CONSTRUCTION PROJECTS, O. Reg. 213/91
Section 260
Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 260 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026
The text
(1) A heated room shall be provided for the use of underground workers. O. Reg. 213/91, s. 260 (1).
(2) The wet clothes of workers employed underground shall be dried using sanitary means in a change room on the project. O. Reg. 213/91, s. 260 (2).
(3) A change room,
(a) shall have an open floor area no smaller than the greater of,
(i) ten square metres, and
(ii) one square metre per worker on a shift;
(b) shall be equipped with mechanical ventilation that provides no less than six air changes per hour;
(c) shall have suitable drainage facilities;
(d) shall be kept at a temperature of at least 27 degrees celsius; and
(e) shall have, for every worker employed underground, a locker that locks. O. Reg. 213/91, s. 260 (3).
(4) Every change room shall be scrubbed once every twenty-four hours. O. Reg. 213/91, s. 260 (4).
(5) If workers are employed underground, a change room shall be provided with one shower and one washbasin for each group of ten or fewer workers. O. Reg. 213/91, s. 260 (5).
(6) Showers and washbasins provided in a change room shall be supplied with hot and cold water, soap or hand cleaner and paper towels or individual hand towels. O. Reg. 213/91, s. 260 (6).
Read the CONSTRUCTION PROJECTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.