GENERAL, O. Reg. 244/97

Section 0.12

Cite as GENERAL, O. Reg. 244/97, s. 0.12 · current to November 11, 2026 · consolidated from November 28, 2025 · read from e-Laws on November 16, 2026

The text

(1) The conditions set out in this section apply only to licences and permits that are issued on or after April 1, 2021. O. Reg. 466/20, s. 2 (1). (2) A licence, aggregate permit or wayside permit is subject to the following conditions: 1. The licensee or permittee shall apply water or another provincially approved dust suppressant to internal haul roads and processing areas, as necessary to mitigate dust, if the pit or quarry is located within 1,000 metres of a sensitive receptor. 2. The licensee or permittee shall equip any processing equipment that creates dust with dust suppressing or collection devices if it is located within 300 metres of a sensitive receptor. 3. The licensee or permittee shall obtain an environmental compliance approval under the Environmental Protection Act where required to carry out operations at the pit or quarry. 4. The licensee or permittee shall obtain a permit to take water under the Ontario Water Resources Act where required to carry out operations at the pit or quarry. O. Reg. 466/20, s. 2 (1). (3) A licence or aggregate permit is subject to the following conditions: 1. The licensee or permittee shall ensure that fuel storage tanks are installed and maintained in accordance with the Technical Standards and Safety Act, 2000. 2. The licensee or permittee shall ensure that a spill contingency plan is developed prior to any operation of the pit or quarry, and followed during the operations. O. Reg. 466/20, s. 2 (1). (4) A Class B licence, wayside permit or aggregate permit is subject to the condition that the licensee or permittee must mitigate the amount of noise emitted at the source with appropriate noise attenuation devices and site design if there is a sensitive receptor situated, (a) within 500 metres of the boundary of the site in the case of a Class B licence or an aggregate permit; or (b) within 150 metres of the boundary of the site in the case of a wayside permit. O. Reg. 466/20, s. 2 (1). (5) A licence, aggregate permit or wayside permit that authorizes blasting at the site is subject to the following conditions: 1. No blasting shall occur on a holiday, or between 6 p.m. and 8 a.m., unless the permittee holds an aggregate permit and there is no sensitive receptor located within 2,000 metres of the area in which the blasting takes place. 2. The licensee or permittee shall monitor all blasts for ground vibration and blast overpressure and prepare blast monitoring reports in accordance with provincial guidelines on limits on blast overpressure and ground vibration for blasting operations, unless the permittee holds an aggregate permit and there is no sensitive receptor located within 500 metres of the area in which the blasting takes place. 3. The licensee or permittee shall retain the blast monitoring reports prepared under paragraph 2 for a period of seven years after each blast. O. Reg. 466/20, s. 2 (1). (6) A licence is subject to the following condition: 1. The licensee shall mitigate the amount of dust generated at the site of the pit or quarry to minimize any off-site impact. O. Reg. 466/20, s. 2 (1). (7) An aggregate permit is subject to the following conditions: 1. The holder of an aggregate permit shall mitigate the amount of dust generated at the site of the pit or quarry to minimize any off-site impact, unless there is no sensitive receptor within 1,000 metres of the boundary of the site of the aggregate permit. 2. The holder of an aggregate permit shall obtain an approval under the Crown Forest Sustainability Act, 1994 where required to harvest any trees within the site of the pit or quarry. O. Reg. 466/20, s. 2 (1). (8) A wayside permit is subject to the following condition: 1. The holder of a wayside permit shall mitigate the amount of dust generated at the site of the pit or quarry to minimize any off-site impact, unless there is no sensitive receptor within 300 metres of the boundary of the site of the wayside permit. O. Reg. 466/20, s. 2 (1). (9) A licence or aggregate permit is subject to the condition that the licensee or permittee shall track and report the quantity of recycled aggregate removed from the site each month in an annual production report. O. Reg. 466/20, s. 2 (1).
Read the GENERAL on e-Laws ↗

Made under Aggregate Resources Act, R.S.O. 1990, c. A.8.