CONSTRUCTION PROJECTS, O. Reg. 213/91
Section 273
Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 273 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026
The text
(1) If a person is about to be conveyed by a hoist in a shaft, the pit bottom worker shall notify the hoist operator before the person enters the conveyance. O. Reg. 213/91, s. 273 (1).
(2) A hoist operator shall acknowledge every signal received by repeating the signal. O. Reg. 213/91, s. 273 (2).
(3) A signal to a hoist operator to move a conveyance shall be given only from the landing from which the conveyance is being moved. O. Reg. 213/91, s. 273 (3).
(4) A signal set out in Column 1 of the Table shall be used to communicate the meaning set out opposite to it in Column 2 between a hoist operator, the top or bottom of a shaft and all landings in the shaft:
TABLE
Item | Column 1 Code of signals | Column 2 Meaning
1. | Where the conveyance is in motion – 1 signal | STOP
2. | Where the conveyance is stationary – 1 signal | HOIST
3. | Where the conveyance is stationary – 2 signals together | LOWER
4. | Where the conveyance is stationary – 3 signals together (to be given before any person enters the conveyance) | Person will be on conveyance. OPERATE CAREFULLY.
(5) The supervisor in charge of a project may establish signals in addition to those set out in subsection (4) if required for the operation of a hoist on the project. O. Reg. 213/91, s. 273 (5).
(6) A notice setting out the signals used for a hoist shall be securely posted,
(a) where it is readily visible to the hoist operator; and
(b) at each landing of the hoistway. O. Reg. 213/91, s. 273 (6).
(7) The notice shall be on a board or a metal plate that is not less than 450 millimetres by 450 millimetres and shall be written in letters that are at least thirteen millimetres high. O. Reg. 213/91, s. 273 (7).
Read the CONSTRUCTION PROJECTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.