CONSTRUCTION PROJECTS, O. Reg. 213/91
Section 89
Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 89 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026
The text
(1) This section applies with respect to formwork, falsework and re-shoring that includes,
(a) a tubular metal frame;
(b) a column whose effective length is dependent upon lateral restraints between the ends of the column;
(c) shores placed one upon another to form a supporting system that is more than one tier in height;
(d) shores which are three metres or more in height;
(e) a truss;
(f) members so connected to one another that a load applied to one member may alter or induce stress in another member; or
(g) a unitized modular formwork or falsework structure intended to be moved as a unit. O. Reg. 213/91, s. 89 (1).
(2) Formwork and falsework shall be designed by an engineer in accordance with good engineering practice and be installed or erected in accordance with the design drawings. O. Reg. 213/91, s. 89 (2); O. Reg. 375/22, s. 5.
(3) Formwork and falsework shall, before the placement of concrete, be inspected by an engineer or by a competent worker designated in writing by the engineer. O. Reg. 213/91, s. 89 (3); O. Reg. 375/22, s. 5.
(4) The person carrying out the inspection shall state in writing whether the formwork and falsework is installed or erected in accordance with the design drawings for it. O. Reg. 213/91, s. 89 (4).
(5) The constructor shall keep the design drawings and the statements on the project while the formwork or the falsework is in use. O. Reg. 213/91, s. 89 (5).
Read the CONSTRUCTION PROJECTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.