quality episode. 96554 562............... Specific air quality 3/28/2023........... 12/5/2024, 89 FR .................... episode abatement plans 96554 for stationary sources. 563............... Transportation conformity. 3/30/2001........... 4/12/2001, 66 FR .................... 18873 564............... Incorporation by reference 3/30/2001........... 4/12/2001, 66 FR .................... 18873 565............... Abbreviations............. 3/30/2001........... 4/12/2001, 66 FR .................... 18873 566............... Definitions for the 3/30/2001........... 4/12/2001, 66 FR .................... purpose of sections 563 18873 through 574 and 582. 567............... Agencies affected by 3/30/2001........... 4/12/2001 66 FR .................... consultation. 18873 568............... ICC member roles in 3/30/2001........... 4/12/2001, 66 FR .................... consultation. 18873 569............... ICC member 3/30/2001........... 4/12/2001, 66 FR .................... responsibilities in 18873 Consultation. 570............... General consultation 3/30/2001........... 4/12/2001, 66 FR .................... process. 18873 571............... Consultation procedures... 3/30/2001........... 4/12/2001, 66 FR .................... 18873 572............... Final conformity 3/30/2001........... 4/12/2001, 66 FR .................... determinations by USDOT. 18873 573............... Resolving conflicts....... 3/30/2001........... 4/12/2001, 66 FR .................... 18873 574............... Public consultation 3/30/2001........... 4/12/2001, 66 FR .................... procedures. 18873 579............... Baselines for prevention 3/28/2023........... 12/5/2024, 89 FR .................... of significant 96554 deterioration. 580............... Classification of 3/28/2023........... 12/5/2024, 89 FR .................... prevention of significant 96554 deterioration areas. 581............... Prevention of significant 3/28/2023........... 12/5/2024, 89 FR .................... deterioration (PSD) 96554 increments. 600............... Rules for control of open 3/28/2023........... 12/5/2024, 89 FR .................... burning. 96554 601............... Fire permits, hazardous 3/28/2023........... 12/5/2024, 89 FR .................... materials, and liability. 96554 602............... Nonpreemption of other 3/28/2023........... 12/5/2024, 89 FR .................... jurisdiction. 96554 603............... General requirements...... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 606............... Categories of allowable 3/28/2023........... 12/5/2024, 89 FR .................... burning. 96554 607............... Recreational and warming 3/28/2023........... 12/5/2024, 89 FR .................... fires. 96554 608............... Weed control fires........ 3/28/2023........... 12/5/2024, 89 FR .................... 96554 609............... Training fires............ 3/28/2023........... 12/5/2024, 89 FR .................... 96554 611............... Residential yard waste 3/28/2023........... 12/5/2024, 89 FR .................... fires. 96554 612............... Solid waste facility fires 3/28/2023........... 12/5/2024, 89 FR .................... 96554 613............... Orchard fires............. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 614............... Prescribed fires.......... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 615............... Dangerous material fires.. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 616............... Infectious waste burning.. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 617............... Crop residue disposal..... