CONSTRUCTION PROJECTS, O. Reg. 213/91

Section 324

Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 324 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026

The text

(1) If a portable direct current battery or a blasting machine is the source of current for blasting, the firing cables or wires, (a) shall not be connected to the source of current until immediately before the charges are fired; and (b) shall be disconnected immediately after the charges are fired. O. Reg. 213/91, s. 324 (1). (2) All firing cables or wires leading to a face shall be short-circuited while the leads from the blasting caps are being connected to one another and to the firing cables. O. Reg. 213/91, s. 324 (2). (3) No short-circuit of a firing cable or wire shall be removed until all workers have retreated from the face and are so located that, should a premature explosion occur, the workers are not endangered. O. Reg. 213/91, s. 324 (3). (4) A short-circuit shall be replaced immediately after the firing cables or wires are disconnected from the blasting machine or the blasting switch is opened. O. Reg. 213/91, s. 324 (4). (5) Separate firing cables or wires for firing charges shall be used for each work location. O. Reg. 213/91, s. 324 (5). (6) Firing cables or wires, (a) shall be located as far as is practicable from every other electrical circuit; and (b) shall not be permitted to come in contact with power, lighting or communication cables, or pipes, rails or other continuous metal grounded surfaces. O. Reg. 213/91, s. 324 (6).
Read the CONSTRUCTION PROJECTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.