Electricity Act, 1998, S.O. 1998, c. 15, Sched. A

Section 28.1

Exceptions for specified load facilities

Cite as Electricity Act, 1998, S.O. 1998, c. 15, Sched. A, s. 28.1 · current to November 11, 2026 · consolidated from April 24, 2026 · read from e-Laws on November 17, 2026

The text

(1) In this section, “specified connection requirements” means, in relation to a specified load facility, (a) any conditions, requirements or limitations that the regulations specify must be met for the specified load facility to be connected or reconnected to a transmission system or distribution system, as applicable, (b) any approvals that the regulations specify must be obtained for the specified load facility to be connected or reconnected to a transmission system or distribution system, as applicable, and (c) any conditions, requirements or limitations of an approval described in clause (b); (“exigences précisées en matière de raccordement”) “specified load facility” means a facility or class of facilities, (a) that is a data centre and that meets any criteria that may be set out in the regulations, or (b) that, (i) withdraws or would, if it were connected to a transmission system or distribution system, be expected to withdraw electricity from the IESO-controlled grid or from the distribution system of a distributor who is licensed under Part V of the Ontario Energy Board Act, 1998, (ii) has or would, if it were connected to a transmission system or distribution system, be expected to have a demand for electricity at the point of connection to the transmission system or distribution system, as applicable, that exceeds the amount prescribed by the regulations, and (iii) meets any other criteria that may be set out in the regulations. (“installation de charge précisée”) 2025, c. 22, Sched. 1, s. 7. (2) Unless a transmitter or distributor is satisfied that the specified connection requirements have been complied with, the transmitter or distributor shall not, (a) connect a specified load facility to its transmission system or distribution system, as applicable; or (b) reconnect a specified load facility to the transmission or distribution system after the specified load facility was disconnected, in accordance with the regulations, as a result of the nonfulfillment or breach of any of the specified connection requirements. 2025, c. 22, Sched. 1, s. 7. (3) If, after a specified load facility is connected or reconnected to a transmission or distribution system, the transmitter or distributor to whose system the specified load facility is connected becomes aware that any of the applicable specified connection or reconnection requirements have not been fulfilled or have been breached, the transmitter or distributor shall follow the processes, and take the actions, that are prescribed by the regulations. 2025, c. 22, Sched. 1, s. 7. (4) For greater certainty, nothing in this section affects any right that a transmitter or distributor may have to impose requirements in respect of the connection, disconnection or reconnection of a specified load facility to the transmission system or distribution system, as applicable, as long as there is no conflict between those requirements and the requirements of this section. 2025, c. 22, Sched. 1, s. 7. (5) The regulations specifying conditions, requirements, limitations or approvals for the specified connection requirements may include criteria respecting economic development, job creation, anything provided for in this Act or any other matter the Lieutenant Governor in Council considers necessary or advisable. 2025, c. 22, Sched. 1, s. 7. (6) This section does not apply to a specified load facility in respect of which a connection request made in accordance with the Transmission System Code or the Distribution System Code issued under the Ontario Energy Board Act, 1998 was submitted to a transmitter or distributor, as applicable, before June 3, 2025. 2025, c. 22, Sched. 1, s. 7.
Read the Electricity Act, 1998 on e-Laws ↗