EXPLORATION, DRILLING AND PRODUCTION, O. Reg. 245/97
Section 11
Cite as EXPLORATION, DRILLING AND PRODUCTION, O. Reg. 245/97, s. 11 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026
The text
(1) Any person having oil or gas rights in respect of a pool may apply to the Minister for an order to establish spacing units.
(2) If an operator discovers a pool of oil or gas on land and production of the oil or gas is possible, the operator shall apply to the Minister for an order to establish spacing units within 130 days after the TD date of the discovery well, unless otherwise instructed by the Minister.
(3) An application for a Minister’s order to establish spacing units shall be accompanied by,
(a) a plan of the land comprising the probable area of the pool showing,
(i) the location of the discovery well in relation to the boundaries of the land, roadways and topographical features of the area, and
(ii) the names of all persons having a working interest or a royalty interest in respect of the pool, the type of interest held by each and the property boundaries of each; and
(b) a technical report of,
(i) the geology of the discovery,
(ii) the type of reservoir,
(iii) the production and reservoir drainage capability of the discovery well and any subsequent well drilled into the pool, and
(iv) the geological and engineering rationale for the size and location of the proposed spacing units.
(4) The applicant shall send, by regular prepaid mail, notice of the application together with a copy of the plan of the land described in clause (3) (a) to the persons mentioned in subclause (3) (a) (ii) within five days after making the application.
(5) Except where the Minister has otherwise approved, no person shall drill a development well into a pool referred to in subsection (1) until a spacing order is issued. O. Reg. 22/00, s. 4.
Read the EXPLORATION, DRILLING AND PRODUCTION on e-Laws ↗
Made under Oil, Gas and Salt Resources Act, R.S.O. 1990, c. P.12.