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 618............... Permit by rule............ 3/28/2023........... 12/5/2024, 89 FR .................... 96554 619............... Registration.............. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 620............... Burn fee.................. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 621............... Burn approval............. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 622............... General provisions........ 3/28/2023........... 12/5/2024, 89 FR .................... 96554 623............... Public notification....... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 624............... Spot and baled crop 3/28/2023........... 12/5/2024, 89 FR .................... residue burn and propane 96554 flaming requirements. 625............... Visible emissions......... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 650............... Rules for control of 3/28/2023........... 12/5/2024, 89 FR .................... fugitive dust. 96554 651............... General rules............. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 665............... Regional haze rules....... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 666............... Reasonable progress goals. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 667............... Long-term strategy for 3/28/2023........... 12/5/2024, 89 FR .................... regional haze. 96554 675............... Fuel burning equipment-- 3/28/2023........... 12/5/2024, 89 FR .................... particulate matter. 96554 676............... Standards for new sources. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 [[Page 31936]] 677............... Standards for minor and 3/28/2023........... 12/5/2024, 89 FR .................... existing sources. 96554 678............... Combinations of fuels..... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 679............... Averaging period.......... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 680............... Altitude correction....... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 681............... Test methods and 3/28/2023........... 12/5/2024, 89 FR .................... procedures. 96554 700............... Particulate matter-- 3/28/2023........... 12/5/2024, 89 FR .................... process weight 96554 limitations. 701............... Particulate matter--new 3/28/2023........... 12/5/2024, 89 FR .................... equipment process weight 96554 limitations. 702............... Particulate matter-- 3/28/2023........... 12/5/2024, 89 FR .................... existing equipment 96554 process weight limitations. 703............... Particulate matter--other 3/28/2023........... 12/5/2024, 89 FR .................... processes. 96554 725............... Rules for sulfur content 3/28/2023........... 12/5/2024, 89 FR .................... of fuels. 96554 790............... Rule for the control of 3/15/2002........... 8/12/2016, 81 FR .................... nonmetallic mineral 53290 processing plants. 791............... General control 3/28/2023........... 12/5/2024, 89 FR .................... requirements. 96554 793............... Emissions standards for 3/28/2023........... 12/5/2024, 89 FR .................... nonmetallic mineral 96554 processing plants not subject to 40 CFR part 60, subpart OOO. 794............... Permit requirements....... 3/28/2023........... 12/5/2024, 89 FR Except subsection 96554 794.04. 795............... Permit by rule 3/28/2023........... 