EXPLORATION, DRILLING AND PRODUCTION, O. Reg. 245/97

Section 2.10

Cite as EXPLORATION, DRILLING AND PRODUCTION, O. Reg. 245/97, s. 2.10 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

If, after considering an application for a licence or a permit with respect to a well that will be used in association with a CAES project in a porous rock reservoir, the Minister determines that the licence or permit should be issued subject to certain adjustments to the surface area for the CAES project, the Minister shall not issue the licence or the permit until the applicant has satisfied the Ministry that all necessary surface and subsurface rights have been acquired by the applicant, including the surface, mineral, oil, gas and compressed air storage rights, whether through ownership or lease, for all lands on or under which the CAES works will be located and all lands that are to be included within the adjusted surface area of the CAES project. O. Reg. 151/22, s. 2.
Read the EXPLORATION, DRILLING AND PRODUCTION on e-Laws ↗

Made under Oil, Gas and Salt Resources Act, R.S.O. 1990, c. P.12.