LANDFILLING SITES, O. Reg. 232/98

Schedule 3

Cite as LANDFILLING SITES, O. Reg. 232/98, Schedule 3 · current to November 11, 2026 · consolidated from October 31, 2011 · read from e-Laws on November 16, 2026

The text

Schedule 3 SERVICE LIVES — GEOMEMBRANE LINERS (Sections 6 and 10) Primary Liner — 150-Year Service Life 1. The geomembrane used as part of a landfilling site’s primary liner may be assumed to have a service life of 150 years, starting at the earlier of the mid-point of the site’s operating life and the tenth anniversary of the first deposit of waste in the waste fill zone, if the following conditions are met: 1. The geomembrane must be made of high density polyethylene (HDPE) and must have a thickness of at least 1.5 millimetres. 2. The oxidative induction time of the geomembrane must exceed, i. 100 minutes, as determined by ASTM D3895-95 (American Society for Testing and Materials Standard Test Method for Oxidative-Induction Time of Polyolefins by Differential Scanning Calorimetry), as it may be amended from time to time, or ii. 250 minutes, as determined by ASTM D5885-95 (American Society for Testing and Materials Standard Test Method for Oxidative-Induction Time of Polyolefin Geosynthetics by High-Pressure Differential Scanning Calorimetry), as it may be amended from time to time. 3. The oxidative induction time of the geomembrane after oven aging at 85 degrees Celsius for 90 days, as described in ASTM D5721-95 (American Society for Testing and Materials Standard Practice for Air-Oven Aging of Polyolefin Geomembranes), as it may be amended from time to time, must exceed, i. 80 per cent of the value for the original geomembrane, as determined by ASTM D3895-95 (American Society for Testing and Materials Standard Test Method for Oxidative-Induction Time of Polyolefins by Differential Scanning Calorimetry), as it may be amended from time to time, or ii. 80 per cent of the value for the original geomembrane, as determined by ASTM D5885-95 (American Society for Testing and Materials Standard Test Method for Oxidative-Induction Time of Polyolefin Geosynthetics by High-Pressure Differential Scanning Calorimetry), as it may be amended from time to time. 4. The geomembrane must be installed in direct and uniform contact with a suitable foundation or clayey liner. 5. The geomembrane must be protected against puncturing and load-induced damage at all times, including during installation. 6. During installation, care must be taken to, i. remove wrinkles in the geomembrane, ii. minimize stress concentration, iii. ensure high quality seams, iv. minimize differential settlement, v. minimize exposure to ultraviolet light, vi. prevent damage due to sliding, vii. prevent damage due to installation in cold conditions, and viii. prevent damage due to rodents. Secondary Liner — 350-Year Service Life 2. The geomembrane used as part of a landfilling site’s secondary liner may be assumed to have a service life of 350 years, starting at the earlier of the mid-point of the site’s operating life and the tenth anniversary of the first deposit of waste in the waste fill zone, if all of the conditions set out above for a 150-year service life are met with the following change: 1. The requirement that the geomembrane have a thickness of at least 1.5 millimetres is changed to a requirement that the geomembrane have a thickness of at least 2.0 millimetres.
Read the LANDFILLING SITES on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.