12/5/2024, 89 FR .................... requirements. 96554 796............... Applicability............. 3/28/2023........... 12/5/2024, 89 FR .................... 96554 797............... Registration for permit by 3/28/2023........... 12/5/2024, 89 FR .................... rule. 96554 798............... Electrical generators..... 3/28/2023........... 12/5/2024, 89 FR .................... 96554 799............... Nonmetallic mineral 3/15/2002........... 8/12/2016, 81 FR .................... processing plan fugitive 53290 dust best management practice. 815............... Rules for control of kraft 3/28/2023........... 12/5/2024, 89 FR .................... pulp mills. 96554 818............... Kraft pulp mill LVHC and 3/28/2023........... 12/5/2024, 89 FR .................... HVLC gas venting 96554 notification and reporting. ---------------------------------------------------------------------------------------------------------------- Table 2 to Paragraph (c)--State Statutes ---------------------------------------------------------------------------------------------------------------- State effective State citation Title/subject date EPA approval date Explanations ---------------------------------------------------------------------------------------------------------------- Section 4 of Senate Bill 1024, Open Burning of 2/26/2019.......... 12/9/2019, 84 FR codified at Idaho Code section Crop Residue. 67189 39-114. Idaho Code section 39-107(1)(a) Board--Composition 7/1/2022........... 5/26/2023, 88 FR To satisfy the -Officers--Compen 34093 requirements of sation--Powers--S CAA section ubpoena--Depositi 128(a)(1) and CAA ons--Review--Rule section s. 110(a)(2)(E)(ii) for all criteria pollutants. Idaho Code section 39.103...... Definitions....... 7/1/2010........... 12/5/2024, 89 FR Except (4), (5), 96554 (8), (9), (10), (12), (13), (14), (15), (16), (17), and (18). ---------------------------------------------------------------------------------------------------------------- Table 3 to Paragraph (c)--City and County Codes and Ordinances ---------------------------------------------------------------------------------------------------------------- State effective State citation Title/subject date EPA approval date Explanations ---------------------------------------------------------------------------------------------------------------- City of Sandpoint Ordinance No. Material 2/22/1994 (City 6/26/2002, 67 FR Sandpoint PM10 939. Specifications adoption date). 43006. Nonattainment for Street Area Plan. Sanding Material. City of Sandpoint Chapter 8 Air Solid Fuel Heating 9/21/2011 (City 4/3/2013, 78 FR Codified version Quality (4-8-1 through 4-8-14). Appliances. adoption date). 20001. of City of Sandpoint Ordinance No. 965 as amended by Ordinance No. 1237 and Ordinance No. 1258. Sandpoint PM10 Limited Maintenance Plan. Boise City Ordinance 4432....... Parking Permits... 8/13/1979 (City 6/6/1985, 50 FR Transportation approval date). 23810. Control Plan for carbon monoxide, Ada County. City of Garden City Ordinance Solid Fuel Heating 5/14/1987, 1/10/ 5/30/1996, 61 FR Northern Ada 514, 533, and 624. Appliance 1989, 9/13/1994 27019. County PM10 Ordinance of the (City approval Nonattainment City of Garden dates). Area Plan. City, Idaho. Meridian Ordinance 667.......... Meridian Clean Air 8/16/1994 (City 5/30/1996, 61 FR Northern Ada Ordinance. approval date). 27019. County PM10 Nonattainment Area Plan. [[Page 31937]] City of Eagle Ordinance 245..... City of Eagle 4/26/1994 (City 5/30/1996, 61 FR Northern Ada Clean Air approval date). 