CONSTRUCTION PROJECTS, O. Reg. 213/91
Section 6
Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 6 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026
The text
(1) This section applies with respect to a project if,
(a) the total cost of labour and materials for the project is expected to exceed,
(i) $50,000, or
(ii) in the case of a project that is confined to a factory that manufactures or assembles automobiles, $250,000;
(b) the work is the erection or structural alteration of a building more than two storeys or more than 7.5 metres high;
(c) the work is the demolition of a building at least four metres high with a floor area of at least thirty square metres;
(d) the work is the erection, structural alteration or structural repair of a bridge, an earth-retaining structure or a water-retaining structure more than three metres high or of a silo, chimney or a similar structure more than 7.5 metres high;
(e) work in compressed air is to be done at the project;
(f) a tunnel, caisson, cofferdam or well into which a person may enter is to be constructed at the project;
(g) a trench into which a person may enter is to be excavated at the project and the trench is more than 300 metres long or more than 1.2 metres deep and over thirty metres long;
(g.1) the work is the construction, over frozen water, slush or wetlands, of an ice road for vehicles, machinery or equipment; or
(h) a part of the permanent or temporary work is required by this Regulation to be designed by an engineer. O. Reg. 213/91, s. 6 (1); O. Reg. 345/15, s. 2; O. Reg. 190/19, s. 1 (1); O. Reg. 375/22, s. 5.
(2) The constructor shall comply with subsection (3) or (4) before beginning work at the project. O. Reg. 145/00, s. 4.
(3) The constructor shall complete an approved notification form and file it at the Ministry office located nearest to the project or submit it electronically on a website of the government of Ontario. O. Reg. 145/00, s. 4; O. Reg. 242/16, s. 3.
(4) If the constructor believes that the work at the project will not take more than 14 days, the constructor may provide the relevant information to an inspector at the Ministry office located nearest to the project,
(a) by faxing the completed form to the inspector; or
(b) by providing the information that would be required to complete the form to the inspector by telephone. O. Reg. 145/00, s. 4.
(5) Despite subsection (2), the constructor may begin work at a project before complying with subsection (3) or (4) if the following conditions are met:
1. It is necessary to do the work immediately to prevent injury to people or damage to property.
2. Before beginning the work, the constructor gives an inspector notice of the information required in the form by telephone or fax. O. Reg. 145/00, s. 4.
(6) The constructor shall keep the completed notification form posted in a conspicuous place at the project or available at the project for review by an inspector. O. Reg. 145/00, s. 4.
(7) In this section,
“automobile” includes a van or truck with a gross vehicle weight rating of 14,000 pounds (6,350 kilograms) or less. O. Reg. 190/19, s. 1 (2).
Read the CONSTRUCTION PROJECTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.