2023-00239: Notice of Final Federal Agency Actions on Proposed Transportation Project in Florida

Get alerted when the next rule lands

New rules open for comment on their own schedule. Pick how you want to hear about them — we email you when one appears.

Publishing to members? Embed a live rule tracker on your own site — the proposed rules in your area and the comment deadlines closing on them, updating themselves. Free, one line of HTML.

Create a free account & build one →

Summary

The FHWA, on behalf of the FDOT, is issuing this notice to announce actions taken by FDOT and other Federal Agencies that are final agency actions. These actions relate to the proposed project along the Venetian Causeway which is approximately 2.5 miles long, and is primarily a two-lane undivided facility that provides a major link between the cities of Miami and Miami Beach in Miami-Dade County, Florida. The Causeway includes ten fixed span bridges and two bascule leaf span bridges over the Intracoastal Waterway (ICWW) extending from North Bayshore Drive (City of Miami) to Purdy Avenue (City of Miami Beach). The twelve bridges are numbered Bridge 1 to Bridge 12 from west to east. The proposed improvements replace the fixed spans of Bridges 2 through 12 with concrete arched beams and the bascule span at Bridge 10 with a double leaf bascule bridge to meet current design and safety requirements. The proposed typical section is 16-ft wider than the existing as a result of enhanced pedestrian and bicycle provisions, and consists of an 11-ft. lane, 7-ft. bicycle lane and 8-ft. sidewalk in each direction. The bascule span at Bridge 1 has already been replaced and is not included in the proposed improvements. These actions grant licenses, permits, or approvals for the project.

The agency’s own summary, as published.

Don't miss the comment window

One Click Politics alerts you on every deadline, hearing, and rule change.

See all rules with comments due soon →