27019. County PM10 Ordinance. Nonattainment Area Plan. Ada County Ordinance 254........ Ada County Clean 11/3/1992 (County 5/30/1996, 61 FR Northern Ada Air Ordinance. adoption date). 27019. County PM10 Nonattainment Area Plan. Table: Ordinance-1.............. Explanation of 12/30/1994 (date 5/30/1996, 61 FR Northern Ada enforcement of table). 27019. County PM10 procedures, Nonattainment responsibilities Area Plan. and sources of funding for the Northern Ada County Wood Burning Control Ordinances. City of Pocatello Ordinance 2450 Residential wood 1/12/1994......... 7/13/2006, 71 FR Portneuf Valley combustion 39574. Nonattainment curtailment Area Plan and ordinance. Maintenance Plan. City of Pocatello Ordinance 2726 Revised air 9/18/2003......... 7/13/2006, 71 FR Portneuf Valley quality 39574. Nonattainment curtailment Area Plan and levels. Maintenance Plan. City of Chubbuck Ordinance 403.. Residential wood 11/23/1993........ 7/13/2006, 71 FR Portneuf Valley combustion 39574. Nonattainment curtailment Area Plan and ordinance. Maintenance Plan. City of Chubbuck Ordinance 582.. Revised air 12/9/2003......... 7/13/2006, 71 FR Portneuf Valley quality 39574. Nonattainment curtailment Area Plan and levels. Maintenance Plan. City of Clifton Ordinance No. Ordinance No. 120. 8/11/2012......... 3/25/2014, 79 FR Except Section 9 120. 16201. (Penalty). City of Dayton Ordinance #287... Ordinance #287.... 8/8/2012.......... 3/25/2014, 79 FR Except Section 9 16201. (Penalty). Franklin City Ordinance No. 2012- Solid Fuel Heating 9/12/2012......... 3/25/2014, 79 FR Except Section 9 9-12. Appliances. 16201. (Penalty). Franklin County Ordinance No. Solid Fuel Heating 6/25/2012......... 3/25/2014, 79 FR Except Section 9 2012-6-25. Appliances. 16201. (Penalty). City of Oxford Memorandum of Solid Fuel Heating 10/22/2012........ 3/25/2014, 79 FR Except #2 of the Understanding. Appliances. 16201. MOA and Section 9 of Exhibit A. City of Preston Ordinance No. Ordinance No. 2012- 6/11/2012......... 3/25/2014, 79 FR Except Section 9 2012-1. 1. 16201. (Penalty). City of Weston Ordinance No. Ordinance No. 2012- 8/1/2012.......... 3/25/2014, 79 FR Except Section 9 2012-01. 01. 16201. (Penalty). ---------------------------------------------------------------------------------------------------------------- (d) EPA approved source-specific requirements. Table 4 to Paragraph (d)--State Source-Specific Requirements \1\ ---------------------------------------------------------------------------------------------------------------- State effective EPA approval Name of source Permit No. date date Explanation ---------------------------------------------------------------------------------------------------------------- LP Wood Polymers, Inc., 001-00115...... 7/12/2002...... 10/27/2003, 68 The following conditions: 1.1, Meridian, Idaho. FR 61106. 1.3, 3.1, and the Appendix. (Boise/Ada County Maintenance Plan). Consolidated Concrete 001-00046...... 12/3/2001...... 10/27/2003, 68 The following conditions: 1.1, Company, Boise, Idaho. FR 61106. 1.3, 2.3, 3.1, 3.2, and the Appendix. (Boise/Ada County Maintenance Plan). Crookham Company, Caldwell, 027-00020...... 1/18/2002...... 10/27/2003, 68 The following conditions: 1.1, Idaho. FR 61106. 1.3, 2.1, 2.3, 3.1, 3.1.1, 3.1.2, 3.2, and the Appendix. (Boise/Ada County Maintenance Plan). Double D Service Center, 001-00168...... 2/4/2002....... 10/27/2003, 68 The following conditions: 1.1, Meridian, Idaho. FR 61106. 1.3, 3.1, 3.2.1, 3.2.2, 3.2.3, and the Appendix. (Boise/Ada County Maintenance Plan). Plum Creek Northwest Lumber, 001-00091...... 7/12/2002...... 10/27/2003, 68 The following conditions: 1.1, Inc., Meridian, Idaho. FR 61106. 1.3, 2.1.2, 3.1, and the Appendix. (Boise/Ada County Maintenance Plan).

