EXPLORATION, DRILLING AND PRODUCTION, O. Reg. 245/97
Section 6
Cite as EXPLORATION, DRILLING AND PRODUCTION, O. Reg. 245/97, s. 6 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026
The text
(1) The operator of a work other than a work used in association with a CAES project shall comply with the operating standards in the Provincial Standards for Oil, Gas and Salt Resources. O. Reg. 151/22, s. 5.
(2) Despite subsection (1), an operator of a work referred to in subsection (1) may depart from the Provincial Standards for Oil, Gas and Salt Resources if,
(a) it is reasonable in the circumstances to do so;
(b) the operator takes measures to prevent or limit damage that provide a standard of protection that is equal to the standard established in the Provincial Standards for Oil, Gas and Salt Resources; and
(c) before departing from the standards, the operator notifies the Ministry in writing of the intention to depart and the details and circumstances of the departure. O. Reg. 151/22, s. 5.
(3) Subsection (1) does not apply with respect to special projects. O. Reg. 424/23, s. 9.
Read the EXPLORATION, DRILLING AND PRODUCTION on e-Laws ↗
Made under Oil, Gas and Salt Resources Act, R.S.O. 1990, c. P.12.