GENERAL, O. Reg. 282/98

Section 42.2

Cite as GENERAL, O. Reg. 282/98, s. 42.2 · current to November 11, 2026 · consolidated from November 9, 2026 · read from e-Laws on November 16, 2026

The text

(1) This section applies to land on which is installed machinery or equipment used to produce electricity from the sun or the wind or through anaerobic digestion of organic matter, if the production of electricity is ancillary to another use on the same site. O. Reg. 1/12, s. 3. (2) However, this section does not apply in any of the following circumstances: 1. If the land is used to produce electricity by a person who generates, distributes, transmits or retails electricity or another form of energy as the person’s principal business. 2. If subsection 42.3 (1) applies to the land. 3. If section 42.4 applies to the land. O. Reg. 1/12, s. 3. (3) Despite paragraph 1 of subsection (2), this section applies to land used by a renewable energy co-operative within the meaning of the Co-operative Corporations Act, the membership of which is restricted to natural persons, to produce electricity. O. Reg. 1/12, s. 3. (4) Despite paragraph 1 of subsection (2), this section applies to land used by any of the following entities to produce electricity, if the primary purpose of the entity is the generation of electricity and if the land on which the generation occurs is valued under subsection 19 (5) of the Act: 1. A sole proprietorship comprised of a person who carries on a farming business within the meaning of the Income Tax Act (Canada). 2. A co-operative corporation, all of whose members are persons who carry on such a farming business. 3. A partnership, all of whose partners carry on such a farming business. 4. A corporation, all of whose members or shareholders are persons who carry on such a farming business. O. Reg. 1/12, s. 3. (5) If the installed capacity of the machinery or equipment used to produce electricity from the sun or the wind or through anaerobic digestion of organic matter is 0.01 megawatts or less, the classification of the land (including a wind turbine tower that supports the machinery or equipment) is not changed and the current value of the land (including the wind turbine tower) is not increased as a result of the installation or use of the machinery or equipment. O. Reg. 1/12, s. 3. (6) If the installed capacity of the machinery or equipment used to produce electricity from the sun or the wind or through anaerobic digestion of organic matter is greater than 0.01 megawatts but not greater than 0.5 megawatts, the classification of the land is not changed as a result of the installation or use of the machinery or equipment. O. Reg. 1/12, s. 3. (7) If the installed capacity of the machinery or equipment used to produce electricity from the sun or the wind or through anaerobic digestion of organic matter is greater than 0.5 megawatts and if the land would be classified in a class other than the industrial class, but for the installation of the machinery or equipment, the land remains classified, in part, in that other class and is classified, in part, in the industrial class. The proportion of the land that remains classified in that other class is determined using the ratio, 0.5/A in which, “A” is the installed capacity of the machinery or equipment, expressed in megawatts. (8) The current value of land to which this section applies shall be determined based on its classification, but the current value of land that is determined under subsection 19 (5) of the Act continues to be determined under that subsection as if the land was used for farm purposes only. O. Reg. 1/12, s. 3.
Read the GENERAL on e-Laws ↗

Made under Assessment Act, R.S.O. 1990, c. A.31.