C. Wright Construction, Inc., T2-000033...... 7/8/2003....... 10/27/2003, 68 The following conditions: 2

Meridian, Idaho. FR 61106. (heading only), 2.5, (2.12, Table 2.2 as it applies to PM10), 2.14, 3 (heading only), 3.3, Table 3.2, 3.4, 3.5, 3.6, 3.7, 3.8, 3.10, 4 (heading only), 4.2, 4.3, 4.4, 4.7, 5, and Table 5.1. (Boise/Ada County Maintenance Plan). Nelson Construction Co., T2-020029...... 7/21/2003...... 10/27/2003, 68 The following conditions: 2 Boise, Idaho. FR 61106. (heading only), 2.12, 2.14, 3 (heading only), 3.3, 3.4, 3.6, 3.7, 3.9, 3.10, 3.11, 3.12, 4 (heading only), 4.3, 4.4, 4.5, 4.6, 5, and Table 5.1. (Boise/Ada County Maintenance Plan). Mike's Sand and Gravel, 001-00184...... 7/12/2002...... 10/27/2003, 68 The following conditions: 1.1, Nampa, Idaho. FR 61106. 1.3, 2.2.1, 3.1, and the Appendix. (Boise/Ada County Maintenance Plan). Idaho Concrete Co., Eagle, T2-020031...... 7/8/2003....... 10/27/2003, 68 The following conditions: 2 Idaho. FR 61106. (heading only), 2.5, 2.13, 3 (heading only), 3.3, 3.4, 3.6, 3.7, 3.8, 4 (heading only), and Table 4.1. (Boise/ Ada County Maintenance Plan). [[Page 31938]] Idaho Concrete Co., Eagle, T2-020032...... 7/8/2003....... 10/27/2003, 68 The following conditions: 2 Idaho. FR 61106. (heading only), 2.5, 2.13, 3 (heading only), 3.3, 3.4, 3.6, 3.7, 3.8, 4 (heading only), and Table 4.1. (Boise/ Ada County Maintenance Plan). Idaho Concrete Co. Eagle, T2-020033...... 7/8/2003....... 10/27/2003, 68 The following conditions: 2 Idaho. FR 61106. (heading only), 2.5, 2.13, 3 (heading only), 3.3, 3.4, 3.6, 3.7, 3.8, 4 (heading only), and Table 4.1. (Boise/ Ada County Maintenance Plan). The Amalgamated Sugar Company 027-00010...... 9/30/2002...... 10/27/2003, 68 The following conditions: 2 LLC, Nampa, Idaho. FR 61106 and (heading only), (2.7, Table 11/1/2004, 69 2.2 as it applies to PM10,) FR 63324. 2.10, 2.10.1, 2.10.2, 2.11, 2.11.1, 2.11.2, 2.11.3, 2.11.4, 2.11.5, 2.12, 2.12.1, 2.12.2, 2.12.3, 2.13, 2.13.1, 2.13.2, 2.13.3, 2.14, 2.14.1, 2.14.2, 2.16, 3 (heading only), (3.3, Table 3.2 as it applies to PM10), 3.5, 3.7, 3.8, 3.8.1, 3.8.2, 3.8.3, 3.8.4, 3.8.5, 3.8.6, 3.8.7, 3.8.8, 3.9, 4 (heading only), (4.3, Table 4.1 as it applies to PM10), 4.5, 4.6, 4.7, 5 (heading only), (5.3, Table 5.3 as it applies to PM10), 5.5, 5.9, 5.9.1, 5.9.2, 5.9.3, 5.9.4, 5.9.5, 5.9.6, 5.9.7, 5.9.8, 5.9.9, 5.10, 5.11, 6 (heading only), 6.3, Table 6.1, 6.5, 6.6, 6.7, 6.7.1, 6.7.2, 6.8, 7 (heading only), 7.3, Table 7.1 as it applies to PM10, 7.5, 7.7, 7.7.1, 7.7.2, 7.8, 8 (heading only), 8.3, Table 8.1, 8.5, 8.7, 8.7.1, 8.7.2, 8.8, 9 (heading only), 9.3, Table 9.1, 9.5, 9.7, 9.7.1, 9.7.2, 9.8, 10 (heading only), 10.3, Table 10.1, 10.6, 10.8, 10.8.1, 10.8.2, 10.9, 11 (heading only), 11.3, Table 11.2, 11.6, 11.8, 11.8.1, 11.8.2, 11.9, 12 (heading only), 12.3, Table 12.1, 12.5, 12.7, 12.7.1, 12.7.2, 12.8, 13 (heading only), 13.1 (except as it applies to condition 13.3, 13.3.1, 13.3.2, 13.5, 13.5.1, 13.5.2, 13.5.3, 13.6, 13.6.1, 13.6.2 and 13.9), Table 13.1 (except conditions 13.3, 13.5 and 13.6), (13.2, Table 13.2 as it applies to PM10), 13.2.1, 13.4, 13.4.1, 13.4.2, 13.4.3, 13.7, 13.7.1, 13.7.2, 13.8, 13.8.1, 13.8.2, 13.8.3, 13.10, and 13.11. (Boise/Ada County PM10 Maintenance Plan). Lake Pre-Mix, Sandpoint, 777-00182...... 5/17/1996...... 6/26/2002, 67 The following conditions for Idaho. FR 43006. the cement silo vent: 1.1, 2.1.1, 2.1.2, 3.1.1, and 3.1.2. (Sandpoint nonattainment area plan). Interstate Concrete and 017-00048...... 