GENERAL, O. Reg. 244/97

Section 0.9

Cite as GENERAL, O. Reg. 244/97, s. 0.9 · current to November 11, 2026 · consolidated from November 28, 2025 · read from e-Laws on November 16, 2026

The text

(1) An applicant for an amendment of a licence or site plan under section 13.1 of the Act or to amend an aggregate permit to lower the depth of extraction from above the water table to below the water table in that area shall follow the notification and consultation requirements set out in sections 0.3, 0.4 and 0.5, with necessary modifications. O. Reg. 466/20, s. 2 (1). (2) Despite subsection (1), an applicant is not required to publish the notice in a newspaper or to post a sign in accordance with clauses 0.4 (1) (b) and (c), or hold a public information session in accordance with subsection 0.5 (3) if the existing licence, permit or site plan allows excavation below the water table in another area of the site. O. Reg. 466/20, s. 2 (1).
Read the GENERAL on e-Laws ↗

Made under Aggregate Resources Act, R.S.O. 1990, c. A.8.