CONSTRUCTION PROJECTS, O. Reg. 213/91

Section 239

Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 239 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026

The text

(1) A support system for the walls of an excavation shall be installed, (a) progressively in an excavation in Type 1, 2 or 3 soil; and (b) in advance of an excavation in Type 4 soil, if practicable. O. Reg. 213/91, s. 239 (1). (2) A support system for the walls of an excavation shall provide continuous support for it. O. Reg. 213/91, s. 239 (2). (3) No support system for the walls of an excavation shall be removed until immediately before the excavation is backfilled. O. Reg. 213/91, s. 239 (3). (4) A competent person shall supervise the removal of a support system for the walls of an excavation. O. Reg. 213/91, s. 239 (4).
Read the CONSTRUCTION PROJECTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.