8/2/1999....... 6/26/2002, 67 The following conditions: for Asphalt, Sandpoint, Idaho. FR 43006. the asphalt plant, 2.2, 3.1.1, 4.1, 4.1.1, 4.1.2, 4.2.1 (as it applies to the hourly PM10 emission limit in Appendix A), 4.2.2, 4.2.2.1, 4.2.2.2, and 4.2.2.3; for the concrete batch plant, 2.1, 3.1.1, 4.1, 4.1.1, and 4.1.2; Appendix A (as it applies to PM10 emission rates after 7/1/ 96) and Appendix B (as it applies after 7/1/96). (Sandpoint nonattainment area plan). Whiteman Lumber Company, 13-1420-062.... 7/16/1979 (date 7/28/1982, 47 Silver Valley TSP Cataldo, ID. issued). FR 32530. Nonattainment Area Plan. Potlatch Corporation, Pulp 13-1140-0001-00 7/5/1979 (date 7/28/1982, 47 Lewiston TSP Nonattainment and Paper Unit, Lewiston, ID. issued). FR 32530. Area Plan. Potlatch Corporation, 13-1140-0003... 7/5/1979 (date 7/28/1982, 47 Lewiston TSP Nonattainment Clearwater Unit, Lewiston, issued). FR 32530. Area Plan. ID. Coast Trading Company, Inc., 13-1140-0011... 6/29/1979 (date 7/28/1982, 47 Lewiston TSP Nonattainment Lewiston, ID. issued). FR 32530. Area Plan. Lewis-Clark Terminal 13-1140-0010... 6/29/1979 (date 7/28/1982, 47 Lewiston TSP Nonattainment Association, Lewiston, ID. issued). FR 32530. Area Plan. Poe Asphalt, Lewiston, ID.... 0880-0008...... 3/1/1976 7/28/1982, 47 Lewiston TSP Nonattainment (effective FR 32530. Area Plan. date). FMC Corporation, Pocatello, 13-1260-0005... 2/26/1980 (date 7/28/1982, 47 Pocatello TSP Nonattainment ID \2\. issued). FR 32530. Area Plan. J.R. Simplot, Pocatello, ID.. 13-1260-0006-00 3/4/1980 (date 7/28/1982, 47 Pocatello TSP Nonattainment issued). FR 32530. Area Plan. Idaho Portland Cement 13-0080-0004-00 7/18/1979 (date 7/28/1982, 47 Pocatello TSP Nonattainment Company, Inkom, ID. issued). FR 32530. Area Plan. J.R. Simplot Company, Conda, 13-0420-0021-00 7/18/1979 (date 7/28/1982, 47 Soda Springs TSP Nonattainment ID. issued). FR 32530. Area Plan. Beker Industries, Conda, ID.. 13-0420-0003-00 7/18/1979 (date 7/28/1982, 47 Soda Springs TSP Nonattainment issued). FR 32530. Area Plan. Monsanto, Soda Springs, ID... 13-0420-0001-00 7/18/1979 (date 7/28/1982, 47 Soda Springs TSP Nonattainment issued). FR 32530. Area Plan. Kerr McGee, Soda Springs, ID. 13-0420-0002-00 7/18/1979 (date 7/28/1982, 47 Soda Springs TSP Nonattainment issued). FR 32530. Area Plan. J.R. Simplot, Pocatello, Air Pollution 4/5/2004....... 7/13/2006, 71 The following conditions: Idaho. Operating FR 39574. Cover page, facility Permit No. T1- identification information 9507-114-1; only, #300 Sulfuric Acid Facility Plant, Permit Conditions Number No. 077- 16.1, 16.10, 16.11, #400 00006. Sulfuric Acid Plant, Permit Condition 17.1, 17.7, 17.10, 17.11, Phosphoric acid plant, Permit Condition 12.3, 12.13, Granulation No. 3 Process, Permit Condition 9.2.1, Granulation No. 3 stack, 9.17 (except 9.17.1 through 9.17.6), Reclaim Cooling Towers, Permit Condition 14.2, 14.6.1, Babcock & Wilcox Boiler, Permit Condition 6.4, 6.12, HPB&W Boiler, Permit Condition 5.3, 5.13 through 5.18, 5.21. J.R. Simplot, Pocatello, Compliance 4/16/2004...... 7/13/2006, 71 The following conditions: No. Idaho. Agreement & FR 39574. 300 Sulfuric Acid Plant; Voluntary Condition 8 and 9. No. 400 Order Idaho Sulfuric Acid Plant; Code 39-116A. Condition 10, 11, and 12. Granulation No.1 Plant; Condition 14. Granulation No.2 Plant; Condition 15. Compliance and Performance Testing; Condition 16. The Amalgamated Sugar Company T2-2009.0105... 