CONSTRUCTION PROJECTS, O. Reg. 213/91

Section 290

Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 290 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026

The text

(1) A hoist operator shall operate and watch over a hoist and all machinery associated with the hoist to detect any hazardous conditions. O. Reg. 213/91, s. 290 (1). (2) A hoist operator shall report immediately to the supervisor in charge of the project any defects in the hoisting machinery and safety devices. O. Reg. 213/91, s. 290 (2); O. Reg. 142/17, s. 31. (3) The hoist operator shall test all safety devices on a hoisting apparatus to ensure that they function and shall perform the tests, (a) before a conveyance is first put into service on a project; (b) at least once every three months after being put into service on the project; and (c) daily, if the hoisting apparatus is used to hoist persons. O. Reg. 213/91, s. 290 (3). (4) The hoist operator shall make a record of tests performed under subsection (3). O. Reg. 213/91, s. 290 (4). (5) The hoist operator shall keep available for inspection at the project the record of tests performed under subsection (3). O. Reg. 213/91, s. 290 (5).
Read the CONSTRUCTION PROJECTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.