CONSTRUCTION PROJECTS, O. Reg. 213/91
Section 300
Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 300 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026
The text
(1) A service shaft that will be over thirty metres deep when completed shall have a hoist with a conveyance consisting of a cage or car suitable for transporting workers. O. Reg. 213/91, s. 300 (1).
(2) A hoist shall be installed in the service shaft as soon as is practicable. O. Reg. 213/91, s. 300 (2).
(3) A hoist,
(a) shall have a headframe that is grounded for protection against lightning and is designed by an engineer;
(b) shall have guides to control the movement of the conveyance;
(c) shall have a device that automatically stops the conveyance when it runs beyond the normal limit of its travel; and
(d) shall have a brake on the hoisting machine that automatically stops and holds the conveyance if the hoist fails or the power to the hoist is interrupted. O. Reg. 213/91, s. 300 (3); O. Reg. 142/17, s. 33; O. Reg. 375/22, s. 5.
(4) A shaft in sound rock may be excavated to a depth of not more than thirty metres before the headframe and guides are installed on the hoist. O. Reg. 213/91, s. 300 (4).