12/23/2011 4/28/2014, 79 The following conditions: 1.2, LLC--Nampa Factory, Nampa, (date issued). FR 23273. including the table of Idaho. Regulated Emission Point Sources Table, 3.2, 3.3 (first paragraph only), 3.4, 3.5, 3.6, 3.7, 3.8, 3.9, 3.11, 3.13, 3.14, 3.15, 3.16, and 4.1. P4 Production, L.L.C., Soda T2-2009.0109... 11/17/2009 6/22/2011, 76 The following conditions: 1.2 Springs, Idaho. (date issued). FR 36329. (including Table 1.1), 2.3, 2.4, 2.5, 2.6, 2.7, and 2.8. (Regional Haze SIP Revision). [[Page 31939]] Clearwater Paper Corp, T1-2020.0024... 3/30/2023...... 9/5/2025, 90 FR Permit conditions 5.4, 5.5, Lewiston, Idaho. 42821. 5.6, 5.7, 5.10, 5.11, 5.12, 5.13, 5.14, 5.15, 7.1, 7.4, 7.9, 7.10, 8.1, 8.6, 9.1, 9.2, 9.6, 9.11, 26.22, 26.23, 26.26, 26.27, 26.28, and 26.29 only. ITAFOS Conda LLC, Soda T1-2016.0015... 3/2/2022....... 9/5/2025, 90 FR Permit conditions 5.1, 5.4, Springs, Idaho. 42821. 5.5, 5.11, 16.22, and 16.23 only. Northwest Pipeline LLC, Soda Compliance 9/1/2023....... 9/5/2025, 90 FR Springs, Idaho. Agreement 42821. Schedule Case No. E- 2023.0011. P4 Production LLC, Soda Compliance 11/27/2021..... 9/5/2025, 90 FR Springs, Idaho. Agreement 42821. Schedule Case No. E- 2023.0013. P4 Production LLC, Soda T1-2020.0029... 12/23/2021..... 9/5/2025, 90 FR Permit conditions 4.2, 4.4, Springs, Idaho. 42821. 4.5, 4.6, 4.7, 4.19, 4.20, 4.21, 13.22, and 13.23 only. J.R. Simplot, Pocatello, T1-2017.0024... 3/29/2023...... 9/5/2025, 90 FR Permit conditions 15.9, 15.10, Idaho. 42821. 15.11, 15.19, 15.20, 15.21, 15.22, 15.25, 15.27, 16.6, 16.9, 16.10, 16.19, 16.20, 16.21, 16.22, 16.26, 16.27, 18.22, and 18.23 only. Tamarack Mill LLC, New T1-2019-0024... 10/17/2022..... 9/5/2025, 90 FR Permit conditions 5.2, 5.3, Meadows, Idaho. 42821. 5.5, 5.8, 5.17, 10.22, and 10.23 only. The Amalgamated Sugar Company P-2018.0011.... 2/15/2023...... 9/5/2025, 90 FR Permit condition 4.8 only. LLC--Nampa Factory, Nampa, 42821. Idaho. The Amalgamated Sugar Company T1-2019-0020... 11/5/2021...... 9/5/2025, 90 FR Permit conditions 4.3, 4.4, LLC--Paul Factory, Paul, 42821. 4.5, 4.7, 4.9, 4.10, 4.11, Idaho. 4.12, 4.15, 4.16, 4.18, 11.22, and 11.23 only. The Amalgamated Sugar Company T1-2016.0017... 1/21/2022...... 9/5/2025, 90 FR Permit condition 4.9 and 5.2 LLC--Twin Falls, Twin Falls, 42821. only. Idaho. ---------------------------------------------------------------------------------------------------------------- \1\ EPA does not have the authority to remove these source-specific requirements in the absence of a demonstration that their removal would not interfere with attainment or maintenance of the NAAQS, violate any prevention of significant deterioration increment or result in visibility impairment. Idaho Department of Environmental Quality may request removal by submitting such a demonstration to EPA as a SIP revision. \2\ Only a small portion of this facility is located on State lands. The vast majority of the facility is located in Indian Country. It is EPA's position that unless EPA has explicitly approved a program as applying in Indian country, State or local regulations or permits are not effective within the boundaries of that Indian country land for purposes of complying with the CAA. See 68 FR 2217, 2220 (January 16, 2003). * * * * * [FR Doc. 2026-10738 Filed 5-28-26; 8:45 am] BILLING CODE 6560-50-P

What this changes

Amends 1 part of the Code of Federal Regulations — the standing rules this notice rewrites.

Don't miss the comment window

One Click Politics alerts you on every deadline, hearing, and rule change.

See all rules with comments due soon →